You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A DEVICE ENABLING CHILDREN WHO HAVE LOST THE USE OF A HAND TO PLAY MUSICAL WIND INSTRUMENTS.
SBC: Amend Music Center Topic: N/AUSING AN ALTO SAXOPHONE WE WILL DESIGN A BRACKET AND A FRAME SYSTEM UPON WHICH WILL BE MOUNTED A SERIES OF ELECTRO-MECHANICAL SOLENOIDS. THE SOLENOIDS WILL BE MOUNTED OVER THE KEYS ON HALF OF THE SAXOPHONE IN ORDER TO BE ABLE TO OPERATE THE KEYS INDIVIDUALLY OR IN GROUPS. THE SOLENOIDS WILL BE CONNECTED TO AND ACTIVATED BY A MECHANISM SIMILAR TO A JOYSTICK FROM A VIDEO GAME. ONLY SIX OF THE TERMIN ...
SBIR Phase I 1993 Department of Education -
Single Rotor Turbine Expander
SBC: Coleman Engine Corp Topic: N/AN/A
SBIR Phase I 1993 Department of DefenseArmy -
INTEGRATED GIS AND STATISTICAL DATA ANALYSIS SYSTEM
SBC: INSIGHTFUL CORPORATION Topic: N/AN/A
SBIR Phase II 1993 Department of DefenseArmy -
Heat Stable Alkaline Phosphatase from Thermophiles
SBC: J.k. Research Topic: N/AN/A
SBIR Phase I 1993 Department of DefenseArmy -
FIRE CONTROL BATTLE MANAGEMENT AND DECISION SUPPORT SYSTEM TECHNOLOGY (DECISION SUPPORT SYSTEM TECHNOLOGY WITHIN EMBEDDED...)
SBC: Lb&m Assoc., Inc. Topic: N/ATHE OBJECTIVES OF THIS PHASE I WORK ARE TO: DETERMINE THE DESIGN REQUIREMENTS FOR AN EMBEDDED TRAINING SYSTEM. DETERMINE THE MATURITY OF INTELLIGENT TUTORING SYSTEMS FOR INCLUSION IN EMBEDDED TRAINING. DERIVE THE DESIGN FOR AN EMBEDDED TRAINING SYSTEM WHICH INTEGRATES WITH DECISION SUPPORT SYSTEMS TECHNOLOGY. DETERMINE THE FEASIBILITY OF USING A SIMULATION MODULE IN CONJUNCTION WITH EMBEDDED TRAIN ...
SBIR Phase II 1993 Department of DefenseArmy -
An Active Noise Control Stethoscope
SBC: Noise Removal Systems Topic: N/AThe objective of the proposed work is to develop an electronic stethoscope that enables emergency medical personnel to check vital signs in the presence of high background noise levels. Often physicians in military vehicles and other noisy environments are unable to auscultate. The relevant stethoscope audio signal becomes unintelligible when masked by prohibitively loud noises. The proposed elect ...
SBIR Phase I 1993 Department of DefenseArmy -
Novel Ultrasonic Method for Food Dehydration
SBC: S.r. Taylor And Associates Topic: N/AFoods are dehydrated to make them more easily packaged and stored at room temperature. The removal of water reduces the opportunity for harmful chemical reactions. Dehydrated food powders and particles are also used in "liquid meals" for dental patients. However, dehydrated foods traditionally have been difficult to rehydrate and are of relatively poor quality. The reasons for these difficulties a ...
SBIR Phase I 1993 Department of DefenseArmy -
Size Distribution and Number Density of Airborne Particles Near the Ground Level-- Vertical Distribution and Wind Speed Dependence
SBC: Waterjet Technology Inc Topic: N/ATo enhance characterization of the propagation path of assorted Army electro-optical and electro-acoustic devices, a detailed understanding of atmospheric conditions near the ground surface is needed. This proposal concentrates on the effects due to the presence of airborne particles. The ground-level aerosol model currently implemented is rather crude and needs to be refined. In the proposed stud ...
SBIR Phase I 1993 Department of DefenseArmy -
3-D Radiography and Image Analysis of Defect Detection
SBC: Waterjet Technology Inc Topic: N/AIn Phase I of this project, we will investigate the feasibility of adding a "real-time" or "near real-time " stereoscopic imaging capability to the armaments radiographic inspection system already in place at Yuma Proving Ground. We will determine the best way to implement rapid, accurate, and cost-effective automated stereoscopic inspection with minimal modifications to existing equipment. We pro ...
SBIR Phase I 1993 Department of DefenseArmy -
SATELLITE KILL ASSESSMENT SPECTROSCOPY
SBC: Aeromet, Inc. Topic: N/ATO MEET THE KINETIC ENERGY ANTI-SATELLITE (KE ASAT) REQUIREMENTS FOR TIMELY AND RELIABLE KILL ASSESSMENT, AEROMET PROPOSES TO RECOMMEND INNOVATIVE TECHNIQUES IN REAL-TIME KILL ASSESSMENT SPECTROSCOPY. BECAUSE IT CAN BE CRITICALLY IMPORTANT TO ACCURATELY VERIFY SATELLITE ELIMINATION, A KILL ASSESSMENT SYSTEM MUST DISCERN BETWEEN VARIOUS HIT AND MISS PHENOMENA, INCLUDING THE USE OF POTENTIAL COUNTER ...
SBIR Phase I 1990 Department of DefenseArmy