You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Dielectric Resonator Antenna

    SBC: MINERVA SYSTEMS & TECHNOLOGIES LLC            Topic: N093173

    The objective of this proposal is to design and develop multimode dielectric resonator antennas (DRAs) operating in a wide frequency band from 30 MHz to 2 GHz covering VHF/UHF Line-of-site (LOS) communications, UHF Satellite communications, and L band including GPS frequencies. The DRA elements have many advantages such as wideband nature, small size, and high power capability as compared with mic ...

    SBIR Phase I 2010 Department of DefenseNavy
  2. Ultra Wide Bandwidth High Dynamic Range Digital ISR Receivers for the submarine force

    SBC: SEACORP, LLC            Topic: N101059

    This effort to improve the capabilities of the ESM system will increase the reliability and reduce lifecycle support costs of the Radar Wideband (RWB) subsystem on submarines. Analog to digital converter (A/D) based digital receivers will be applied to yield improvements in Radar signal acquisition and processing. In-phase and Quadrature (I/Q) data streams will be created from which intra pulse mo ...

    SBIR Phase I 2010 Department of DefenseNavy
  3. 50- 100 Watt Wind Energy Harvesting in Light Tactical Applications

    SBC: Pine Ridge Products LLC            Topic: A09092

    Pine Ridge Products LLC will introduce a tactical micro wind turbine that is highly efficient, robust, easy to use, maintain and transport. The Army is requesting a renewable energy system to reduce the amount of fuel used for small power loads. A vehicle mounted, efficient wind turbine system would improve self sufficiency on site by decreasing the need for fossil fuels. This will increase reliab ...

    SBIR Phase I 2010 Department of DefenseArmy
  4. Modular Perfusion Bioreactor for Tissue Engineering

    SBC: RESODYN CORPORATION            Topic: OSD09H11

    This project will develop and demonstrate a prototype Modular Perfusion Bioreactor (MPB) for tissue engineering applications. While many unique styles of bioreactors have been proposed for various types of stem cell and tissue cultures, there is not a single, easy-to-use device that accommodates the multiple diverse needs of multiple tissue culture types.. In order to take advantage of recent ad ...

    SBIR Phase I 2010 Department of DefenseArmy
  5. Improved Mobile User Objective System (MUOS) Metaferrite Based Antenna for SATCOM

    SBC: MINERVA SYSTEMS & TECHNOLOGIES LLC            Topic: A12045

    The objective of this proposal is to design and develop UHF Satellite communications (SATCOM) circular polarized antennas using advanced metamaterials to achieve high gain performance with smaller dimensions (i.e., size and weight). The metamaterials we propose belong to a class of magneto-dielectric materials. The advantages and disadvantages of dielectric loading applied to electromagnetic devi ...

    SBIR Phase I 2012 Department of DefenseArmy
  6. Power-Efficient Adaptive-and-Robust Link OFDM (PEARL-OFDM)

    SBC: Applied Radar, Inc.            Topic: N093218

    Key obstacles to extending OFDM to wireless links and networks at high-frequencies and dynamic channels are inherent low performance to Doppler and power amplifiers operation with high back-off. Other significant obstacles are multipath and impulsive noise. PEARL-OFDM combines a layered architecture with technologies that mitigate such obstacles and enable full-range rates that maximizes connectiv ...

    SBIR Phase I 2010 Department of DefenseNavy
  7. Affordable Low-Profile Wideband SATCOM Antennas (LPWSA) for Airborne Platforms

    SBC: Applied Radar, Inc.            Topic: A11132

    The proposal will develop multiple design concepts, conduct a trade study, and identify the three (3) most promising concepts for affordable low-profile and wideband satellite communication antennas (LPWSA) with high data rate capability and minimum airstream protrusion for airborne platforms. Specifically, the study will investigate several modified hybrid low-profile antenna array concepts with ...

    SBIR Phase I 2012 Department of DefenseArmy
  8. Development of Low Temperature Ultracapacitor

    SBC: Yardney Technical Products, Inc.            Topic: A12aT010

    The objective of this Phase 1 effort is to develop an asymmetric supercapacitor (ASC) that provides>10 Wh/kg energy density and a high power density, and maintains this performance down to -55 degrees C. Yardney Technical Products (YTP), a recognized specialty high energy battery manufacturer in Pawcatuck, CT in collaboration with the Jet Propulsion Laboratory (JPL) proposes to design, develop and ...

    STTR Phase I 2012 Department of DefenseArmy
  9. Wideband Multi-Channel AESA Manifolds

    SBC: Applied Radar, Inc.            Topic: N101020

    Multi-channel array manifolds are required for wideband AESA applications. In modern solid-state AESA arrays, MMIC-based T/R modules generally utilize digitally-controlled phased shifters to steer the beam on transmit and receive. The given phase value is only accurate at one frequency, and so for wide bandwidths of several hundred MHz (at X-band for example), the beam does not get formed properly ...

    SBIR Phase I 2010 Department of DefenseNavy
  10. Advanced Common Integrative, Intelligent, Customizable and Scalable Automated Logistics Environment (ALE) Framework

    SBC: Synesis7            Topic: N112103

    Our goal through this project is to demonstrate the feasibility and enterprise-wide benefits of Synesis7"s proposed approach for getting to an advanced common integrative, intelligent Automated Logistics Environment (ALE) planning, development, technology, integration, and deployment framework ("ALE Framework") solution. Establishing technical, operational, cost and commercial feasibility will be ...

    SBIR Phase I 2012 Department of DefenseNavy
US Flag An Official Website of the United States Government