You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Large-scale Additive Manufacturing R&D to Advance Modular Shelter Design and Deployment
SBC: Compotech, Inc. Topic: A22013Shelter system technologies provide vital support to U.S. military personnel during in-theatre operations and peace-time continuity. Soldiers, logistics experts, and decision makers across the chain of command require shelter systems that perform in austere environments while also being cost-effective, resilient, durable, and easily maintained. For land-based conflicts in more remote locations and ...
SBIR Phase I 2023 Department of DefenseArmy -
Extended Durability Fuel Cells
SBC: FC RENEW, LLC Topic: A224016Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
DETECT-ML: Detection of Energetic Topology Errors via Computed Tomography & Machine Learning
SBC: Compotech, Inc. Topic: A224013Compotech, Inc. seeks to build on our award winning FRAG-CT munition characterization method by developing a new complementary software and hardware package to provide rapid, real-time defect detection at the heart of a munition’s explosive core. The detection technique leverages proven AI/ML detection software algorithms and high speed CT scanning equipment.
SBIR Phase I 2023 Department of DefenseArmy -
Rapid Deployment Hybrid MicroGrid a Plug & Play Transportable Solar PV System-of-Systems
SBC: Resilient Energy & Infrastructure, LLC Topic: A224016Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
3D Printed Composite Bio-Walls for Sustainable Construction
SBC: BRANCH TECHNOLOGY, INC. Topic: A234P014Redacted.
SBIR Phase I 2023 Department of DefenseArmy -
Educational Leadership Virtual Practicum System
SBC: Pragmatic Solutions, Inc. Topic: 91990022R0001Not available
SBIR Phase I 2022 Department of EducationInstitute of Education Sciences -
Spray Dried Powder Compositions for Dual-use Secondary High Explosive and Rocket Propellants
SBC: DIVISION BY ZERO DEVELOPMENT LABS LLC Topic: A21CT001The U.S. Army has a future need for multiple secondary high explosive compositions that can also be used interchangeably as rocket propellants. In this proposal we will discuss a method of preparing such compositions via advanced spray drying technology and involving the use of a highly insensitive spray dried nitramine or CL-20 composition which have been plasticized with an energetic polymer t ...
STTR Phase I 2022 Department of DefenseArmy -
Extended Durability Fuel Cells
SBC: FC RENEW, LLC Topic: A224016Redacted
SBIR Phase I 2022 Department of DefenseArmy -
Rapid Deployment Hybrid MicroGrid a Plug & Play Transportable Solar PV System-of-Systems
SBC: Resilient Energy & Infrastructure, LLC Topic: A224016Redacted
SBIR Phase I 2022 Department of DefenseArmy -
Clean onsite energy from organic, biomass, and plastic waste, to reduce greenhouse gas emissions and deliver renewable energy, improved resiliency, and cost savings to the U.S. Army.
SBC: ENEXOR ENERGY, LLC Topic: A224016Abstract The Enexor BioEnergy xTechSBIR Phase II project will demonstrate how the Enexor Bio-CHP, a modular, grid-independent, distributed renewable energy technology, will enable Army facilities to redirect organic and plastic waste from ending in landfills to generating onsite, 24/7 reliable, and affordable renewable power and thermal energy to meet the Army Climate Strategy’s (ACS) End State ...
SBIR Phase II 2022 Department of DefenseArmy