You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Assembly Advisor

    SBC: Creatibility Concepts            Topic: N/A

    This project researches and develops natural support mechanisms for people with intellectual disabilities that facilitate greater opportunities and independence in employment settings. This project demonstrates the technical merit, feasibility, and cost effectiveness of combining state-of-the-art portable wireless technology and sensor technology with an innovative approach to develop the first se ...

    SBIR Phase I 2010 Department of Education
  2. myPad

    SBC: Creatibility Concepts            Topic: N/A

    This project demonstrates the technical merit, feasibility, and cost effectiveness of combining portable console technology with an innovative approach and state-of-the-art software to deliver a universal console system capable of removing barriers in independent living settings. Phase I specifically focuses on helping aging adults safely and independently accomplish typical instrumental activitie ...

    SBIR Phase I 2010 Department of Education
  3. Solder-Plating Process Control

    SBC: Contamination Studies            Topic: N/A

    At CSL, Inc. the Sequential Electrolytic Reduction Analysis equipment will be optimized for both board and component manufacturing processes. Six manufacturers will be suppling product during this project. Our approach to optimization will be through applying SERA technologies to all board and component processes that directly relate to the solderability issues. CSL, Inc. will use a four phase app ...

    SBIR Phase I 1993 Department of DefenseArmy
  4. Heat Stable Alkaline Phosphatase from Thermophiles

    SBC: J.k. Research            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseArmy
  5. LOW COST HIGH PERFORMANCE CONTINUOUS FIBER CERAMIC COMPOSITES: 3-D BRAIDED PREFORMS AS SIC MATRIX COMPOSITES USING CVI

    SBC: Quadrax Advanced Materials            Topic: N/A

    3-D BRAIDED PREFORMS SHOULD INCREASE MECHANICAL PROPERTIES OF CERAMIC COMPOSITES IN ALL DIRECTIONS; ITS INTERLOCKING FIBER ARCHITECTURE SHOULD BE EFFECTIVE IN ARRESTING CRACKS, AND REMOVING CATASTROPIC FAILURE. THIS PROJECT ADDRESSES THE ISUES OF MERGING AN EFFECTIVE REINFORCEMENT SYSTEM WITH AN INEXPENSIVE CERAMIC MATRIX PROCESSING TECHNOLOGY TO DISCOVER A LOW COST MANUFACTURING ROUTE TO HIGH PER ...

    SBIR Phase I 1991 Department of DefenseArmy
  6. COMPUTATION OF NONLINEAR ELECTROMAGNETIC EFFECTS BY MEANS OF FREQUENCY-DOMAIN VOLUME-INTEGRAL EQUATIONS

    SBC: Sabbagh Associates, Inc.            Topic: N/A

    THERE IS A NEED TO DEVELOP SPECIAL PURPOSE ALGORITHMS FOR SOLVING ELECTROMAGNETIC COUPLING AND SCATTERING PROBLEMS, THAT WILL TAKE ADVANTAGE OF RECENT ADVANCES IN COMPUTER TECHNOLOGY. TO THAT END WE PROPOSE A NOVEL ALGORITHM THAT IS BASED ON SOLVING NONLINEAR VOLUME-INTEGRAL EQUATIONS IN THE FREQUENCY-DOMAIN. THIS METHOD APPEARS TO OFFER SEVERAL ADVANTAGES OVER OTHER TECHNIQUES: (A) IT WILL ALLOW ...

    SBIR Phase I 1991 Department of DefenseArmy
  7. EFFICIENT ASYMPTOTIC CLOSED FORM APPROXIMATIONS OF DYADIC GREEN'S FUNCTIONS FOR ANISOTROPIC SUBSTRATES

    SBC: Sabbagh Associates, Inc.            Topic: N/A

    NEW TYPES OF ANISOTROPIC MATERAILS, SUCH AS COMPOSITES, CERAMICS, AND HONEYCOMB STRUCTURE, ARE FINDING INCREASINGLY IMPORTANT APPLICATIONS IN HIGH-FREQUENCY ELECTROMAGNETICS. THESE APPLICATIONS RANGE FROM MICROWAVE AND MILLIMETER-WAVE INTEGRATED CIRCUITS AND OPTICAL DEVICES TO ANTENNA RADOMES AND RADAR ABSORBER MATERIALS. WHILE THE BASIC THEORY OF THE INTERACTION WITH ANISOTROPIC MATERIALS OF ELEC ...

    SBIR Phase I 1991 Department of DefenseArmy
  8. Develop Enironmental Monitoring Capability for Intergrating Recent Technological Advancements into a Hybrid Artificial Neural Network System

    SBC: SEACORP, LLC            Topic: N/A

    We propose to develop an Environmental Monitoring System by integrating various technologies to create a hybrid artificial neural network system. By functionally decomposing the requirements of environmental monitoring we can apply emerging technologies to fulfill these modularized requirements. Ten (10) years of experience indicate that the technologies directly applicable to specific requirement ...

    SBIR Phase I 1993 Department of DefenseArmy
  9. A Virtual Interface Simulation System for Battle Command Applications on Multi-Core and Cluster Architectures

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: A09041

    Distributed computing is used in a variety of fields and efficient data distribution among components is essential to the performance of such distributed systems. A new programming model that enables disparate software applications developed using a variety of different computer languages to share the required interface data while running concurrently on a cluster of multi-core computing nodes is ...

    SBIR Phase I 2010 Department of DefenseArmy
  10. 50- 100 Watt Wind Energy Harvesting in Light Tactical Applications

    SBC: Pine Ridge Products LLC            Topic: A09092

    Pine Ridge Products LLC will introduce a tactical micro wind turbine that is highly efficient, robust, easy to use, maintain and transport. The Army is requesting a renewable energy system to reduce the amount of fuel used for small power loads. A vehicle mounted, efficient wind turbine system would improve self sufficiency on site by decreasing the need for fossil fuels. This will increase reliab ...

    SBIR Phase I 2010 Department of DefenseArmy
US Flag An Official Website of the United States Government