You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Improved Tele-Control for Manipulator Equipped Unmanned Ground Vehicles

    SBC: AUTONOMOUS SOLUTIONS INC            Topic: A09186

    Under the Phase I program, ASI will examine the available technologies for improving manipulation, create preliminary designs of how to integrate these technologies on current platforms (the Talon and Packbot), and simulate the effects of improved dynamic modeling and sensor feedback on manipulator performance. The deliverables for Phase I will thus be: • Preliminary design of retrofit packa ...

    SBIR Phase I 2010 Department of DefenseArmy
  2. Semi-Autonomous Manipulator Control Using 2D and 3D Scene Recognition

    SBC: AUTONOMOUS SOLUTIONS INC            Topic: A09187

    Current mobile manipulators require extensive operator involvement to perform even simple tasks, such as opening a door, picking up an object, or emptying a container. “Fly-the-gripper” algorithms have been implemented to free the user from specifying joint velocities when a desired x, y, z gripper path is desired (Berkemeier, Poulson, et al. 2008), (Johnston, et al. 2008). Further, â ...

    SBIR Phase I 2010 Department of DefenseArmy
  3. Compact Efficient Electrically Small Broadband Antennas

    SBC: MINERVA SYSTEMS & TECHNOLOGIES LLC            Topic: A10131

    The objective of this proposal is to design and develop compact, efficient, electrically small, broadband antennas that are capable of handling high voltages of greater than 100 kV, and fit into small geometrical spaces of less than 40 mm in diameter and 50 mm in length. Previously insurmountable challenges to achieving the stringent requirements of simultaneous compact size, wider bandwidths, an ...

    SBIR Phase I 2010 Department of DefenseArmy
  4. Flat Panel Shelter-Mountable Phased Array Antenna for DoD Systems of Record

    SBC: MINERVA SYSTEMS & TECHNOLOGIES LLC            Topic: A09176

    The objective of this proposal is to develop innovative concept designs for flat-panel, low-profile, smallest possible aperture, phased-array GBS receive antennas in the 10.5 – 13.5 GHz Ku-band and 20.2 – 21.2 GHz K/Ka-band. Furthermore, the objectives include that the antenna be realized within a 40” cross section. Conventional array antenna designs to meet the G/T requirement ...

    SBIR Phase I 2010 Department of DefenseArmy
  5. Modular Perfusion Bioreactor for Tissue Engineering

    SBC: RESODYN CORPORATION            Topic: OSD09H11

    This project will develop and demonstrate a prototype Modular Perfusion Bioreactor (MPB) for tissue engineering applications. While many unique styles of bioreactors have been proposed for various types of stem cell and tissue cultures, there is not a single, easy-to-use device that accommodates the multiple diverse needs of multiple tissue culture types.. In order to take advantage of recent ad ...

    SBIR Phase I 2010 Department of DefenseArmy
  6. Microfabricated Mass Spectrometer for Near Real-Time Toxic Chemical Detection

    SBC: TORION TECHNOLOGIES            Topic: A09144

    A need for miniaturized mass spectrometer (MS) instrumentation exists for both stationary point monitoring and applications where instrument size is critical, including military swatch test monitoring of chemical agent permeation rates and field detection of chemical agents. A 50% size and weight reduction over current portable MS instrumentation through modern microfabrication techniques while ma ...

    SBIR Phase I 2010 Department of DefenseArmy
  7. 50- 100 Watt Wind Energy Harvesting in Light Tactical Applications

    SBC: Pine Ridge Products LLC            Topic: A09092

    Pine Ridge Products LLC will introduce a tactical micro wind turbine that is highly efficient, robust, easy to use, maintain and transport. The Army is requesting a renewable energy system to reduce the amount of fuel used for small power loads. A vehicle mounted, efficient wind turbine system would improve self sufficiency on site by decreasing the need for fossil fuels. This will increase reliab ...

    SBIR Phase I 2010 Department of DefenseArmy
  8. IMPROVED MODELING OF LASER EXHAUST ATMOSPHERIC DIFFUSION

    SBC: El Dorado Engineering, Inc.            Topic: N/A

    STUDY INVESTIGATES THE ATMOSPHERIC DIFFUSION OF GASES WITH THE OBJECTIVE OF DEVELOPMENT OF A COMPUTER MODEL THAT PREDICTS THE DIFFUSION OF HYDROGEN FLUORIDE (HF) AND NITROGEN TRIFLUORIDE (NF3) LASER EXHAUST. THE COMPUTER MODEL WILL CONFIRM THE BEHAVIOR OF THESE GASES AND PREDICT ACTUAL CONDITIONS THAT ALLOW OR CURTAIL LASER TESTING. THE STUDY RESEARCHES THAT LATEST LITERATURE APPLICABLE TO ATMOSPH ...

    SBIR Phase I 1991 Department of DefenseArmy
  9. ADVANCED, DIRECT AIR SAMPLING GAS CHROMATOGRAPHY MODULE FOR ION MOBILITY SPECTROMETRY

    SBC: FEMTOSCAN CORP.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  10. LOW COST HIGH PERFORMANCE CONTINUOUS FIBER CERAMIC COMPOSITES: 3-D BRAIDED PREFORMS AS SIC MATRIX COMPOSITES USING CVI

    SBC: Quadrax Advanced Materials            Topic: N/A

    3-D BRAIDED PREFORMS SHOULD INCREASE MECHANICAL PROPERTIES OF CERAMIC COMPOSITES IN ALL DIRECTIONS; ITS INTERLOCKING FIBER ARCHITECTURE SHOULD BE EFFECTIVE IN ARRESTING CRACKS, AND REMOVING CATASTROPIC FAILURE. THIS PROJECT ADDRESSES THE ISUES OF MERGING AN EFFECTIVE REINFORCEMENT SYSTEM WITH AN INEXPENSIVE CERAMIC MATRIX PROCESSING TECHNOLOGY TO DISCOVER A LOW COST MANUFACTURING ROUTE TO HIGH PER ...

    SBIR Phase I 1991 Department of DefenseArmy
US Flag An Official Website of the United States Government