You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
REMOTE PROCESSING OF LEAD STYPHNATE
SBC: El Dorado Engineering, Inc. Topic: N/AIDENTIFY CANDIDATE OPERATIONS IN LEAD STYPHNATE WASHING AND PROPORTIONING OPERATIONS TO WHICH ROBOTICS MAY BE APPLIED. OBJECTIVES INCLUDE REMOVAL OF PERSONNEL FROM HAZARDOUS LOCATIONS; IMPROVED SAFETY, AND DEVELOPMENT OF ROBOTICS SUITABLE FOR HAZARDOUS LOCATIONS. PROJECT WILL IDENTIFY AND RANK OPERATIONS; DEVELOP DESIGN CONCEPTS USING COMMERCIAL ROBOTS (OFF-THE-SHELF OR MODIFIED); EXAMINE SAFETY C ...
SBIR Phase I 1990 Department of DefenseArmy -
MARKETING AND ENGINEERING ANALYSIS OF SPVD APPLICATIONS
SBC: KVH INDUSTRIES, INC. Topic: N/AKVH INDUSTRIES PROPOSES TO THOROUGHLY INVESTIGATE BOTH CONVENTIONAL AND INNOVATIVE USES FOR THE SELF POWERED VEHICLE DETECTOR (SPVD) AND TO MODIFY THE EXISTING DESIGN, IF REQUIRED, TO MEET THE SPECIFICATIONS OF THE NEW APPLICATIONS. THE OVERALL GOAL OF THE PROPOSED SBIR PHASE IEFFORT CAN BE SUBDIVIDED INTO THREE FUNDAMENTAL OBJECTIVES: RESEARCH INTO THE VARIOUS APPLICATIONS OF SPVD TECHNOLOGY AND ...
SBIR Phase I 1990 Department of Transportation -
GPS COMPATIBLE AUTOMATIC CALIBRATION COMBAT VEHICLE DIGITAL COMPASS
SBC: KVH INDUSTRIES, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseArmy -
COMPUTERIZED READING DIAGNOSIS AND REMEDIATION
SBC: New Sage Topic: N/ANEW SAGE HAS UNDERTAKEN THE DEVELOPMENT OF A COMPUTERIZED ENVIRONMENT FOR TESTING AND REMEDIATING A VARIETY OF READINGDISABILITIES. IT IS CALLED DELVE. THE TEST IS BASED ON A MULTIDIMENSIONAL MODEL OF READING SKILL COMPONENTS. DELVE PRESENTS ITEMS TO TEST ALL READING SKILL AREAS, PRESENTS A VARIETY OF DIAGNOSTIC DATA, SUGGESTS APPROPRIATE REMEDIATION, AND THEN PROVIDES GAMES DESIGNED TO BEEF UP WE ...
SBIR Phase I 1990 Department of Education -
CATFACE STEREO HMD SYSTEM
SBC: Ralcon Dev Lab Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseArmy -
ULTRASOUND ASSISTED ASSAY FOR TOXINS IN BLOOD
SBC: Technical research Associates, Inc. Topic: N/ATHE LONG-TERM OBJECTIVE OF THIS PROJECT IS TO SUCCESSFULLY COMBINE ULTRASOUND TECHNOLOGY DEVELOPED AT TRA WITH ASSAY METHODS AND PECTROSCOPIC ANALYTICAL TECHNIQUES FOR DETECTING SPECIFIC TOXINS IN WHOLE BLOOD SAMPLES. THE RESEARCH IN PHASE I OF THIS PROPOSAL FOCUSES ON THE APPLICATION OF THIS METHODOLOGY TO THE ANALYSIS OF SAXITOXIN. THE KNOWN CHEMICAL ASSAY METHOD WILL BE MODIFIED FOR COATING IN ...
SBIR Phase I 1990 Department of DefenseArmy -
INVESTIGATION OF THE ADVANTAGES OF A MANIPULATIVE-BASED APPROACH TO THE TEACHING OF MATHEMATICS TO THE DEAF
SBC: Thomas A Garland Company Inc Topic: N/ATHE EDUCATION OF THE DEAF AND HEARING IMPAIRED IS LIMITED BYTHE EFFECTIVENESS OF COMMUNICATION BETWEEN TEACHER AND STUDENT. THE LEARNING PROCESS FOR THE DEAF TYPICALLY REQUIRES A HIGH LEVEL OF REPETITION AND RESTATEMENT TO ACCOMPLISH AND VERIFY MEANINGFUL COMMUNICATION. IN MOST SUBJECT AREAS, LANGUAGE AND COMMUNICATION LIMITATIONS CONTROL THE PACE AND EFFECTIVENESS OF EDUCATING THE DEAF. IN MATHEM ...
SBIR Phase I 1990 Department of Education