You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Diamondlike Atomic-Scale Composite Protective Coatings for Plasma and Microwave Devices

    SBC: ADVANCED REFRACTORY TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseAir Force
  2. EXPERT COMMUNICATION AND INFORMATION ACCESS NETWORK (ECIAN)

    SBC: ANALYSIS & SIMULATION, INC.            Topic: N/A

    VARIOUS ACTIVITIES (EDUCATION, GOVERNMENT, RESEARCH) GENERATE LARGE AMOUNTS OF RAW DATA. HOWEVER, DATA IS COLLECTED IN A DISJOINTED AND ISOLATED FASHION (I.E., ACTS, LITERATURE) CREATING BARRIERS IN DATA ACCESS AND DISSEMINATION. THERE IS A CONSENSUS AMONG FAMILIES AND PROFESSIONALS, THAT NEEDS OF INDIVIDUALS WITH DISABILITIES AND SERVICES PROVIDED TO THESE INDIVIDUALS COULD BE GREATLY IMPROVED IF ...

    SBIR Phase I 1993 Department of Education
  3. PROGRAMMABLE EMITTER SIGNATURE GENERATION

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    A KEY AREA OF LABORATORY TEST CAPABILITIES THAT NEEDS IMPROVEMENT IS THE SIMULATION OF REALWORLD CORRUPTION ON RADAR SIGNALS, AND THE IMPERFECTIONS IN PULSE GENERATON GENERIC TO ALL RADAR SYSTEMS. TWO PRIMARY REQUIREMENTS ARE THE SIMULATION OF MULTIPATH PHENOMENA AND UNINTENTIONAL INTRAPULSE MODULATIONS (UMOP). BOTH REQUIRE THE ABILITY TO GENERATE PRECISE AMPLITUDE, PHASE AND FREQUENCY MODULATION ...

    SBIR Phase II 1993 Department of DefenseAir Force
  4. FLASER Simulation Environment Development

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    The Flaser system engineering program scheduled for commencement in FY93, integrates a forward looking IR (FLIR) sensor and laser radar (ladar) for improved airborne targeting. The proposed effort supports the integration of passive IR and closed-loop active IR scene generation capabilities with the Khoros software environment. This marriage supports pending software development activities by prov ...

    SBIR Phase I 1993 Department of DefenseAir Force
  5. Reconfiguratble, Realtime RWR (R3WR) Simulator

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseAir Force
  6. Development of a low Energy X-Ray Detector to Replace Bag-X

    SBC: Applied Physics Technologies            Topic: N/A

    The USAF Armstrong Laboratory is interested in improving the detection sensitivity of a CaF2 (EU) based detector system (BAG-X) for performing field measurements of low energy (17 keV and 60 keV) x-rays. The detection sensitivity of a system can be enhanced by improving its energy resolution, increasing its area efficiency and/or improving the signal processing electronics. Since the late 1970's, ...

    SBIR Phase I 1993 Department of DefenseAir Force
  7. Formal Verification of VHDL Models

    SBC: ATC-NY INC            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseAir Force
  8. NON-EQUILIBRIUM PLASMA CHEMICAL PROCESS FOR CONTROL OF NOx, VOC's AND AIR TOXICS

    SBC: BELTRAN, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseAir Force
  9. FOREBODY FLOW CONTROLS FOR CHINED FOREBODY CONFIGURATIONS

    SBC: BIHRLE APPLIED RESEARCH INC            Topic: N/A

    THE EXTERNAL CONFIGURATION OF ADVANCED, LOW-OBSERVABLE AIRCRAFT HAVE EVOLVED TO INCLUDE CHINED FOREBODIES. AT THE SAME TIME, AGILITY REQUIREMENTS HAVE BEEN ADDED TO MANEUVER WELL INTO THE HIGH-ANGLE-OF- ATTACK REGION WHERE CONVENTIONAL CONTROLS ARE LIMITED. IT IS PROPOSED TO EXAMINE THE CAPABILITY OF FOREBODY VORTEX CONTROL DEVICES, SUCH AS ASYMMETRICALLY DEPLOYED STRAKES AND BLOWING (OR SUCTION) ...

    SBIR Phase II 1993 Department of DefenseAir Force
  10. Preliminary Design of a Test Rig for the Wright Laboratory's Vertical Wind Tunnel

    SBC: BIHRLE APPLIED RESEARCH INC            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseAir Force
US Flag An Official Website of the United States Government