Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. Development of a Scalable, Low-cost, Ultrananocrystalline Diamond Electrochemical Process for the Destruction of Contaminants of Emerging Concern (CECs)

    SBC: Advanced Diamond TechNologies, Inc.            Topic: E

    This Small Business Innovation Research (SBIR) Phase II project will employ the large scale; highly reliable boron-doped ultrananocrystalline diamond (BD-UNCD®) electrodes developed during Phase I project to build and test Electrochemical Anodic Oxidation process (EAOP) cells and systems that can destroy Contaminants of Emerging Concern more economically and effectively than competing AOPs. BD-UN ...

    SBIR Phase II 2012 Environmental Protection Agency
  2. A Novel Acoustic Biodiesel Producton Process From Animal Fats and Waste Grease

    SBC: RESODYN CORPORATION            Topic: N/A

    The goal of this Phase I research project is to demonstrate the feasibility of an innovative Acoustic Biodiesel Synthesis Reactor (ABSR) with a biodiesel production cost of less than $0.30 per gallon over the cost of feedstock. The target feedstocks are brown, yellow, tallow, restaurant recycled, and trapped grease with high free fatty acid (FFA). The final target biodiesel costs will total $1.0 ...

    SBIR Phase I 2004 Environmental Protection Agency
  3. A Novel Acoustic Biodiesel Production Process from Animal Fats and Waste Grease

    SBC: RESODYN CORPORATION            Topic: C3NCERB3

    The goal of this Phase I research project is to demonstrate the feasibility of an innovative Acoustic Biodiesel Synthesis Reactor (ABSR) with a biodiesel production cost of less than $0.30 per gallon over the cost of feedstock. The target feedstocks are brown, yellow, tallow, restaurant recycled, and trapped grease with high free fatty acid (FFA). The final target biodiesel costs will ...

    SBIR Phase I 2004 Environmental Protection Agency
  4. A Down-Hole Probe for Real-Time Ore Grade Assessment in "Look Ahead" Mining

    SBC: Resonon, Inc.            Topic: 25

    73147-The removal, sorting, disposal, and treatment of waste rock in mining operations are expensive processes, wasteful of energy, hazardous, and environmentally damaging. The best possible remedy is to avoid creating the waste rock in the first place. This could be accomplished with existing mining techniques if ¿look-ahead¿ ore grading were used to evaluate unmined rock in real time. T ...

    SBIR Phase II 2004 Department of Energy
  5. N/A

    SBC: Purity Systems, Inc.            Topic: N/A

    Not Available This research will result in an expert system that can be used by KSC engineers to facilitate insight responsibilities associated with current and future NASA-KSC projects. System performance data will be analyzed and interpreted using appropriate statist

    SBIR Phase I 2000 Environmental Protection Agency
  6. N/A

    SBC: RESODYN CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of Energy
  7. N/A

    SBC: RESODYN CORPORATION            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of Energy
  8. EXTRACTION OF COPPER AND ZINC FROM MIXED-METAL CYANIDE SOLUTION USING SOLID PHASE EXTRACTION

    SBC: Chromatochem Inc.            Topic: N/A

    REMOVAL OF TOXIC METALS FROM WASTEWATER STREAMS HAS BECOME A PROBLEM OF INCREASING NATIONAL IMPORTANCE, AS A RESULT OF INCREASING CONCERN FOR OUR ENVIRONMENT, AND INCREASINGLY STRINGENT WASTE DISPOSAL REGULATIONS. CHROMATOCHEM, INC., HAS DEVELOPED AN ECONOMICAL AND EFFECTIVE NEW TECHNOLOGY FOR THE REMOVAL OF LOW LEVELS OF TOXIC METAL IONS FROM WASTEWATER STREAMS, USING SOLID PHASE EXTRACTION (SPE) ...

    SBIR Phase I 1993 Environmental Protection Agency
  9. A TESTING PROCESS TO DEFINE ELECTRODE CURRENT WEAR MECHANISMS AND DEVELOP IMPROVED ELECTRODES

    SBC: RESODYN CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of Energy
US Flag An Official Website of the United States Government