You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. The Social Shape Up System

    SBC: TEACHING RESEARCH INSTITUTE L.L.C.            Topic: N/A

    Purpose: In prior research, prosocial behaviors in grade school have been correlated with later academic achievement while anti-social behaviors have been associated with later poor academic achievement and deviance. To help teachers monitor students' social behavior, this project will develop a classroom conduct system that includes a mechanism for teachers to monitor social behavior. Project Ac ...

    SBIR Phase II 2011 Department of Education
  2. MenuChoice:Nutrition Program for Community-based Group Homes for Persons with Intellectual or Developmental Disabilities

    SBC: GOOD NUTRITION IDEAS, LLC            Topic: 84133S1

    This project develops a nutrition program, MenuChoice©, for community-based group homes for persons with intellectual or developmental disabilities (IDD). Adults with IDD experience poorer nutritional health and more nutrition-related secondary conditions than adults without disabilities. These conditions are preventable and modifiable through a safe, healthful diet, but multiple challenges precl ...

    SBIR Phase I 2011 Department of Education
  3. Haptic Feedback Improvements for Prostheses

    SBC: ORTHOCARE INNOVATIONS LLC            Topic: 84133S2

    This project optimizes haptic system design parameters and more thoroughly evaluates the impact of a vibratory haptic system for prosthetics. Objectives include: (1) building a hardware and software test bed for non-invasive voluntary control of a prosthetic hand with vibratory haptic feedback, (2) optimizing the tactor application, (3) assessing the effectiveness of tactor vibratory feedback on c ...

    SBIR Phase II 2011 Department of Education
  4. The Social Shape Up System

    SBC: TEACHING RESEARCH INSTITUTE L.L.C.            Topic: N/A

    Through the Social Shape Up System teachers will use a handheld device to manage their classroom by monitoring and track classroom behaviors in pre-K to eighth grade classrooms. The product will include the curriculum consisting of eight research-based strategies for shaping behavior, a web-based, database-driven system to store, manage, and report student behavior, and the mobile/handheld device ...

    SBIR Phase I 2010 Department of Education
  5. Anautics CourseBook Project

    SBC: Anautics, Inc.            Topic: N/A

    The Anautics CourseBook Project will address three national critical issues in mathematics education the need to support standards based instruction, the need to raise student achievement scores through effective teaching, the need for instruction management through electronic curriculum guidance, assessment and collaboration.

    SBIR Phase I 2008 Department of Education
  6. Tools and Materials for Hands-On Climate and Weather Science Education

    SBC: ANASPHERE, INC            Topic: N/A

    The majority of students and educators would probably agree that students are better able to grasp scientific concepts from the use of hands-on activities and other inquiry-based educational practices than from typical lecture problem solving methods. Anasphere, Inc is working to make inquiry based tools and materials for weather and climate education more readily available for students and educat ...

    SBIR Phase I 2008 Department of Education
  7. Curriculum solutions for instruction in middle mathmatics (CSI-M2)

    SBC: Anautics, Inc.            Topic: N/A

    The goal of the Curriculum Solutions for Instruction in Middle Mathematics (CSI-M2) Project is to improve mathematics understanding and performance of students in the middle grades by developing and providing Education Data Management System (EDMS) software. The software will generate an individual education plan for each student based on a large test item database constructed by using objectives ...

    SBIR Phase I 2004 Department of Education
  8. Web-Based Adult Learning Interactive Multimedia (ALIM)

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    N/A

    SBIR Phase I 2001 Department of Education
  9. Tools for Presentation of Visual Transitions of Audio Inputs from Music

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    N/A

    SBIR Phase I 2001 Department of Education
  10. Interactive Multimedia Math Instruction for Elementary School Children with Hearing Impairments

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    Not Available Structural responses to gust and buffet load excitation encompass a wide range of frequency spectrum. Any load alleviation system must be able to function well beyond this range to provide necessary damping to suppress vibrations. The proposed load alleviation system has the following unique qualities: 1. It uses aerodynamic damping property to suppress the structural responses, 2. ...

    SBIR Phase I 1999 Department of Education
US Flag An Official Website of the United States Government