You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Project SCALE: Sustainable Coaching and Adaptive Learning for Education

    SBC: Reading Ways, Inc            Topic: 91990022R0001

    Not available

    SBIR Phase I 2022 Department of EducationInstitute of Education Sciences
  2. MenuChoice:Nutrition Program for Community-based Group Homes for Persons with Intellectual or Developmental Disabilities

    SBC: GOOD NUTRITION IDEAS, LLC            Topic: 84133S1

    This project develops a nutrition program, MenuChoice©, for community-based group homes for persons with intellectual or developmental disabilities (IDD). Adults with IDD experience poorer nutritional health and more nutrition-related secondary conditions than adults without disabilities. These conditions are preventable and modifiable through a safe, healthful diet, but multiple challenges precl ...

    SBIR Phase I 2011 Department of Education
  3. Tools and Materials for Hands-On Climate and Weather Science Education

    SBC: ANASPHERE, INC            Topic: N/A

    The majority of students and educators would probably agree that students are better able to grasp scientific concepts from the use of hands-on activities and other inquiry-based educational practices than from typical lecture problem solving methods. Anasphere, Inc is working to make inquiry based tools and materials for weather and climate education more readily available for students and educat ...

    SBIR Phase I 2008 Department of Education
  4. Disability Access

    SBC: SPIRIT LAKE CONSULTING, INC.            Topic: N/A

    Expansion of a combined software and on-site training program for people with disabilities and their families who lack usual prerequisites fpr success in computer-based learning; expansion to result in empirically validated commercial product

    SBIR Phase II 2005 Department of Education
  5. Low Cost, High Resolution, Pressue Mapping System for the Prevention of Pressure Ulcers

    SBC: EM PHOTONICS INC            Topic: N/A

    Pressure ulcers are a serious medical problem with annual treatment costs over $1 billion dollars. While the exact etiology involves a complex combination of factors, it is generally accepted that prolonged pressure to soft tissues results in discrete areas of acute ischemia. If the pressure is not relieved and the blood supply restored in a critical length of time, endothelial cell damage will re ...

    SBIR Phase I 2004 Department of Education
  6. Low Cost, High Resolution, Pressue Mapping System for the Prevention of Pressure Ulcers

    SBC: EM PHOTONICS INC            Topic: N/A

    Pressure ulcers are a serious medical problem with annual treatment costs over $1 billion dollars. While the exact etiology involves a complex combination of factors, it is generally accepted that prolonged pressure to soft tissues results in discrete areas of acute ischemia. If the pressure is not relieved and the blood supply restored in a critical length of time, endothelial cell damage will re ...

    SBIR Phase II 2004 Department of Education
  7. Disability Access

    SBC: SPIRIT LAKE CONSULTING, INC.            Topic: N/A

    The project combined software and an on-site training program for persons with disabilities and their families who lack the usual prerequisites for success in computer-based instruction created in Phase I into an empirically validated commercial product. The technical objectives of the project are: (1) the development of a unique virtual school house model to meet the identified needs of individ ...

    SBIR Phase I 2004 Department of Education
  8. A Low-cost, High-resolution Pressure Mapping System for Prevention of Pressure Ulcers

    SBC: EM PHOTONICS INC            Topic: N/A

    N/A

    SBIR Phase I 2003 Department of Education
  9. Captioning Tools for Visual Access to Computer-Based Media

    SBC: Cap-media, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Education
  10. Disability data management for state and local planning.

    SBC: Integrated Research And            Topic: N/A

    Disability is the nation's largest public health issue; with over 35 million Americans experiencing disability and annual disability-related costs exceeding $170 billion. Planning for the efficient and equitable allocations of state and local rehabilitation services has generally been inadequate, however. Geographic information systems (GIS) approaches have the potential to dramatically improve ...

    SBIR Phase I 1996 Department of Education
US Flag An Official Website of the United States Government