You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Pocket Accessible Communications Enabler (ACE): Providing access to palmtop cmputer wireless communications technologies for individuals with mental retardation

    SBC: ABLELINK TECHNOLOGIES INC            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
  2. Pocket Money Coach: A portable money management system to facilitate community access for indeivduals with mental retardation

    SBC: ABLELINK TECHNOLOGIES INC            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
  3. Pocket Voyager: Making Palmtop Computers Accessible to Individuals with Mental Retardation

    SBC: ABLELINK TECHNOLOGIES INC            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
  4. Pocket Compass: A Palmtop Computer-Based Intelligent Aid for Individuals with Mental Retardation.

    SBC: ABLELINK TECHNOLOGIES INC            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
  5. QuestNet

    SBC: ABLELINK TECHNOLOGIES INC            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
  6. Embedded Sensor Technology for Solid Rocket Motor Health Monitoring

    SBC: BLUE ROAD RESEARCH            Topic: N/A

    "This Phase I SBIR will study the potential of a multi-axis fiber grating strain sensor system that is capable of monitoring strain internal to a solid rocket motor bondline. This multi-axis technology would allow unique multidimensional strain fieldanalysis via a non-intrusive, embedded optical sensor. This technology could not only be used to monitor solid rocket motors, but has a wide range of ...

    SBIR Phase I 2002 Department of DefenseArmy
  7. An Innovative dialysis regeneration cartridge for portable hemodialysis

    SBC: Chemica Technologies, Inc            Topic: N/A

    N/A

    SBIR Phase I 2002 Department of Education
  8. Novel Compact Short-Pulse Eyesafe Transmitter

    SBC: COHERENT TECHNOLOGIES, INC.            Topic: N/A

    "Compact, rugged and efficient imaging ladar transceivers are required for future autonomous navigation and missile guidance systems. Current systems do not simultaneously satisfy requirements for transceiver size, weight, prime power, robustness and highrange resolution. This is particularly true of the most expensive and complex transceiver subsystem - the ladar transmitter - which must provid ...

    SBIR Phase I 2002 Department of DefenseArmy
  9. High Brightness Beam-Coupler for High Power Diode Lasers

    SBC: COHERENT TECHNOLOGIES, INC.            Topic: N/A

    "High brightness lasers have been identified as a means of producing acceptably short and reliable munition ignition times in large caliber guns. For practical purposes, these lasers must be compact, low-cost, efficient and robust to withstand the harshshock environment. High power multiple emitter diode bars can meet these criteria, but poor beam quality (typical M2>1000 from a single 50W bar) ...

    SBIR Phase I 2002 Department of DefenseArmy
  10. Laser Communication System with Spatial Tracking for Moving Platforms

    SBC: COHERENT TECHNOLOGIES, INC.            Topic: N/A

    "Coherent Technologies Inc. (CTI) proposes to develop a laser communication system (LCS) coupled with a high-speed pointing and tracking scheme for greater than 1 Gb/s data rate applications in a battlefield environment. The LCS will provide eyesafeoperation with an engagement range up to 5 km between two moving platforms. The pointing and tracking unit will be designed to reduce the probability o ...

    SBIR Phase I 2002 Department of DefenseArmy
US Flag An Official Website of the United States Government