You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. DEGRATION OF NUCLEAR PLANT TEMPERATURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1986 Nuclear Regulatory Commission
  2. FUNCTIONAL CONDITION OF SOLENOID-OPERATED VALVES USED IN NUCLEAR POWER PLANT SAFETY APPLICATIONS

    SBC: Pentek Inc.            Topic: N/A

    PENTEK WILL DEVELOP AND TEST A TECHNIQUE TO DETERMINE THE FUNCTIONALITY OF SOLENOID-OPERATED VALVES IN A NUCLEAR POWERPLANT BASED ON THE MEASUREMTNT AND ANALYSIS OF IN-RUSH CURRENT. THE TECHNIQUE WILL BE DEVELOPED SO THAT ALL MEASUREMENTS CAN BE MADE FROM OUTSIDE THE REACTOR BUILDING WITHOUT DISTRUBING ANY ELECTRICAL CONNECTIONS. THE ANALYSIS METHODS WILL BE DEVELOPED FOR ON-LINE USE WITH A PERSON ...

    SBIR Phase I 1986 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government