You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Acoustic Internal Automated Concrete Tie Tester

    SBC: NDT CORPORATION            Topic: 23FR1

    NDT Corp. will take the currently developed ACTT system, which can accurately assess the internal condition of concrete crossties and increase its speed.FRA 23-FR1 requests a system that at high speeds can assess both the internal and external condition of concrete crossties.Currently there are systems that can perform the external assessment at the required speeds.However, there is no system that ...

    SBIR Phase I 2023 Department of Transportation
  2. E-Textile Enabled Active Monitoring System (E-TEAMS)

    SBC: VIVONICS INC            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  3. Insole based Physiological Gait Monitoring for Injury Prevention and Personalized Training for Increased Performance

    SBC: NANO COMPOSITE PRODUCTS, INC            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  4. Electroneurography for Muscle Fatigue

    SBC: PISON TECHNOLOGY INC            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  5. An Easily Integratable Wearable Real-Time Cognition & Physiological Monitoring Device for Human Performance Optimization

    SBC: NEURABLE INC.            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  6. A Garment-Embedded Physiological Monitoring Solution for Defense and Commercial Applications

    SBC: HUMAN SYSTEMS INTEGRATION INC            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  7. Air-Cycle Cabin Cooling (AC3)

    SBC: PHYSICAL SCIENCES INC.            Topic: A234003

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  8. MACC Magnetocaloric Air Cabin Cooler

    SBC: WARBURGWEISS CORPORATION            Topic: A234003

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  9. Refrigerant-Free Cooling System

    SBC: TRITON SYSTEMS, INC.            Topic: A234003

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  10. TacDIVE- A Diver Health and Safety Monitoring and Alerting System

    SBC: HUMAN SYSTEMS INTEGRATION INC            Topic: A234004

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
US Flag An Official Website of the United States Government