You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Active Radiation Shield

    SBC: GLOYER-TAYLOR LABORATORIES INC            Topic: T301

    In the Phase I effort, Gloyer-Taylor Laboratories LLC (GTL) verified the feasibility of generating power from space particle radiation. This effort successfully demonstrated electrical power production from a particle radiation source using an initial proof-of-concept device. The effort also identified a second approach that has the potential for even better power generation and offers enhanced ...

    STTR Phase II 2017 National Aeronautics and Space Administration
  2. High Performance Image Processing Algorithms for Current and Future Mastcam Imagers

    SBC: Applied Research LLC            Topic: T801

    In this project, Applied Research LLC (ARLLC), the University of Tennessee, Knoxville (UTK), and the Arizona State University (ASU) propose high performance image processing algorithms that will support current and future Mastcam imagers. The algorithms fuse the acquired Mastcam stereo images at different wavelengths to generate multispectral image cubes, which can then be used for high quality vi ...

    STTR Phase II 2017 National Aeronautics and Space Administration
  3. AlphaBear2

    SBC: SPRY FOX LLC            Topic: EDIES17R0006

    This project team will fully develop and test AlphaBear 2, a vocabulary learning game for grade 4 to 7 students. Vocabulary is a prerequisite for academic success, as it is linked to stronger performance across academic subjects and improved reading comprehension. It is more difficult for students to participate in educational activities without understanding the key vocabulary associated with tha ...

    SBIR Phase II 2017 Department of EducationInstitute of Education Sciences
  4. A Battery Management and Control System using a Universal Reconfigurable Architecture for Extended Health of Batteries in Hybrid and/or All-Electric Propulsion Systems

    SBC: X-Wave Innovations, Inc.            Topic: A201

    NASA seeks intelligent monitoring for hybrid and/or all electric propulsion systems, as well as methods to significantly extend the life of electric aircraft propulsion energy sources. From the available energy sources, Lithium-based batteries play a key role due to their high energy and power volumetric and gravimetric densities. The requirement to evolve towards more fuel efficient and more envi ...

    SBIR Phase II 2017 National Aeronautics and Space Administration
  5. Safety Analysis For Evaluating (SAFE) sUAS

    SBC: Intelligent Automation, Inc.            Topic: A202

    The primary goal of Air Traffic Management systems is to ensure safety of operations, in the air and on the ground. While they system have served the National Airspace (NAS) well over the years, the imminent introduction of Unmanned Aircraft Systems (UASs) poses a serious challenge. The variety, flexibility and accessibility of UASs ensures high demand for their use. The low-altitude, small-UAS (s ...

    SBIR Phase II 2017 National Aeronautics and Space Administration
  6. Stakeholder Web-Based Interrogable Federated Toolkit (SWIFT)

    SBC: Intelligent Automation, Inc.            Topic: A301

    There are three innovations in this proposed SWIFT project, all of which were identified during earlier effort. The first innovation involves the development of a web-accessible model invocation engine (the "Web-based" part of SWIFT) which was prototyped earlier, demonstrated to NASA/Ames in December 2016, and will be fully developed in the current proposed projectI. This model invocation engine ...

    SBIR Phase II 2017 National Aeronautics and Space Administration
  7. DAAS: Data Analytics for Assurance of Safety

    SBC: Intelligent Automation, Inc.            Topic: A303

    One of the challenges faced by the National Airspace (NAS) stakeholders in general and the Air Navigation Service Provider (ANSP) i.e., Federal Aviation Administration (FAA) in particular is the effective maintenance of safety in presence increasing demand by manned traffic and with introduction of Unmanned Air System (UAS) in the near future. Since there is going to be more traffic within in the ...

    SBIR Phase II 2017 National Aeronautics and Space Administration
  8. Color-XHDR- A Compact High-Speed Color Extreme High Dynamic Range Video Capability for Rocket Engine Testing

    SBC: INNOVATIVE IMAGING & RESEARCH CORP            Topic: H1002

    Innovative Imaging and Research proposes to develop a 21st Century color, high-speed extreme high dynamic range (Color-XHDR) video recording technology that will produce engineering-grade video to accurately document rocket motor firings at close range within a test cell without image saturation. This novel imaging system will include a compact, single focal plane array camera and end-to-end image ...

    SBIR Phase II 2017 National Aeronautics and Space Administration
  9. ERASMUS: Food Contact Safe Plastics Recycler and 3D Printer System

    SBC: TETHERS UNLIMITED, INC.            Topic: H1401

    A key goal of the Human Exploration and Operations Mission Directorate (HEOMD) from 2012 is to utilize the ISS for developing the systems and protocols necessary to humans to venture beyond low Earth orbit for extended durations, and with the push from Congress in 2015 to build a deep space habitat for a Mars mission by 2018, the goals of HEOMD are increasingly important to meet. The ERASMUS techn ...

    SBIR Phase II 2017 National Aeronautics and Space Administration
  10. Modular Advanced Networked Telerobotic Interface System (MANTIS)

    SBC: TETHERS UNLIMITED, INC.            Topic: H601

    With the goal to reduce astronaut time required to operate experiments on the ISS and advance automated and telerobotic technology, TUI proposes to collaborate with NanoRacks to develop a "Modular Advanced Networked Telerobotic Interface System" (MANTIS) that will integrate TUI?s existing KRAKEN robotic arm in a payload on the ISS. The MANTIS payload will reduce crew member burden to operate exper ...

    SBIR Phase II 2017 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government