You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Educational Leadership Virtual Practicum System

    SBC: Pragmatic Solutions, Inc.            Topic: 91990022R0001

    Not available

    SBIR Phase I 2022 Department of EducationInstitute of Education Sciences
  2. Daily CICO: A User-friendly Tier II Behavior Intervention

    SBC: Liveschool Inc.            Topic: 91990020R0006

    Check-in Check-out (CICO) is a widely used behavioral intervention for elementary and middle schools centered on goals, feedback, and communication with parents about daily behavioral performance. This project will develop a prototype platform to streamline and automate the delivery of CICO. The prototype will include an app, a user-friendly interface, and a dashboard to track progress and capture ...

    SBIR Phase I 2020 Department of EducationInstitute of Education Sciences
  3. A Music Creation Engine to Improve Algebra Readiness

    SBC: Muzology, LLC            Topic: 91990020R0006

    In a previous National Science Foundation SBIR project, the developer created an online platform that uses songs to support mathematical learning. In the current project, the team will develop a prototype of a component of a platform to guide students in creating and producing their own music videos about algebra. The prototype will include a video production application, features to enhance learn ...

    SBIR Phase I 2020 Department of EducationInstitute of Education Sciences
  4. High-Temperature Sensors

    SBC: GLOYER-TAYLOR LABORATORIES INC            Topic: HR001119S003501

    In this effort, GTL proposes to develop sensors for a high-temperature instrumentation system for hypersonic vehicles and scramjet propulsion systems. These sensors will be based on GTL’s Structural Nervous System™ (SNS™) and CNTOR™ technologies. GTL and its partner NFA will leverage a suite of internally developed modeling tools including multi-physics codes, coupled thermo-acoustic codes ...

    SBIR Phase I 2020 Department of DefenseDefense Advanced Research Projects Agency
  5. ACE Multi-Role Vehicle

    SBC: GLOYER-TAYLOR LABORATORIES INC            Topic: SB173006

    Over the past decade, GTL has developed a suite of transformational technologies that provide superior performance for reduced cost.Each of these technologies have been matured to TRL 6 and establish the technical foundation for the Advanced Cryogenic Expendable (ACE) Multi-Role Vehicle (ACE-MRV). The ACE-MRV is a high-performance expendable rocket stage that can either be launched (from the groun ...

    SBIR Phase I 2018 Department of DefenseDefense Advanced Research Projects Agency
  6. Interactive Administrator Dashboard for Improving School-Wide Behavior Supports

    SBC: Liveschool Inc.            Topic: edIES15R0005

    In prior research and development, the project team developed LiveSchool, an online platform to track student behavior. With this Phase I funding, the team will develop and test a prototype of an administrator dashboard. The dashboard will generate reports on individual student behavior patterns across classes and on the prevalence of behavioral issues across different teachers. The dashboard will ...

    SBIR Phase I 2017 Department of EducationInstitute of Education Sciences
  7. Enhanced Composite Cryotank

    SBC: GLOYER-TAYLOR LABORATORIES INC            Topic: SB162014

    The objective of this effort is to develop the capability to produce low-cost high-performance, lightweight composite cryogenic propellant tanks for use on expendable and reusable space access vehicles and hypersonic aircraft. GTL took a major step towards this capability in a previous effort that demonstrated that it was possible to fabricate ultra-thin BHL composite propellant tanks (small-scal ...

    SBIR Phase I 2017 Department of DefenseDefense Advanced Research Projects Agency
  8. Real-Time Metrology and Feedback Control for Additive Manufacturing

    SBC: Bridger Photonics, Inc.            Topic: SB163004

    SBIR Topic SB163-004 describes DARPAs need to develop a real-time system for active feedback control and process characterization of multi-material additive manufacturing. To fill this need, Bridger Photonics, Inc. (Bridger) will prove out an ...

    SBIR Phase I 2017 Department of DefenseDefense Advanced Research Projects Agency
  9. Quasi-Phase Matched Waveguides for Quantum Frequency Conversion

    SBC: ADVR, INC.            Topic: SB133001

    This Phase I SBIR effort will examine the feasibility of fabricating quantum frequency conversion (QFC) devices with cutting edge performance to satisfy DARPA quantum information science applications. Quasi-phase matching (QPM) in potassium titanyl phosphate (KTP) and lithium niobate (LN) waveguides designed for very low loss will be used to create frequency convertors at arbitrary source and tar ...

    SBIR Phase I 2014 Department of DefenseDefense Advanced Research Projects Agency
  10. PROBABILISTIC EXTENSIONS TO MODEL BASED PROGRAMMING LANGUAGES

    SBC: METAMORPH INC            Topic: SB142003

    This project will demonstrate the feasibility of extending the probabilistic design verification capabilities of the OpenMETA tool suite with probabilistic programming methods. These extensions will enable correct-by-construction design methodologies in the presence of component, system, environment, and epistemic uncertainties.The OpenMETA model- and component-based design tool suite for the manu ...

    SBIR Phase I 2014 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government