You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Transpalatal EEG for Human Performance Monitoring and Optimization

    SBC: MANTEL TECHNOLOGIES, INC.            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  2. Non Refrigerant Based System for Cabin Cooling

    SBC: MANTEL TECHNOLOGIES, INC.            Topic: A234003

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  3. FIRST Responder: Female Injury Mixed-Reality Simulation Training

    SBC: Exonicus, Inc.            Topic: A234009

    The primary purpose of this work is to develop a comprehensive technical plan and prototype (phase one) to integrate multiple technologies via open standards (MOHSES/JETS) to create a comprehensive female manikin simulation platform (phase two) with validated cases, physiology, and interventions that leverage state-of-the-art technologies (AR, VR, traditional manikins, and part-task trainers). Th ...

    SBIR Phase I 2023 Department of DefenseArmy
  4. "ZERO Plastic" shipping containers for fabricating new parts from waste plastics

    SBC: ZERO PLASTIC LLC            Topic: A234P014

    Redacted.

    SBIR Phase I 2023 Department of DefenseArmy
  5. On-demand, high performance structures made with modular elements and robotic assembly

    SBC: Metavoxel Technologies            Topic: A234P014

    Redacted.

    SBIR Phase I 2023 Department of DefenseArmy
  6. Position, Navigation and Timing (PNT) Without the Global Positioning System (GPS)

    SBC: Namatad Inc            Topic: A19CT003

    Deployed military personnel are required to navigate, assess, and mitigate threats within complex, unknown structures located in hostile environments where access to satellite-transmitted GPS-based positioning signals may be limited, unavailable, or intentionally denied. The lack of accurate, real-time location data impacts mission-level situational awareness, particularly for operations that requ ...

    STTR Phase II 2023 Department of DefenseArmy
  7. Conformable infinite Composite Pressure Vessel (CiCPV) for Hydrogen Storage

    SBC: INFINITE COMPOSITES, INC            Topic: A234011

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
  8. High Power Coherent Beam Combined Laser Array

    SBC: EOSPACE INC.            Topic: A20088

    High-Energy Laser (HEL) systems are widely used in material processing and are increasingly important for next-generation weaponry. Current HEL technologies including fiber lasers, solid-state lasers, and spectral-beam-combined diode lasers are limited by excessive size, weight, and power consumption (SWaP) or by low beam quality. A promising alternative approach is to coherently combine beams fro ...

    SBIR Phase II 2022 Department of DefenseArmy
  9. Spray Dried Powder Compositions for Dual-use Secondary High Explosive and Rocket Propellants

    SBC: DIVISION BY ZERO DEVELOPMENT LABS LLC            Topic: A21CT001

    The U.S. Army has a future need for multiple secondary high explosive compositions that can also be used interchangeably as rocket propellants. In this proposal we will discuss a method of preparing such compositions via advanced spray drying technology and involving the use of a highly insensitive spray dried nitramine or CL-20 composition which have been plasticized with an energetic polymer t ...

    STTR Phase I 2022 Department of DefenseArmy
  10. High gain NIR-to-visible direct conversion vertical light-emitting phototransistor

    SBC: GHOST DISPLAY TECHNOLOGIES, LLC            Topic: A21CT015

    None

    STTR Phase I 2022 Department of DefenseArmy
US Flag An Official Website of the United States Government