You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Machine Vision Based Multisensor Inspection for Microelectronics

    SBC: Acuity Imaging Inc            Topic: N/A

    This proposal describes the implementation of improved processes for inspection of micro-electronic assemblies based upon integration and fusion of data from different sensor modalities. Initially the project will be targeted on developing a system that combines data from a CCD camera operating with visible light, a micro focus X-rays imaging system, and a laser based pointrange sensor. Although ...

    SBIR Phase II 1996 Department of DefenseArmy
  2. Disability data management for state and local planning.

    SBC: Integrated Research And            Topic: N/A

    Disability is the nation's largest public health issue; with over 35 million Americans experiencing disability and annual disability-related costs exceeding $170 billion. Planning for the efficient and equitable allocations of state and local rehabilitation services has generally been inadequate, however. Geographic information systems (GIS) approaches have the potential to dramatically improve ...

    SBIR Phase I 1996 Department of Education
  3. Compact Thermal Energy Recovery System for Intercooled Gas Turbine Incorporated

    SBC: CREARE LLC            Topic: N/A

    Our objective is to develop an innovative thermal management system for recovering waste heat from engines. The proposed system will tap the large quantities of waste hat from the intercooler of gas turbine engines and use a Rankine cycle to increase the power of core gas turbine, or to drive an electric generator to power auxiliary systems. The innovative aspect of this thermal management syste ...

    SBIR Phase II 1996 Department of DefenseArmy
US Flag An Official Website of the United States Government