You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. User-directed analysis and verification of modified binaries

    SBC: GALOIS, INC.            Topic: N152120

    In the Phase I and II efforts on Galois' Attack Sensitive Brittle Software (Brittle) SBIR project, we implemented Software Fault Enhancement (SFE), a binary modification technique for improving the robustness of existing binary code, without requiring access to source code or other documentation.  This work is promising enough that the toolset is now being commercialized.  On this sequential Pha ...

    STTR Phase II 2023 Department of DefenseDefense Advanced Research Projects Agency
  2. The Coin of the Realm: Understanding and Predicting Relative System Behavior

    SBC: MORE COWBELL UNLIMITED, INC            Topic: A234007

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  3. BARC: Binary Analysis and Recompilation for CHERI

    SBC: GALOIS, INC.            Topic: AF203CSO1

    The objective of this study will be to develop technologies for recompiling legacy binaries to the secure CHERI ISA in support of DoD modernization priorities. Doing this would enable upgrading DoD systems processors and software by ruling out several important categories of security vulnerability that are possible on legacy architectures. However, recompilation is inherently a very difficult task ...

    SBIR Phase II 2023 Department of DefenseDefense Advanced Research Projects Agency
  4. CAMDEN Phase II

    SBC: GALOIS, INC.            Topic: HR001121S000730

    The vision of the CAMDEN project has been to explore the use of mechanism design as a solution to effectively incentivize and accelerate collaboration in critical DoD domains. Our Phase II goal is to “make it real” by building one or more deployable mechanism design solutions, demonstrating in a very tangible way how mechanism design can benefit the DoD. In the 8-month Phase 1 effort, we aimed ...

    SBIR Phase II 2023 Department of DefenseDefense Advanced Research Projects Agency
  5. QUantified Information flow for Intelligent Partitioning (QUIIP)

    SBC: GALOIS, INC.            Topic: A17006

    Due to exponential growth in complexity, current hardware designs cannot be thoroughly tested, which leads to significant hardware vulnerabilities reaching the field. Recent innovations in Model-Based Engineering (MBE) provide information flow analysis results that can be used to drive design state space partitioning – separating the design into multiple, individually verifiable portions – bas ...

    SBIR Phase II 2023 Department of DefenseDefense Advanced Research Projects Agency
  6. Generating Requirements Evidence with Analysis and System-level Enforcement (GREASE)

    SBC: GALOIS, INC.            Topic: HR001121S000708

    The Generating Requirements Evidence with Analysis and System-level Enforcement (GREASE) project will develop a static binary verifier that generates evidence that COTS software components satisfy their requirements. The GREASE tool will accelerate both (1) the safe and high-assurance integration of COTS components into systems, and (2) the generation of assurance cases for the certification of sy ...

    SBIR Phase II 2023 Department of DefenseDefense Advanced Research Projects Agency
  7. Production of Lithium Salts for Li ion Batteries Using Thermal and Cyclonic Brine Concentration Espiku LLC

    SBC: ESPIKU LLC            Topic: A224016

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  8. STAR At Home app

    SBC: STAR AUTISM SUPPORT, INC.            Topic: 91990022R0001

    Not available

    SBIR Phase I 2022 Department of EducationInstitute of Education Sciences
  9. Spray Dried Powder Compositions for Dual-use Secondary High Explosive and Rocket Propellants

    SBC: DIVISION BY ZERO DEVELOPMENT LABS LLC            Topic: A21CT001

    The U.S. Army has a future need for multiple secondary high explosive compositions that can also be used interchangeably as rocket propellants. In this proposal we will discuss a method of preparing such compositions via advanced spray drying technology and involving the use of a highly insensitive spray dried nitramine or CL-20 composition which have been plasticized with an energetic polymer t ...

    STTR Phase I 2022 Department of DefenseArmy
  10. Production of Lithium Salts for Li ion Batteries Using Thermal and Cyclonic Brine Concentration Espiku LLC

    SBC: ESPIKU LLC            Topic: A224016

    Redacted

    SBIR Phase I 2022 Department of DefenseArmy
US Flag An Official Website of the United States Government