You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Transpalatal EEG for Human Performance Monitoring and Optimization

    SBC: MANTEL TECHNOLOGIES, INC.            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  2. Non Refrigerant Based System for Cabin Cooling

    SBC: MANTEL TECHNOLOGIES, INC.            Topic: A234003

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  3. FIRST Responder: Female Injury Mixed-Reality Simulation Training

    SBC: Exonicus, Inc.            Topic: A234009

    The primary purpose of this work is to develop a comprehensive technical plan and prototype (phase one) to integrate multiple technologies via open standards (MOHSES/JETS) to create a comprehensive female manikin simulation platform (phase two) with validated cases, physiology, and interventions that leverage state-of-the-art technologies (AR, VR, traditional manikins, and part-task trainers). Th ...

    SBIR Phase I 2023 Department of DefenseArmy
  4. Reduced Integrated Optical Circuits (IOC) Half-wave Voltage (Vpi) for improved Size Weight and Power (SWaP) in Interferometric Fiber-Optic Gyroscopes

    SBC: EOSPACE INC.            Topic: N231075

    The objective is to develop an advanced IFOG-IOC (Interferometric Fiber-optic Gyroscope-Integrated Optical Circuit) for strategic-grade inertial sensors. The effort focus on an innovative Y-branch dual phase lithium niobate (LN) modulator IOC with a significantly reduced half-wave voltage (Vpi) and compact size with negligible impact on other IFOG performance criteria including flat frequency resp ...

    SBIR Phase I 2023 Department of DefenseNavy
  5. Fast Low Loss Uninterrupted Optical Switch

    SBC: EOSPACE INC.            Topic: N212106

    Develop and package a 2 x 2 single mode optical switch operating at 1.55 µm wavelength capable of switching speeds below 1 µs with a directivity of 50 dB and an excess loss of less than 1.0 dB with a continuous intensity change from port-to-port for routing RF/analog signals via singlemode fibers to different locations within the NAVY airframe. The optical switches must be low SWaP and capable o ...

    SBIR Phase II 2023 Department of DefenseNavy
  6. Widely Applicable Optical Circuit for Bidirectional Optical Sensing

    SBC: EOSPACE INC.            Topic: N212135

    EOSPACE proposes to develop a widely applicable supporting optical circuit in micro-optics that will provide bidirectional optical monitoring using dual photodetectors. The final circuit will be capable of surviving shock, vibration, and thermal excursions typical of aircraft or missile flight.

    SBIR Phase II 2023 Department of DefenseNavy
  7. "ZERO Plastic" shipping containers for fabricating new parts from waste plastics

    SBC: ZERO PLASTIC LLC            Topic: A234P014

    Redacted.

    SBIR Phase I 2023 Department of DefenseArmy
  8. On-demand, high performance structures made with modular elements and robotic assembly

    SBC: Metavoxel Technologies            Topic: A234P014

    Redacted.

    SBIR Phase I 2023 Department of DefenseArmy
  9. Magnetically Coupled Blade Pitch Control for Vertical Lift Applications

    SBC: SPECIFIC IMPULSES INCORPORATED            Topic: N231017

    Specific Impulses Incorporated has developed a novel method for enabling individual blade pitch control for rotorcraft.  Two reduced scale prototypes have been constructed and have successfully demonstrating the core concept.  The goal for this Phase I effort is to improve the existing prototypes and analytical models in support of the preliminary design of a larger scale technology demonstra ...

    SBIR Phase I 2023 Department of DefenseNavy
  10. Conformable infinite Composite Pressure Vessel (CiCPV) for Hydrogen Storage

    SBC: INFINITE COMPOSITES, INC            Topic: A234011

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
US Flag An Official Website of the United States Government