You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. BeaverFit

    SBC: BEAVERFIT NORTH AMERICA LLC            Topic: A234005

    Proposed Approach: BeaverFit seeks to satisfy the requirements of this proposal and subsequent SBIR phases through four main technical objectives (TO). Metrics of success will be applied to each TO to validate the effectiveness of the project and track progress toward accomplishment of the desired end state. Key measures of performance identified within the TO include cost, timelines, and throughp ...

    SBIR Phase I 2023 Department of DefenseArmy
  2. Enhanced Ride Performance- M997A3 Chassis

    SBC: ROD HALL LICENSED PRODUCTS, LLC            Topic: A224005

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  3. Spray Dried Powder Compositions for Dual-use Secondary High Explosive and Rocket Propellants

    SBC: DIVISION BY ZERO DEVELOPMENT LABS LLC            Topic: A21CT001

    The U.S. Army has a future need for multiple secondary high explosive compositions that can also be used interchangeably as rocket propellants. In this proposal we will discuss a method of preparing such compositions via advanced spray drying technology and involving the use of a highly insensitive spray dried nitramine or CL-20 composition which have been plasticized with an energetic polymer t ...

    STTR Phase I 2022 Department of DefenseArmy
  4. Enhanced Ride Performance- M997A3 Chassis

    SBC: ROD HALL LICENSED PRODUCTS, LLC            Topic: A224005

    Redacted

    SBIR Phase I 2022 Department of DefenseArmy
  5. Resonant Acoustic Continuous Crystallizer for Safe and Tunable Recrystallization of Nitramines

    SBC: RESODYN CORPORATION            Topic: A20101

    Resodyn has developed the novel Resonant Acoustic Continuous Crystallizer (RACC) concept which is specifically configured for the recrystallization of energetic nitramines. This technology employs the Resonant Acoustic Mixing technology, which results in a uniform shear field throughout the mixing vessel. Radial mixing is accomplished to such a significant degree that true plug flow is achieved. C ...

    SBIR Phase I 2021 Department of DefenseArmy
  6. Robust, compact, high brightness entangled photon-pair source for space applications based on periodically poled nonlinear waveguides

    SBC: ADVR, INC.            Topic: A20085

    The overall goal of this SBIR program is to develop waveguide-based, robust, high-rate, entangled photon pair sources suitable for use in space. These waveguides, fabricated at AdvR utilize periodic poling for efficient quasi-phase matched (QPM) spontaneous parametric downconversion (SPDC) of high energy pump photons into two lower energy signal and idler photons. AdvR’s approach is enabled by a ...

    SBIR Phase I 2020 Department of DefenseArmy
  7. Non-Pyrotechnic Battlefield Effects Replication Using eSquibs

    SBC: Digital Solid State Propulsion, Inc            Topic: A18091

    Using electric solid propellant, DSSP has developed a non-pyrotechnic small arms fire simulator that will be optimized, enlarged and enhanced for Army live fire training applications. First, the new proprietary waterproof non-pyrotechnic propellant will be further characterized for long term use and function in eSquibs and similar devices. The eSquib muzzle flash effect will be enhanced as new var ...

    SBIR Phase II 2019 Department of DefenseArmy
  8. Tightly Coupled Oscillator and GPS Receiver

    SBC: Jackson Labs Technologies, Inc.            Topic: A17051

    Legacy GPS receivers do not make use of the disciplined atomic oscillator flywheel output in GPS Disciplined Oscillator systems. The attached proposal shows how the disciplined oscillator signal can be used to improve GPS carrier and code tracking, mitigate multipath, jamming and spoofing, and to detect GPS receiver and satellite system anomalies. Using the disciplined oscillator as the frequency ...

    SBIR Phase I 2018 Department of DefenseArmy
  9. Tightly Coupled Oscillator and GPS Receiver

    SBC: Jackson Labs Technologies, Inc.            Topic: A17051

    GPS Disciplined Oscillator (GPSDO) systems traditionally combine the 1PPS output from a GPS receiver and highly stable clock like a Chip Scale Atomic Clock (CSAC) to steer the local clock frequency to match the frequency and phase of the GPS-generated 1PPS. However, the GPS receiver does not take advantage of the stable Chip Scale Atomic Clock for improved GPS receiver resilience, improved positio ...

    SBIR Phase II 2018 Department of DefenseArmy
  10. Waterproofing Cargo Airdrop Equipment

    SBC: RESODYN CORPORATION            Topic: A16114

    The U.S. Army is interested in the development of innovative coating technologies to allow current U.S. Army airdrop related hardware and equipment to survive fresh and salt water operations with increased reliability and without damage and significant maintenance impact. Resodyn Corporation proposes for development a durable, moisture-impermeable, thermoplastic coating material to address the U.S ...

    SBIR Phase II 2018 Department of DefenseArmy
US Flag An Official Website of the United States Government