You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Ad-Hoc Ground Based Counter-Fire System

    SBC: HYPERION TECHNOLOGY GROUP INC            Topic: N142086

    This proposal addresses the development of a Command Post and Acoustic Listening Posts for performing detection and automatic geo-location and classification of transient acoustic sounds associated with the firing of weapons, especially rockets, mortars, and artillery and the corresponding munitions impacts. Key components of the system are rugged low-noise infrasound sensors, state-of-the-art aco ...

    SBIR Phase II 2017 Department of DefenseNavy
  2. Affordable Compact HPRF/HPM Attack Warning System

    SBC: SA PHOTONICS, LLC            Topic: N152116

    SA Photonics’ Wideband Agile Threat Sensor (WATS) addresses the Navy’s need for an affordable and compact High-Power Radio Frequency / High-Power Microwave (HPRF/HPM) attack warning technology that detects, characterizes and precisely geo-locates HPRF threats while being fully immune to HPRFs. WATS consists of multiple completely passive HPM probes connected by fiber optic cables to an electro ...

    SBIR Phase II 2017 Department of DefenseNavy
  3. Airborne Vision Insect Optic Nautical Precision Landing

    SBC: Physical Optics Corporation            Topic: N152111

    Addressing the Navy need for a fast initializing, real-time, precision ship-relative navigation (PS-RN) system, Physical Optics Corporation (POC) proposes to advance development in Phase II of the Airborne Vision Insect Optic Nautical Precision Landing (AVION-PL) sensor, proven feasible in Phase I, for the Navy’s Sea-based Automatic Landing Recovery System (SALRS). AVION-PL is based on novel com ...

    SBIR Phase II 2017 Department of DefenseNavy
  4. Aircraft Carrier-based Precision Ship-Relative Navigation Guidance for Aircraft Landing under Emissions Control Conditions

    SBC: SA PHOTONICS, LLC            Topic: N15AT014

    SA Photonics has developed a concept for our Multiple Optical Beam Landing System (MOBLS) to provide autonomous landing of aircraft in RF denied environments. MOBLS utilizes multiple, redundant methods to determine the real-time location and bearing of the aircraft relative to the carrier-based landing strip. By having built in redundant modalities, MOBLS provides highly reliable landing informati ...

    STTR Phase II 2017 Department of DefenseNavy
  5. Air-Droppable At-Sea In-Water Lifting System

    SBC: ADVANCED TECHNOLOGY AND RESEARCH CORPORATION            Topic: N151061

    An SBIR Phase II program is proposed to continue the development of an innovative system called In-Water Container Lifting System (IWCLS).The IWCLS is to lift ISO shipping containers floating in the open ocean to the decks of Afloat Forward Staging Base and other vessels of opportunity.It fills a gap in enabling technology for lift-on/lift-off heavy container transfer in high sea conditions up to ...

    SBIR Phase II 2017 Department of DefenseNavy
  6. Airdroppable High Speed, Low Signature Craft

    SBC: MARITIME APPLIED PHYSICS CORPORATION            Topic: N04044

    The proposed effort will convert and existing air-dropped GARC hull and its mission elements from gasoline waterjet propulsion (Mercury Optimax) to unmanned diesel outdrive propulsion. This conversion will require: incorporation of a diesel engine and outdrive, hull internal structural changes to enable mounting of the engine and outdrive, exhaust and cooling system changes to accommodate the dies ...

    SBIR Phase II 2017 Department of DefenseNavy
  7. AlphaBear2

    SBC: SPRY FOX LLC            Topic: EDIES17R0006

    This project team will fully develop and test AlphaBear 2, a vocabulary learning game for grade 4 to 7 students. Vocabulary is a prerequisite for academic success, as it is linked to stronger performance across academic subjects and improved reading comprehension. It is more difficult for students to participate in educational activities without understanding the key vocabulary associated with tha ...

    SBIR Phase II 2017 Department of EducationInstitute of Education Sciences
  8. Alternative Power Supply for Uninterruptible Power Supply (UPS) Systems

    SBC: MOTIVO ENGINEERING, LLC            Topic: N132111

    Motivo Engineering will design an Uninterruptible Power Supply (UPS) using Zinc-Manganese Dioxide (Zn-MnO2) batteries for naval usage and commercial marine markets. This UPS will demonstrate a significant improvement over lead-acid battery UPS systems currently used by the Navy because its Zn-MnO2 batteries have higher capacity, equivalent cost, lower self-discharge rates, and extended lifetimes c ...

    SBIR Phase II 2017 Department of DefenseNavy
  9. A Sensor System for Precise, Automated Position-keeping for Ocean Going Vessels

    SBC: ADVANCED SCIENTIFIC CONCEPTS, LLC            Topic: N143129

    Existing Relative Reference Sensor Systems (R2S2) employed on SSBN blocking vessels impose a safety risk because they require sailors to go topside while underway to install / uninstall targets on the submarine deck. During the Phase I program, ASC acquired 3D Flash LIDAR images of sea going vessels and demonstrated that a vessel’s relative bearing can be derived from these images. The ASC 3D Fl ...

    SBIR Phase II 2017 Department of DefenseNavy
  10. Automated Application Distribution Deployment

    SBC: SOLUTE            Topic: N093196

    SOLUTE will mature the capability created during the last SBIR Phase II.5 to prepare it for successful transition into multiple PEO C4I Programs of Record. During the last Phase II.5 SBIR, SOLUTE modified the A2D2 prototype to be more scalable and transitioned it into an enterprise software capability that utilized trusted, scalable tools and infrastructure. SOLUTE worked with the GCCS-M Developme ...

    SBIR Phase II 2017 Department of DefenseNavy
US Flag An Official Website of the United States Government