You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Agent-Enabled Logistics Enterprise Intelligence System (AELEIS)

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: A09172

    Current Army logistics systems contain massive amounts of data that need to be effectively extracted into actionable information. But, the databases themselves do not contain all that is needed to make it actionable. The Army needs an effective Enterprise Intelligence System to find data from many sources, process it in an integrated fashion, and disseminate actionable information on the readiness ...

    SBIR Phase I 2010 Department of DefenseArmy
  2. 50- 100 Watt Wind Energy Harvesting in Light Tactical Applications

    SBC: Pine Ridge Products LLC            Topic: A09092

    Pine Ridge Products LLC will introduce a tactical micro wind turbine that is highly efficient, robust, easy to use, maintain and transport. The Army is requesting a renewable energy system to reduce the amount of fuel used for small power loads. A vehicle mounted, efficient wind turbine system would improve self sufficiency on site by decreasing the need for fossil fuels. This will increase reliab ...

    SBIR Phase I 2010 Department of DefenseArmy
  3. Modular Perfusion Bioreactor for Tissue Engineering

    SBC: RESODYN CORPORATION            Topic: OSD09H11

    This project will develop and demonstrate a prototype Modular Perfusion Bioreactor (MPB) for tissue engineering applications. While many unique styles of bioreactors have been proposed for various types of stem cell and tissue cultures, there is not a single, easy-to-use device that accommodates the multiple diverse needs of multiple tissue culture types.. In order to take advantage of recent ad ...

    SBIR Phase I 2010 Department of DefenseArmy
  4. Optimum Control of Induction Generators for Water Current Energy Harnessing

    SBC: Electro Standards Laboratory, Inc.            Topic: 815

    Optimization of generator performance and maximization of output power are difficult to attain in the generation of hydro-power. This is due to the changing water conditions and corresponding changes in the form of available energy. ESL proposes to use self-tuning controls in combination with a suitably chosen and optimized generator driven by hydro-energy and condition it for distribution to then ...

    SBIR Phase I 2010 Department of Commerce
  5. An Enhanced Performance Training and Support System for Individuals with Autism Spectrum Disorders

    SBC: The Prevention Group, LLC            Topic: N/A

    This project develops and evaluates the Enhanced Performance Training and Support System (EPTSS) to train and support individuals with autism spectrum disorder (ASD) in: behavioral training, modeling, self-management, and visual cues using available technology such as the iPod Touch/iPad. Phase I assesses the feasibility of an enhanced job performance system utilized in multiple work environments ...

    SBIR Phase I 2010 Department of Education
  6. Compact Efficient Electrically Small Broadband Antennas

    SBC: MINERVA SYSTEMS & TECHNOLOGIES LLC            Topic: A10131

    The objective of this proposal is to design and develop compact, efficient, electrically small, broadband antennas that are capable of handling high voltages of greater than 100 kV, and fit into small geometrical spaces of less than 40 mm in diameter and 50 mm in length. Previously insurmountable challenges to achieving the stringent requirements of simultaneous compact size, wider bandwidths, an ...

    SBIR Phase I 2010 Department of DefenseArmy
  7. Causal-View

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: A10090

    The ability to see and understand the data is critical to situational awareness. As data becomes more prevalent, the need to link causal data into actionable information becomes paramount. Analysts are faced with mountains of data, and finding that piece of relevant information is the proverbial needle in a haystack, only with dozens of haystacks. Analysis tools that facilitate identifying causal ...

    SBIR Phase I 2010 Department of DefenseArmy
  8. Flat Panel Shelter-Mountable Phased Array Antenna for DoD Systems of Record

    SBC: MINERVA SYSTEMS & TECHNOLOGIES LLC            Topic: A09176

    The objective of this proposal is to develop innovative concept designs for flat-panel, low-profile, smallest possible aperture, phased-array GBS receive antennas in the 10.5 – 13.5 GHz Ku-band and 20.2 – 21.2 GHz K/Ka-band. Furthermore, the objectives include that the antenna be realized within a 40” cross section. Conventional array antenna designs to meet the G/T requirement ...

    SBIR Phase I 2010 Department of DefenseArmy
US Flag An Official Website of the United States Government