You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Insole based Physiological Gait Monitoring for Injury Prevention and Personalized Training for Increased Performance
SBC: NANO COMPOSITE PRODUCTS, INC Topic: A224025Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Wearable Radiation Sensors
SBC: ENGENIUSMICRO LLC Topic: A234006Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Automated Data Use Labeling/Tagging (ADULT)
SBC: TRIDEUM CORPORATION Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Radio Frequency (RF)-based Artificial Intelligence to Detect, Exploit, and React (RAIDER)
SBC: Integrated Solutions for Systems, Inc. Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Artificial Intelligence (AI)/ Machine Learning (ML) Open Topic
SBC: IERUS TECHNOLOGIES INC Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
SB NUC for Polarimetric Systems
SBC: POLARIS SENSOR TECHNOLOGIES INC Topic: A22011Detection, Recognition, and Identification of targets with infrared cameras is often limited by Fixed Pattern Noise (FPN). This is especially true for polarimetric imagers that subtract images of orthogonal polarization to observe small differences that are typically less than 5%. FPN is mitigated with Non-uniformity Corrections (NUC) algorithms and procedures. NUC procedures can be grouped ...
SBIR Phase I 2023 Department of DefenseArmy -
Seat Track Integrated Replacable Upgradable Protection System (STIRUPS)
SBC: MACRO INDUSTRIES INC Topic: A224024Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Sustainable Geopolymer Concrete (GPC) using Indigenous and Waste Materials
SBC: HIFUNDA LLC Topic: A234P014Redacted.
SBIR Phase I 2023 Department of DefenseArmy -
Geometric Perturbations for MMW Radar Target Modeling
SBC: SIGNATURE SOLUTIONS INC Topic: A22008Radar target models are often developed from measured or predictive data sources that utilize a single instantiation of target geometry. However real-world perturbations in target features can result in variability of dominant scattering features that subsequently produce significant variation in high fidelity scattering centers as well as composite target radar signatures. This signature vari ...
SBIR Phase I 2023 Department of DefenseArmy -
Extremely High Frequency Transmitter for Radar Applications
SBC: INNOSYS, INC. Topic: A22007Vacuum electron devices (VEDs) are critical components for DoD systems that require high power, high frequency (wide bandwidth), and high efficiency. There continue to be needs to push the technology to higher frequency to again support high power, wide bandwidth requirements for power devices. Robust short and medium-range air surveillance is an essential capability for the security of critical a ...
SBIR Phase I 2023 Department of DefenseArmy