You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
High average current and high voltage reliable and stable power supplies for high current electron beam sources
SBC: INNOSYS, INC. Topic: C5523cPhotoinjectors need very high voltage power supplies. There is a need for very high voltage power supplies that can be used for high voltage DC electron guns for accelerator applications. In particular, there are needs for developing a family of high average current and high voltage reliable and stable power supplies for electron beam sources and photoinjectors InnoSys proposes to perform fundamen ...
SBIR Phase I 2023 Department of Energy -
Innovative high-volume low-cost manufacturing of conventional neutron supermirror beam guides, mirrors and filters for future large projects
SBC: AMERICAN PHYSICS AND TECHNOLOGY LLC Topic: C5511aIn the next 5-10 years, the planned upgrades to the High Flux Isotope Reactor (HFIR) and the Spallation Neutron Source (SNS) nuclear scattering facilities at Oak Ridge National Laboratory (ORNL) will require kilometers of new neutron supermirror beam guides, mirrors, and filters. At the same time, an even larger amount of neutron optics will be required to build the new European Spallation Source ...
SBIR Phase I 2023 Department of Energy -
Advanced tire tread simulation through adaptive isogeometric analysis
SBC: Coreform LLC Topic: C5501bTire tread wear is the leading cause of pollution from cars - over 1000x larger than engine exhaust. Tires on electric cars wear out 20% faster on average because of increased torque and weight, so the impact of tire pollution will grow in significance as electric vehicles continue to grow in popularity. Simulation tools used for other aspects of tire and automotive design cannot accurately predic ...
SBIR Phase I 2023 Department of Energy -
C55-11C FPGA-Based High-Rate, High-Resolution Imaging Acquisition and Processing Solution
SBC: SEQUENT LOGIC LLC Topic: C5511cC55-11c-270712Detector integrated circuits in modern neutron imaging systems output copious amounts data at high throughput – data are output too fast to efficiently store or interpret using standard processing and data acquisition systems. As larger detector arrays are fabricated, corresponding data throughput and required storage depths become untenable. To address this issue, a real-time acqu ...
SBIR Phase I 2023 Department of Energy -
Context-aware Neural-accelerated Visualization Pipeline for Big Volumetric Data
SBC: Metascape L.L.C. Topic: C5505aThe emergence of multiteraflop machines with thousands of processors for scientific computing combined with advanced sensory-based experimentation has heralded an explosive growth of structured and unstructured data in science and engineering fields. Such scientific endeavors require powerful visualization workflows as a fundamental step to understanding and interpreting big data. An ideal data vi ...
SBIR Phase I 2023 Department of Energy -
Scalable High-density Superconducting Flex Cables and Circuits
SBC: NIELSON SCIENTIFIC LLC Topic: C5637cThere is a growing need for a commercially available high-density superconducting flex cable for a variety of ultra-sensitive, high pixel count instruments/focal plane arrays for the study of space as well as quantum computing and quantum information processing. However, traditional flex circuit manufacturing techniques and tools cannot achieve the high channel density necessary for these customer ...
STTR Phase I 2023 Department of Energy -
High-efficiency Continuous Electrolysis of Iron Ore for Carbon-Emission-Free Iron Production
SBC: STORAGENERGY TECHNOLOGIES INC Topic: C5619cIron (Fe) & steel production accounts for 7% of total industry CO2 emission. Currently, blast furnace-basic oxygen furnace (BF-BOF) route produces 71% of global crude steel production. However, this process uses carbon (usually coke) as the reductant, which binds with oxygen in Fe ore and generates CO2. Direction reduction of ore (DRI) routes reduces Fe ore to sponge Fe via a solid-state process u ...
STTR Phase I 2023 Department of Energy -
Advanced Real-Time Seismic Monitoring Platform
SBC: SEQUENT LOGIC LLC Topic: C5606aDistributed acoustic sensing (DAS) systems produce data at very high throughputs (~100 MB/s) that quickly accumulate to unmanageable data volumes (~10 TB/day). These data throughputs lead to difficulty in establishing a distributed seismic observatory integrating DAS nodes at the network edge because data cannot be transferred and interpreted in a real-time fashion. The problem can be addressed by ...
SBIR Phase I 2023 Department of Energy -
Isogeometric analysis for nuclear engineering
SBC: Coreform LLC Topic: C5640aC56-40a-273805The Office of Nuclear Energy has developed powerful computer modeling and simulation tools for nuclear reactor design and testing. Their flagship multiphysics platform is ideal for simulating both light-water and non-light water reactors, but it cannot run on the graphics processing units (GPUs) that are increasingly used in high performance computers. Also, non-light-water reactors ...
SBIR Phase I 2023 Department of Energy -
Water, Power and Environmental Data Acquisition Protocol
SBC: GRID MODERNIZATION SOLUTIONS LLC Topic: C5614aHydropower has the ability to play a critical role in curbing climate change because of the carbon free services it provides with its large storage capacities and fast ramping rates to complement the intermittency and uncertainty of other renewable energy resources. However, models used for energy system management and planning, largely, do not comprehensively include water avail ability or en ...
SBIR Phase I 2023 Department of Energy