You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Lightweight Interaction and Storytelling Archive (LISA)

    SBC: DYNAMIC OBJECT LANGUAGE LABS INC.            Topic: SB172009

    The Phase 1 project developed a new method for real-time robotic motion planning. The Phase 1 system can prevent task-performing (semi)-autonomous agents from colliding with objects in their environment (e.g., navigating a quadcopter while it inspects an object and advises a human in a repair operation).  The new Phase 2 effort will build upon these initial results by extending the developed cap ...

    SBIR Phase II 2023 Department of DefenseDefense Advanced Research Projects Agency
  2. Integrated Ferrite Inductors and Transformers for Power Electronics with Ultra-low SWAP-C

    SBC: WINCHESTER TECHNOLOGIES LLC            Topic: A16020

    State-of-the-art power electronics use discrete components such as power magnetic inductors and transformers operating at < 1MHz, which suffer from a large SWAP-C (size, weight, power consumption, and cost). It has been challenging to achieve simultaneously high inductance, compact size, and high quality factors at 1~300MHz for integrated power electronics. In the completed Phase II Army STTR Phas ...

    STTR Phase II 2023 Department of DefenseArmy
  3. Improved Technology to Treat Drug-Resistant Bacterial Infections

    SBC: TRITON SYSTEMS, INC.            Topic: A21CT010

    Bacterial infections are particularly significant for military personnel in situations where there may be a long delay between the injury and treatment at a hospital or clinic. The development of an effective, portable light-based system which can operate in both military hospitals and far-forward situations is proposed. The proof-of-concept prototype developed in Phase I will be refined to be mor ...

    STTR Phase II 2023 Department of DefenseArmy
  4. Integrated Solution for Automatic Verification of Conformance of SOSA Modules and Waveforms Against Architectural Compliance Requirements

    SBC: VISTOLOGY, INC.            Topic: A19127

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
  5. The Electric Vehicle Battery Total Life Cycle (EVB-TLC) System for Improved Battery Management

    SBC: R-DEX SYSTEMS, INC.            Topic: A224016

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  6. Computationally Driven Reliability &amp; Repeatability for Wire Arc Additive Manufacturing of High Strength Maraging 250 Steel

    SBC: SOLVUS GLOBAL LLC            Topic: A21CT023

    Challenge: Reliable & repeatable production of large format, high performance components that are difficult to source using conventional casting and forging methods. We will Deliver: A physics-based modeling framework that enables reliable and repeatable large-format component-level production of high strength (>200 ksi) Maraging Steel produced via Wire-Arc Additive Manufacturing (WAAM). Proposal: ...

    STTR Phase II 2023 Department of DefenseArmy
  7. Engineering optimization engine for reducing weight, complexity and embodied carbon in steel construction

    SBC: QNECT LLC            Topic: A234P014

    Redacted.

    SBIR Phase I 2023 Department of DefenseArmy
  8. High Temperature Carbon Capture with Molten Borates for Building Material Production

    SBC: MANTEL CAPTURE, INC.            Topic: A234P014

    Redacted.

    SBIR Phase I 2023 Department of DefenseArmy
  9. HYDROS- Hybrid Diver Readiness Observation System

    SBC: ALTEC, INC            Topic: A234004

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  10. Team Assistance Research Platform for Search+ Tasks

    SBC: DYNAMIC OBJECT LANGUAGE LABS INC.            Topic: ST14B003

    The new Phase 2 effort will focus on the role of stories to dramatically support and enhance social interactions, teaming, and dynamic situations in operationally relevant use cases.  We draw from story representation and understanding technology from both CART II, and the ASIST RITA projects.  CART II focused on the ability of stories to capture situational awareness, task monitoring and pl ...

    STTR Phase II 2023 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government