List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. Development of Low Temperature Ultracapacitor

    SBC: Yardney Technical Products, Inc.            Topic: A12aT010

    The objective of this Phase 1 effort is to develop an asymmetric supercapacitor (ASC) that provides>10 Wh/kg energy density and a high power density, and maintains this performance down to -55 degrees C. Yardney Technical Products (YTP), a recognized specialty high energy battery manufacturer in Pawcatuck, CT in collaboration with the Jet Propulsion Laboratory (JPL) proposes to design, develop and ...

    STTR Phase I 2012 Department of DefenseArmy
  2. Improved Mobile User Objective System (MUOS) Metaferrite Based Antenna for SATCOM

    SBC: Minerva Systems & Technologies, LLC            Topic: A12045

    The objective of this proposal is to design and develop UHF Satellite communications (SATCOM) circular polarized antennas using advanced metamaterials to achieve high gain performance with smaller dimensions (i.e., size and weight). The metamaterials we propose belong to a class of magneto-dielectric materials. The advantages and disadvantages of dielectric loading applied to electromagnetic devi ...

    SBIR Phase I 2012 Department of DefenseArmy
  3. Affordable Low-Profile Wideband SATCOM Antennas (LPWSA) for Airborne Platforms

    SBC: APPLIED RADAR, INC.            Topic: A11132

    The proposal will develop multiple design concepts, conduct a trade study, and identify the three (3) most promising concepts for affordable low-profile and wideband satellite communication antennas (LPWSA) with high data rate capability and minimum airstream protrusion for airborne platforms. Specifically, the study will investigate several modified hybrid low-profile antenna array concepts with ...

    SBIR Phase I 2012 Department of DefenseArmy
  4. Compact Efficient Electrically Small Broadband Antennas

    SBC: Minerva Systems & Technologies, LLC            Topic: A10131

    The objective of this proposal is to design and develop compact, efficient, electrically small, broadband antennas that are capable of handling high voltages of greater than 100 kV, and fit into small geometrical spaces of less than 40 mm in diameter and 50 mm in length. Previously insurmountable challenges to achieving the stringent requirements of simultaneous compact size, wider bandwidths, an ...

    SBIR Phase I 2010 Department of DefenseArmy
  5. Flat Panel Shelter-Mountable Phased Array Antenna for DoD Systems of Record

    SBC: Minerva Systems & Technologies, LLC            Topic: A09176

    The objective of this proposal is to develop innovative concept designs for flat-panel, low-profile, smallest possible aperture, phased-array GBS receive antennas in the 10.5 – 13.5 GHz Ku-band and 20.2 – 21.2 GHz K/Ka-band. Furthermore, the objectives include that the antenna be realized within a 40” cross section. Conventional array antenna designs to meet the G/T requirement ...

    SBIR Phase I 2010 Department of DefenseArmy
  6. Modular Perfusion Bioreactor for Tissue Engineering

    SBC: RESODYN CORPORATION            Topic: OSD09H11

    This project will develop and demonstrate a prototype Modular Perfusion Bioreactor (MPB) for tissue engineering applications. While many unique styles of bioreactors have been proposed for various types of stem cell and tissue cultures, there is not a single, easy-to-use device that accommodates the multiple diverse needs of multiple tissue culture types.. In order to take advantage of recent ad ...

    SBIR Phase I 2010 Department of DefenseArmy
  7. 50- 100 Watt Wind Energy Harvesting in Light Tactical Applications

    SBC: Pine Ridge Products LLC            Topic: A09092

    Pine Ridge Products LLC will introduce a tactical micro wind turbine that is highly efficient, robust, easy to use, maintain and transport. The Army is requesting a renewable energy system to reduce the amount of fuel used for small power loads. A vehicle mounted, efficient wind turbine system would improve self sufficiency on site by decreasing the need for fossil fuels. This will increase reliab ...

    SBIR Phase I 2010 Department of DefenseArmy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government