You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A REAL-TIME 3-D CLOUD SIMULATION SYSTEM DEVELOPMENT
SBC: Aeromet, Inc. Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseAir Force -
A PREDICTION MODEL FOR ADVANCED LEADING-EDGE VORTEX FLOW CONTROL
SBC: TARGAZYME, INC. Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseAir Force -
FOR HIGH ENERGY LASER FLOWS
SBC: Amtec Engineering Inc Topic: N/AAN EFFICIENT COMPUTATIONAL METHOD IS PROPOSED FOR MODELING THE COMPLEX PHYSICAL PHENOMENA OCCURING IN HIGH ENERGY CONTINUOUS WAVE LASER FLOW FIELDS. THESE FLOWS TYPICALLY CONTAIN BOUNDARY LAYERS, MIXING LAYERS, WAKES, AND EMBEDDED SHOCK WAVES. IT IS DIFFICULT TO GENERATE A MESH APRIOR WHICH WILL RESOLVE ALL FEATURES OF THE FLOW. THEREFORE, AN ADAPTIVE GRID TECHNIQUE WILL BE USED AND COUPLED TO AN ...
SBIR Phase I 1986 Department of DefenseAir Force -
HIGH EFFICIENCY MULTIJUNCTION PHOTOVOLTAIC SYSTEM
SBC: Failure Analysis Associates Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseMissile Defense Agency -
FATIGUE LIFE ENHANCEMENT OF BUSHED TITANIUM LUGS WILL BE INVESTIGATED.
SBC: Fatigue Technology Inc Topic: N/AFATIGUE LIFE ENHANCEMENT OF BUSHED TITANIUM LUGS WILL BE INVESTIGATED. A UNIQUE TECHNBIQUE, FORCEMATE (FM), FOR INSTALLATION OF BUSHINGS WILL BE DEMONSTRATED. EFFECT OF PROCESS PARAMETERS WILL BE EVALUATED AND THOSE PARAMETERS OPTIMIZED FOR THE PARTICULAR CONFIGURATION UNDER INVESTIGATION. AT EACH PHASE OF THE INVESTIGATION, FATIGUE LIFE COMPARISONS WILL BE MADE BETWEEN LUGS AND BUSHINGS INSTALLED ...
SBIR Phase I 1986 Department of DefenseNavy -
INTERNAL INSPECTION OF LONG TUBES
SBC: Flow Research Inc Topic: N/ATHE DEVELOPMENT OF A REMOTE LONG TUBE INSPECTION SYSTEM IS PROPOSED. THE OBJECTIVES OF THIS RESEARCH AND DEVELOPMENT EFFORT ARE TO EVALUATE VARIOUS CONCEPTS CAPABLE OF INSPECTING THE TUBE SURFACE AND REMOVING FOREIGN OBJECTS AND TO SELECT THE MOST PROMISING TECHNIQUES FOR DEVELOPMENT INTO A REMOTE INSPECTION SYSTEM. THE OBJECTIVE OF PHASE I IS TO DEVELOP A CONCEPTUAL SYSTEM DESIGN. THIS PHASE WILL ...
SBIR Phase II 1986 Department of DefenseAir Force -
HYDROFOIL PROFILING INSTRUMENT PLATFORM DEVELOPMENT
SBC: Flow Research Inc Topic: N/ATHE DEVELOPMENT OF A HYDROFOIL PROFILING INSTRUMENT PLATFORM FOR MEASURING PHYSICAL, THERMODYNAMIC, GEOCHEMICAL, AND BIOLOGICAL PARAMETERS THROUGHOUT THE WATER COLUMN IS PROPOSED. THE PLATFORM WOULD EMPLOY A LOW-POWER, CONTROLLED HYDRODYNAMIC LIFT DEVICE TO "FLY" THE INSTRUMENT PACKAGE UP AND DOWN THE WATER COLUMN ALONG A TAUT CABLE. BECAUSE LOCAL CURRENTS WILL DRIVE THE PLATFORM, POWER REQUIREMEN ...
SBIR Phase II 1986 Department of DefenseNavy -
THE PROPOSED WORK WILL EVALUATE THE FEASIBILITY OF HAFNIUM CARBIDE FIBERPRODUCTION THROUGH PYROLYSIS OF ORGANOHAFNIUM POLYMER PRECURSORS.
SBC: Flow Research Inc Topic: N/ATHE PROPOSED WORK WILL EVALUATE THE FEASIBILITY OF HAFNIUM CARBIDE FIBERPRODUCTION THROUGH PYROLYSIS OF ORGANOHAFNIUM POLYMER PRECURSORS. IN THIS CHEMICAL APPROACH TO CERAMIC PROCESSING, THE METHODS TO SYNTHESIZE ORGANOMETALLIC CHEMICALS SUITABLE FOR THE FORMATION OF ORGANOHAFNIUM POLYMERS AND TO FORM POLYMERIC FIBERS WITH AN (-HF-CHF-) BACKBONE WILL BE EXPLORED. THE POLYMERS WILL THEN BY PYROLYZE ...
SBIR Phase I 1986 Department of DefenseNavy -
THERMAL PULSE LOADING
SBC: Flow Research Inc Topic: N/ACOMPOSITE STRUCTURES IN SPACE MAY BE SUBJECT TO SOURCE OF THERMAL ENERGY, WHICH INCLUDES X-RAYS FROM NUCLEAR WEAPONS AND HIGH ENERGY LASER LIGHT. THIS PROPOSAL ADDRESSES THE NEED FOR ANALYSIS TOOLS TO PREDICT THE EFFECTS OF RAPID THERMAL PULSE LOADING ON AEROSPACE COMPOSITE MATERIALS. A MAJOR OBJECTIVE OF THIS PHASE I STUDY IS TO DETERMINE THE FEASIBILITY AND MAGNITUDE OF EFFORT TO DEIVER SUCH AN ...
SBIR Phase I 1986 Department of DefenseAir Force -
THE DEVELOPMENT OF AN AUTOMATED CUP INSPECTION MODULE IS PROPOSED.
SBC: Flow Research Inc Topic: N/ATHE DEVELOPMENT OF AN AUTOMATED CUP INSPECTION MODULE IS PROPOSED. THE OBJECTIVES OF THE PHASE I EFFORT ARE TO ESTABLISHED THE PARAMETERS WHICH MUST BE MEASURED AND THEIR REQUIRED RESOLUTION. THE PARAMETERS INCLUDE HARDNESS, OUTSIDE AND INSIDE DIAMETERS, BASE THICKNESS, TOTAL LENGTH, AND WALL THICKNESS. IN PHASE I, THE MEASUREMENT CONCEPTS WILL BE MOCKED-UP AND DYNAMICALLY TESTED TO VERIFY THEIR G ...
SBIR Phase I 1986 Department of DefenseArmy