You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Intelligent Automation of Trace Identification Processes for Complex Mission Critical Robotics Systems

    SBC: SAFA.AI, INC            Topic: T10

    Achieving trustworthy and trusted autonomy starts early in the development process through performing hazard analysis, fault analysis, identifying mitigating requirements, and carefully and rigorously tracing those requirements all the way into design, models, implementation, and tests. However, traceability can be time-consuming, costly, and error-prone. To address these challenges, significant a ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  2. High-Repetition-Rate Pump Sources Tailored for High-Purity Entanglement Generation

    SBC: ADVR, INC.            Topic: T8

    This Phase I SBIR will lead to the development of a bandwidth tailored pump source for high purity photon pair generation. Spontaneous parametric down conversion can be used to generate high purity photon pairs at wavelengths of interest to NASA and the broader scientific community. However, these sources are highly dependent on pulsed pump laser parameters. Traditional pulsed laser sources are la ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  3. A Radiation Hard Neural Processor With Embedded MRAM

    SBC: GREEN MOUNTAIN SEMICONDUCTOR, INC.            Topic: H6

    Green Mountain Semiconductor Inc. is proposing a design and method for evaluation pursuant to the solicitation H6.22-1123. The hardware proposal is a radiation hard neural processor with embedded MRAM in an FD-SOI process; however, much of the innovation is put into the evaluation of error tolerance and design solutions to statistical radiation effects. Most fault tolerant design solutions imply a ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  4. Lunar Truss Design and Construction

    SBC: Bond Technologies, Inc.            Topic: Z14

    This project will advance technology for the automated assembly of large truss towers.nbsp; Assembly of truss-based structures is one of the leading candidates for establishing some of the early lunar infrastructure.nbsp; Specifically, joining technologies and robotic tools are required to enable autonomous/automated assembly of tall towers as well as shelters, domes and habitats.nbsp; Automated a ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  5. Real-Time Hardware Configurable Coprocessors

    SBC: RESILIENT COMPUTING, LLC            Topic: Z2

    This project proposes a coprocessor companion to future radiation-hardened processors that can boost performance using commercial Field Programmable Gate Arrays (FPGA). nbsp;This project will investigate the feasibility of using dynamically reconfigurable coprocessing circuitry within a proven fault-tolerant architecture known as RadPC.nbsp; The RadPC architecture has been matured through NASA-fun ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  6. Materials Modeling Hub: Interoperable and Collaborative Multi-Scale Modeling Ecosystem for Data Analysis, Visualization, and Management

    SBC: MATERIALS DATA MANAGEMENT INC            Topic: S17

    Materials Modeling Hub (MMH) software integrates modeling, product design, manufacturing, and usage cycle into a digital ecosystem to accelerate, simplify, and strengthen ideation through implementation. When combined with a viable materials information management strategy, modeling techniques can replicate and predict experimental outcomes and material performance with growing accuracy. In indust ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  7. Visible light phase and amplitude modulators for quantum sensors and clocks

    SBC: ADVR, INC.            Topic: S16

    This Phase I SBIR will lead to the development of key photonic components for use in high performance quantum sensors and clocks. AdvR proposes to develop very high performance phase and amplitude modulators for use at visible and ultra-violet wavelengths. The proposed innovation utilizes high performance, damage resistant optical waveguides with high speed traveling wave electrodes to provide int ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  8. Power Management for Energy Resiliency

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: A224015

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  9. Understanding and optimizing roll-to-roll manufacturing of high-strength, transparent polymer composite films

    SBC: TESSELLATED INC            Topic: A21CT025

    Our team has produced composite thin films with the highest reported tensile strengths.  These films have been produced using roll-to-roll manufacturing techniques that can be adapted to current manufacturing lines. Small amounts of thermally reduced graphene oxide (tr-GO) particles (1% by wt) can be added to a ultra high molecular weight polyethylene matrix to produce thin films with tensile str ...

    STTR Phase I 2022 Department of DefenseArmy
  10. Lightweight and Low Cost Pyrotechnic Gas Generator for HIAD

    SBC: Storm Castle Technical Products Inc            Topic: Z7

    Entry, descent, and landing systems with capability beyond current state-of-the-art are required for a number of missions. These missions represent an immediate need for return of orbital payloads, and include larger milestone objectives up to a manned flight to Mars which requires landing a payload many times beyond that achieved to date. In this Phase I SBIR, Storm Castle Technical Products inte ...

    SBIR Phase I 2022 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government