You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DEVELOPMENT OF A MINIATURIZED ELECTRONIC COMPASS FOR USE IN PROVIDING DIRECTIONAL GUIDANCE TO VISUALLY IMPAIRED INDIVIDUALS
SBC: Arctos Research Topic: N/ADESIGN AND FABRICATION OF SOLID-STATE DIRECTION-INDICATING APPARATUS, WITH TILT-IMMUNITY, THAT PROVIDES AN AUDIBLE OR TACTILE INTERFACE WITH THE USER. REDUCED SIZE TO ALLOW ENCAPSULATION IN A TYPICAL WALKING CANE. A DEVICE WILL BE DESIGNED THAT WILL PROVIDE A VISUALLY IMPAIRED PERSON WITH AN INDICATION OF HORIZONTAL DIRECTION, WITH RESPECT TO THE EARTH'S MAGNETIC FIELD. THE DEVICE WILLALSO SIGNAL ...
SBIR Phase I 1990 Department of Education -
BIOLOGICAL PRODUCTION OF HYDROGEN
SBC: Engineering Resources, Inc. Topic: N/ACOAL CONTAINS APPROXIMATELY EQUAL MOLAR AMOUNTS OF HYDROGEN AND CARBON; SYNTHESIS OF LIQUID FUELS OR METHANE REQUIRES AT LEAST TWICE AS MUCH ADDITIONAL HYDROGEN. THE REMOVAL OF LARGE QUANTITIES OF HETERO-ATOM COMPONENTS FROM TAR SANDS OILS AND SHALE OILS REQUIRES LARGE AMOUNTS OF HYDROGEN. HYDROGEN PRODUCED CATALYTICALLY BY THE WATER GAS SHIFT REACTION IS EXPENSIVE, SERIOUSLY OBSTRUCTING THE APPLI ...
SBIR Phase II 1990 Department of Energy -
REMOTELY OPERATED AND MAINTAINED CASTING MACHINE FOR METALLIC NUCLEAR FUEL
SBC: CREARE LLC Topic: N/ATHE FUEL RECYCLE PROCESS FOR THE INTEGRAL FAST REACTOR (IRF)REQUIRES CASTING OF METALLIC NUCLEAR FUEL INTO RODS. CURRENTLY, A MOLD CASTING PROCESS IS USED. ASSOCIATED WITH THE OPERATION OF THIS METHOD ARE FEATURES WHICH ARE PROBLEMATIC FOR THE REMOTE OPERATION OF THE CASTING PROCESS. FOR EXAMPLE, SMALL PIECES OF BROKEN MOLD MUST OFTEN BE TEDIOUSLY SEPARATED FROM SMALL PIECES OF METALLIC FUEL. WE P ...
SBIR Phase I 1990 Department of Energy -
AN OIL FREE REGENERATIVE COMPRESSOR FOR CRYOGENIC REFRIGERATION SYSTEMS
SBC: CREARE LLC Topic: N/AN/A
SBIR Phase I 1990 Department of Energy