You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Lithium Ion Battery Separator with High Temperature Stability
SBC: OPTODOT CORPORATION Topic: A11065A separator involving composite materials is provided that meets the lithium ion battery requirements for separators with high temperature stability at 220C and above and with mechanical strength and flexibility. The heat stable properties are obtained from using aluminum oxide particles at over 75% by weight that prevent any shrinkage of the composite separator. The mechanical strength without ...
SBIR Phase I 2011 Department of DefenseArmy -
Mobile Bioelectric Filtration System (MBFS): Accelerated Anaerobic Digestion via Bio-Electrochemical Reactions
SBC: CAMBRIAN INNOVATION, INC. Topic: A11051Current United States military contingency operations require more sustainable Forward Operating Bases (FOBs). Major problems for FOBs include the supply of fuel and water and the removal and treatment of wastewater. Microbial Fuel Cells and Bio-electrochemical systems utilize newly discovered electrically active microbes to generate direct electric current and other value-added products while tre ...
SBIR Phase I 2011 Department of DefenseArmy -
Quantitative Analysis of ALON and Spinel Dome Blanks
SBC: SURMET CORP Topic: A11078Multimode seekers are receiving significant attention as a way to provide more capability in the same package. In some cases, both optical and millimeter wave seekers are being combined in a way that requires a common aperture. The requirements for such a system place a tremendous burden on the design and production of the dome. The optical requirements on such domes drive the associated tolerance ...
SBIR Phase I 2011 Department of DefenseArmy -
MenuChoice:Nutrition Program for Community-based Group Homes for Persons with Intellectual or Developmental Disabilities
SBC: GOOD NUTRITION IDEAS, LLC Topic: 84133S1This project develops a nutrition program, MenuChoice©, for community-based group homes for persons with intellectual or developmental disabilities (IDD). Adults with IDD experience poorer nutritional health and more nutrition-related secondary conditions than adults without disabilities. These conditions are preventable and modifiable through a safe, healthful diet, but multiple challenges precl ...
SBIR Phase I 2011 Department of Education -
Measuring Fuel Quantity in Collapsible Fabric Storage Tanks
SBC: AGILTRON, INC. Topic: A11067Leveraging on Agiltron"s extensive experience in fiber sensor development, we propose to develop a customized sensing system with the ability to measure fuel quantity in a collapsible tank. Based primarily on mature technologies and commercially available components, the proposed sensor system is simple in construction and ready to be implemented. In Phase I, a small scale sensor will be built for ...
SBIR Phase I 2011 Department of DefenseArmy -
STEM Solar Explorations
SBC: Diversified Painting & CO Topic: N/APurpose: The need for all students to be well prepared in science has been well documented. The purpose of this project is to develop a solar learning lab platform to apply learning in the area of energy science. Project Activities: The researchers will design curricula materials, multi-media video clips, lesson plans, student activities, assessments, and a back-end system to house data generated ...
SBIR Phase I 2011 Department of Education -
Adversary Behavior Acquisition, Collection, Understanding, and Summarization (ABACUS) Tool
SBC: CHARLES RIVER ANALYTICS, INC. Topic: A11035Despite sophisticated collection technology and systems that attempt to fuse sensor data into actionable intelligence, our forces must still rely on individual judgments and dangerous close-range soldier sensing and searching to help identify those covert individuals who are most likely to act against our forces. To proactively uncover hostile adversary intent by exploiting multiple sources of exi ...
SBIR Phase I 2011 Department of DefenseArmy -
Efficient mid-range power transfer to multiple devices
SBC: AGILTRON, INC. Topic: A11007Agiltron proposes to fabricate a new type of portable inductively wireless battery charger station to relieve the logistic footprint and operation complexity of the wired power connection for charging battery-operated devices in the battlefield management. The wireless battery charger station will allow power transfers greater than 5 meters from the charging source with efficiency more than 50%. M ...
SBIR Phase I 2011 Department of DefenseArmy -
A High Resolution, Ultra High Frame Rate Visible Light Imager for High Speed Digital Photography
SBC: R3LOGIC, INC. Topic: N/A"3D-IC proposes to develop design specifications for a 12 megapixel 1000 frame / second digital output imager. The proposed design will be based on using a monolithic substrate for the photosensor array that is engineered to achieve high quantum efficiencyand good spectral response in visible light. The company proposes to investigate adaptation of its proprietary pixel-parallel processor core arc ...
SBIR Phase I 2002 Department of DefenseArmy -
Development of Web-driven Bioinformatic Platform for Microarrays
SBC: 3RD MILLENNIUM, INC Topic: N/A"The objective of this proposal is to create an innovative bioinformatics system for the management and analysis of microarray data. It will be a new generation of informatics system that goes well beyond any system presently available. The system will notonly allow users to track the generation of data with a flexible laboratory information management system (LIMS), but it will also allow users t ...
SBIR Phase I 2002 Department of DefenseArmy