You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Advanced Technology Speech Recognition System

    SBC: Amdyne Corp            Topic: N/A

    This effort will integrate an advanced technology speech recognition system (SRS) with a computer-assisted contingency planning training model. The SRS makes use of algorithms developed in the Speech Technology and Research Labratory of SRI International. Its state-of-the-art approach provides significant improvements in accuracy and robustness over other approaches. It provides for speaker ind ...

    SBIR Phase I 1996 Department of DefenseArmy
  2. Real-Time Monitoring System for Trace Chemical Vapors During Open Burning/Open Detonation (OB/OD)

    SBC: APPLIED ORDNANCE TECHNOLOGY            Topic: N/A

    Continuing efforts to develop useful and safe means of treating unserviceable, damaged or unused munitions and ordnance include the use of Open Burning/Open Detonation (OB?OD) technique. Although OB/OD techniques provide many advantages over other demil/disposal processes, increasing regulatory scrutiny is forcing OB/O facilities to limit or eliminate operations. In addition, data collection req ...

    SBIR Phase I 1996 Department of DefenseArmy
  3. COMMERCIAL SPACE LAUNCH FREQUENCY REQUIRMENTS

    SBC: Berner, Lanphier & Assoc Inc.            Topic: N/A

    CURRENTLY COMMERCIAL SPACE-LAUNCH FREQUENCY REQUIREMENTS ARE MET IN THE 2200- TO 2300-MHZ BAND. NEW FREQUENCY ALLOCATIONS MAY LIMIT FREQUENCIES FOR COMMERCIAL SAFE AND RELIABLE COMMERCIAL SPACE-LAUNCH OPERATIONS TO THREE CHANNELS IN THE 2360- TO 2390-MHZ BAND. THIS RESEARCH WILL ASSESS WHETHER THIS ALLOCATION IS SUFFICIENT TO ENSURE CONTINUED SAFE AND RELIABLE COMMERCIAL SPACE-LAUNCH OPERATIONS. D ...

    SBIR Phase II 1996 Department of Transportation
  4. An Invariant Landmark Object Recognition Method based on Adaptive Receptive Field Model of Primate's VisualCortex

    SBC: COMPUSENSOR TECHNOLOGY CORP.            Topic: N/A

    There is a clear need for an effective method of invariant landmark recognition and place determination in the development of autonomous guidance of robotics vehicle. Due to the change of perspective of objects viewed from moving vehicle, invariance is a critical requirement in landmark recognition. Neurobiological research in 80s has found that the receptive fields in primate's visual cortex co ...

    SBIR Phase I 1996 Department of DefenseArmy
  5. MEMS Fluidis Vortex Valves for Gas Turbine Fuel Control Systems

    SBC: DEFENSE RESEARCH TECHNOLOGIES, INC.            Topic: N/A

    We proposed to develop enabling technology for the digital control engine fuel (turbine, diesel, etc.) by using a large array of very fast acting, micro-miniature (MEMS technology), fluid, tab-actuated, vortex valves. Such valving technology would, for the first time permit active control/modulation and digital waveform synthesis of engine liquid fuel flow, with specific application to the active ...

    SBIR Phase I 1996 Department of DefenseArmy
  6. Digital Waveform-based System for AE Measurement for NDT

    SBC: Dvp, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  7. Interaction Between Computer Models of Face and Mask

    SBC: General Engineering and Systems Analysis Co Inc (GESAC)            Topic: N/A

    Fit and comfort are so important to ensure a proper operation of a mask and so any new mask design has to be tested on a large number of volunteers. As the Army strives to become more representative of the American population in its gender and racial content, it is also possible that some part of the Army population may not be afforded adequate protection with masks of one standard size of any d ...

    SBIR Phase I 1996 Department of DefenseArmy
  8. Development of Real Time Ray Tracing Software

    SBC: Geometric Solutions, Inc.            Topic: N/A

    To create a fast, high power, computational tool that provides high resolution, complex scene geometry input necessary to drive a wide variety of sensor simulations. Installed on powerful computers and applied to a highly detailed battlefield imagery as viewed through a multitude of sensors. The ray trace (RT) approach will calculate and provide input information to imbedded sensor models that w ...

    SBIR Phase I 1996 Department of DefenseArmy
  9. An American Sign Language/English Dictionary on CD/ROM

    SBC: Institute For Disabilities Research & Training Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Education
  10. Speech-Recognition Telecommunications for Hearing Impaired People

    SBC: Institute For Disabilities Research & Training Inc            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Education
US Flag An Official Website of the United States Government