You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DEVELOPMENT OF A MINIATURIZED ELECTRONIC COMPASS FOR USE IN PROVIDING DIRECTIONAL GUIDANCE TO VISUALLY IMPAIRED INDIVIDUALS
SBC: Arctos Research Topic: N/ADESIGN AND FABRICATION OF SOLID-STATE DIRECTION-INDICATING APPARATUS, WITH TILT-IMMUNITY, THAT PROVIDES AN AUDIBLE OR TACTILE INTERFACE WITH THE USER. REDUCED SIZE TO ALLOW ENCAPSULATION IN A TYPICAL WALKING CANE. A DEVICE WILL BE DESIGNED THAT WILL PROVIDE A VISUALLY IMPAIRED PERSON WITH AN INDICATION OF HORIZONTAL DIRECTION, WITH RESPECT TO THE EARTH'S MAGNETIC FIELD. THE DEVICE WILLALSO SIGNAL ...
SBIR Phase I 1990 Department of Education -
MATERIALS TO ASSIST IN RECRUITMENT AND PREPARATION OF STENOCAPTIONERS
SBC: Captionamerica Topic: N/AN/A
SBIR Phase I 1990 Department of Education -
SCALEABLE PROCESS FOR CHEMICAL VAPOR DEPOSITION OF LARGE AREA HETEROEPITAXIAL BETA-SIC ON TIC USING GASES WITH 1:1 SI:C STOICHIO
SBC: DIAMOND MATERIALS INC Topic: N/AA PROCESS IS BEING DEVELOPED TO GROW HETEROEPITAXIAL BETA-SILICON CARBIDE, A.K.A 3C-SIC, ON TITANIUM CARBIDE SINGLE CRYSTALS USING NOVELSOURCE GASES. TWO GASES ARE BEING TESTED IN THIS INVESTIGATION THAT CONTAIN SILICON AND CARBON IN A 1:1 RATIO. A CHEMICAL VAPOR DEPOSITION (CVD) PROCESS IS BEING DEVELOPED TO GROW SINGLE CRYSTAL 3CIC USING EACH GAS. A BASELINE CVD REACTOR AND PROCESS IS BEING ESTA ...
SBIR Phase II 1990 Department of DefenseMissile Defense Agency -
AN EYEGAZE/HEADPOINTING COMMUNICATION/ENVIRONMENTAL CONTROL DEVICE FOR PERSONS WITH MENTAL RETARDATION
SBC: Kostraba Engineering Topic: N/AN/A
SBIR Phase I 1990 Department of Education -
SORPTION RESERVOIRS FOR THERMIONIC CONVERTERS
SBC: THERMACORE, INC. Topic: N/ATHERMIONIC ENERGY CONVERTERS, AS THEY NOW EXIST, ARE THREE-TEMPERATURE DEVICES: INPUT (EMITTER), OUTPUT (COLLECTOR) AND CESIUM RESERVOIR. THE RESERVOIR REQUIRES PRECISE CONTROL AT A TEMPERATURE ON THE ORDER OF 600K. A SEPARATE RESERVOIR IS REQUIRED FOR EACH CONVERTER OR THERMIONIC FUEL ELEMENT. THE COMPLEXITY ARISING FROM THE RESERVOIR CONTROL PROBLEM IS SUFFICIENT TO DISQUALIFY THERMIONIC SYSTEMS ...
SBIR Phase II 1990 Department of DefenseMissile Defense Agency -
LOW-MASS INTRINSICALLY-HARD HIGH TEMPERATURE RADIATOR
SBC: THERMACORE, INC. Topic: N/ASTRATEGIC DEFENSE REQUIREMENTS FOR HIGH-TEMPERATURE WASTE HEAT REJECTION INCLUDE A NEED FOR HARDENED, LIGHTWEIGHT RADIATOR EQUIPMENT TO OPERATE NEAR 875 DEGREES KELVIN. CURRENT DESIGNS UNDER CONSIDERATION PLANS TO USE MATERIALS SUCH AS ITIANIUM COMPOSITE AS THE HEAT PIPE RADIATOR WALL MATERIAL. THIS MATERIAL IS POTENTIALLY DIFFICULT TO FABRICATE IN A THIN-WALLED VACUUM-TIGHT VESSEL. IT IS ALSO REL ...
SBIR Phase II 1990 Department of DefenseMissile Defense Agency -
SIXTY KILOWATT ELECTRON TUBE COOLER
SBC: THERMACORE, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency