You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Intelligent Automation of Trace Identification Processes for Complex Mission Critical Robotics Systems

    SBC: SAFA.AI, INC            Topic: T10

    Achieving trustworthy and trusted autonomy starts early in the development process through performing hazard analysis, fault analysis, identifying mitigating requirements, and carefully and rigorously tracing those requirements all the way into design, models, implementation, and tests. However, traceability can be time-consuming, costly, and error-prone. To address these challenges, significant a ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  2. High-Repetition-Rate Pump Sources Tailored for High-Purity Entanglement Generation

    SBC: ADVR, INC.            Topic: T8

    This Phase I SBIR will lead to the development of a bandwidth tailored pump source for high purity photon pair generation. Spontaneous parametric down conversion can be used to generate high purity photon pairs at wavelengths of interest to NASA and the broader scientific community. However, these sources are highly dependent on pulsed pump laser parameters. Traditional pulsed laser sources are la ...

    STTR Phase I 2023 National Aeronautics and Space Administration
  3. Lunar Truss Design and Construction

    SBC: Bond Technologies, Inc.            Topic: Z14

    This project will advance technology for the automated assembly of large truss towers.nbsp; Assembly of truss-based structures is one of the leading candidates for establishing some of the early lunar infrastructure.nbsp; Specifically, joining technologies and robotic tools are required to enable autonomous/automated assembly of tall towers as well as shelters, domes and habitats.nbsp; Automated a ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  4. Low SWaP-C, Flight-Capable Distributed Fiber-Optic Sensing Platform

    SBC: SEQUENT LOGIC LLC            Topic: A2

    The firm proposes to perform studies related to size, weight, power, cost reduction, and ruggedizationnbsp;of a flight-capable, multi-parameter distributed fiber-optic sensing interrogator for testing advanced flight vehicles including those pertaining to NASArsquo;s Integrated Aviation Systems Program (IASP) Flight Demonstrations and Capabilities (FDC) project. The technology will aid understandi ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  5. Real-Time Hardware Configurable Coprocessors

    SBC: RESILIENT COMPUTING, LLC            Topic: Z2

    This project proposes a coprocessor companion to future radiation-hardened processors that can boost performance using commercial Field Programmable Gate Arrays (FPGA). nbsp;This project will investigate the feasibility of using dynamically reconfigurable coprocessing circuitry within a proven fault-tolerant architecture known as RadPC.nbsp; The RadPC architecture has been matured through NASA-fun ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  6. Materials Modeling Hub: Interoperable and Collaborative Multi-Scale Modeling Ecosystem for Data Analysis, Visualization, and Management

    SBC: MATERIALS DATA MANAGEMENT INC            Topic: S17

    Materials Modeling Hub (MMH) software integrates modeling, product design, manufacturing, and usage cycle into a digital ecosystem to accelerate, simplify, and strengthen ideation through implementation. When combined with a viable materials information management strategy, modeling techniques can replicate and predict experimental outcomes and material performance with growing accuracy. In indust ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  7. Visible light phase and amplitude modulators for quantum sensors and clocks

    SBC: ADVR, INC.            Topic: S16

    This Phase I SBIR will lead to the development of key photonic components for use in high performance quantum sensors and clocks. AdvR proposes to develop very high performance phase and amplitude modulators for use at visible and ultra-violet wavelengths. The proposed innovation utilizes high performance, damage resistant optical waveguides with high speed traveling wave electrodes to provide int ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  8. Infini-D Summits: An Online Platform for Immersive Full-Class Literacy Simulations

    SBC: INFINID LEARNING INC            Topic: 91990023R0011

    Not available

    SBIR Phase I 2023 Department of EducationInstitute of Education Sciences
  9. Nondestructive Instrumentation for Real-Time On-Demand Battery State Monitoring

    SBC: STORAGENERGY TECHNOLOGIES INC            Topic: S13

    Battery health monitoring is particularly crucial for space applications since battery shutoff or complete drain can be catastrophic. The battery management system (BMS) is vital to avoid such instances. Conventional on-board BMS are currently limited to the monitoring of extrinsic parameters including voltage, current, and temperature. From these, batteryrsquo;s state of charge (SoC) and state of ...

    SBIR Phase I 2022 National Aeronautics and Space Administration
  10. Lightweight and Low Cost Pyrotechnic Gas Generator for HIAD

    SBC: Storm Castle Technical Products Inc            Topic: Z7

    Entry, descent, and landing systems with capability beyond current state-of-the-art are required for a number of missions. These missions represent an immediate need for return of orbital payloads, and include larger milestone objectives up to a manned flight to Mars which requires landing a payload many times beyond that achieved to date. In this Phase I SBIR, Storm Castle Technical Products inte ...

    SBIR Phase I 2022 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government