You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Autonomous Environmental Routing Onboard (AERO)

    SBC: NEXTGEN FEDERAL SYSTEMS LLC            Topic: A17026

    The Autonomous Environmental Routing Onboard (AERO) system is an innovative software-hardware solution that performs onboard processing of environmental information from multiple sources to execute autonomous route adjustments, minimizing negative environmental impacts as well as leveraging advantageous conditions, for multi-rotor autonomous systems (MRAS) executing missions as a swarm.AERO is an ...

    SBIR Phase I 2017 Department of DefenseArmy
  2. Ultra-Durable Polyolefin Based Waterproofing Coating

    SBC: RESODYN CORPORATION            Topic: A16114

    The U.S. Army is interested in the development of innovative materials, films, coatings and technologies or manufacturing techniques which allow current U.S. Army airdrop related hardware and equipment to survive fresh and salt water operations with increased reliability and without damage and significant maintenance impact. Resodyn Corporation proposes for development a durable, moisture-impermea ...

    SBIR Phase I 2017 Department of DefenseArmy
  3. THERMOPHILIC MICROORGANISMS AS SOURCE OF HEAT STABLE OXIDASE AND PEROXIDASE

    SBC: J.k. Research            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  4. IMPROVED FORWARD-LOOKING INFRARED (IR) IMAGE SEGEMENTATION BY ITERATIVE TECHNIQUES: ALGORITHMS FOR REAL-TIME PROCESSING

    SBC: Mathematical Technologies, Inc            Topic: N/A

    ALGORITHMS WILL BE DEVELOPED FOR ENHANCEMENT AND SEGMENTATION OF FLIR IMAGES, WITH A VIEW TOWARD REAL-TIME IMPLEMENTATIONS ON SEQUENCES OF IMAGES ACQUIRED AT VIDEO-FRAME RATES. THE METHODOLOGY PIONEERED BY PERSONNEL ON THIS PROJECT, USING PROBABILISTIC MARKOV RANDOM FIELD MODELS AND COMPUTATIONAL METHODS SUCH AS SIMULATED ANNEALING (STOCHASTIC RELAXATION WITH ANNEALING), WILL BE EXTENDED IN TWO DI ...

    SBIR Phase I 1988 Department of DefenseArmy
  5. BIOMECHANICAL PROPERTIES OF RECIPROCATING MOTION FOR DIS- ABLED INDIVIDUALS WHILE CYCLING

    SBC: Motion Transfer Cycling            Topic: N/A

    ALTHOUGH BICYCLES HAVE LONG BEEN USED IN THE REHABILITATION OF NEUROMUSCULAR AND MUCULOSKELETAL CONDITIONS FOR BOTH LOW-ER AND UPPER EXTREMITIES, LITTLE RESEARCH HAS BEEN DONE TO INVESTIGATE THE EFFECTS OF THE TRADITIONAL CIRCULAR CRANKINGMOTION ON PATIENT REHABILITATION. RETURNING A PATIENCT TO OPTIMUM FUNCTION REQUIRES A VARIETY OF MEASURES TO INCREASE STRENGTH, RANGE OF MOTION, ENDURANCE (BOTH ...

    SBIR Phase I 1988 Department of Education
  6. FLOWING-GAS THERMOCOUPLE CALIBRATOR

    SBC: Resource Technologies Group            Topic: N/A

    A PROPOSED HIGH TEMPERATURE THERMOCOUPLE CALIBRATOR FOR USE IN FLOWING GAS STREAMS COMPRISES THREE SUBSYSTEMS: (A) A HOT GAS GENERATOR USING A PLASMA GENERATOR OR FLAT FLAME BURNER AS THE HEAT SOURCE; (B) A LASER DOPPLER VELOCIMETRY SYSTEM FOR MEASURING VELOCITY COMPONENTS IN THE NEIGHBORHOOD OF THE TEST PROBE; (C) A COMPUTERCONTROLLED TEMPERATURE MEASUREMENT SYSTEM THAT COMBINES SPECTROSCOPIC (PL ...

    SBIR Phase I 1987 Department of DefenseArmy
  7. MODEL FOR PORT SCATTER FROM LASERS

    SBC: Toomay Mathis & Associates Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
US Flag An Official Website of the United States Government