You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Strengthening Supply Chain Resilience Through Automated Data Labeling and Predictive Analytics
SBC: R4 TECHNOLOGIES, INC. Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
r4 Dynamic Tours: Predictive Perimeter Defense to Enhance Threat Detection and Prevention
SBC: R4 TECHNOLOGIES, INC. Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
The Coin of the Realm: Understanding and Predicting Relative System Behavior
SBC: MORE COWBELL UNLIMITED, INC Topic: A234007Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Production of Lithium Salts for Li ion Batteries Using Thermal and Cyclonic Brine Concentration Espiku LLC
SBC: ESPIKU LLC Topic: A224016Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
EdscapeXR
SBC: MNDTRST Inc. Topic: 91990023R0016Not available
SBIR Phase II 2023 Department of EducationInstitute of Education Sciences -
Solid-State Cooling System Utilizing Ionic Liquid Heat Transfer
SBC: CONNECTICUT ANALYTICAL CORPORATION Topic: A234003Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Compact Efficient Rotary Diesel X-Engine 5 kW Generator Set
SBC: LIQUIDPISTON, INC Topic: A20048LiquidPiston Inc. (LPI) was awarded a Phase I Army SBIR to assess the feasibility of developing an extremely lightweight and compact 5 kW generator set based on LPI’s novel rotary “XTS” X-Engine platform. The objective of the program was to demonstrate a pathway toward reducing AMMPS generator size and weight by 80%. Over the course of the six-month period of performance spanning from ...
SBIR Phase II 2022 Department of DefenseArmy -
STAR At Home app
SBC: STAR AUTISM SUPPORT, INC. Topic: 91990022R0001Not available
SBIR Phase I 2022 Department of EducationInstitute of Education Sciences -
EdScape XR
SBC: MNDTRST Inc. Topic: 91990022R0001Not available
SBIR Phase I 2022 Department of EducationInstitute of Education Sciences -
Spray Dried Powder Compositions for Dual-use Secondary High Explosive and Rocket Propellants
SBC: DIVISION BY ZERO DEVELOPMENT LABS LLC Topic: A21CT001The U.S. Army has a future need for multiple secondary high explosive compositions that can also be used interchangeably as rocket propellants. In this proposal we will discuss a method of preparing such compositions via advanced spray drying technology and involving the use of a highly insensitive spray dried nitramine or CL-20 composition which have been plasticized with an energetic polymer t ...
STTR Phase I 2022 Department of DefenseArmy