You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ISABEL- Integrated Secure Automated Bug Extraction List

    SBC: SMART INFORMATION FLOW TECHNOLOGIES LLC            Topic: NA

    The ISABEL program will create symbolic execution signatures to classify bugs in the NIST Bugs Framework. Using the symbolic execution signature ISABEL will find a program input to trigger the bug using fuzz testing. ISABEL will integrate its bug categorization and bug triggering capability with a software development environment using a flexible framework that will allow both open source and comm ...

    SBIR Phase I 2017 Department of CommerceNational Institute of Standards and Technology
  2. XpressRules-PM: Commercial Implementation of PM/NGAC

    SBC: XpressRules LLC            Topic: NA

    This proposal represents a collaborative response by XpressRules and NIST to a two-fold demand from the information security marketplace. The business requirement (for true policy governance) is that asset owners and steward themselves-and not IT—become directly accountable for the life cycles of their rules and policies. The technical requirement (for an adequate data model) is that the policie ...

    SBIR Phase I 2017 Department of CommerceNational Institute of Standards and Technology
  3. Absolute Distance Interferometer for Manufacturing Metrology Applications

    SBC: Bridger Photonics, Inc.            Topic: NA

    Bridger Photonics, Inc. proposes to develop an absolute length metrology sensor that will simultaneously provide >1,000 measurements per second, 0.5 m maximum measurement distance. Bridger’s solution is will fill a gap in precision measurement technology for applications that require rapid monitoring of macroscopic distances such as positioning and calibration of surface metrology systems (CMM, ...

    SBIR Phase II 2017 Department of CommerceNational Institute of Standards and Technology
  4. AlphaBear2

    SBC: SPRY FOX LLC            Topic: EDIES17R0006

    This project team will fully develop and test AlphaBear 2, a vocabulary learning game for grade 4 to 7 students. Vocabulary is a prerequisite for academic success, as it is linked to stronger performance across academic subjects and improved reading comprehension. It is more difficult for students to participate in educational activities without understanding the key vocabulary associated with tha ...

    SBIR Phase II 2017 Department of EducationInstitute of Education Sciences
  5. A Collaborative Interface for Teacher-Student Interaction in Virtual Environments

    SBC: STRANGE LOOP GAMES INC.            Topic: edIES17R0005

    In prior projects, including a 2015 ED/IES SBIR award, the team developed two immersive multiplayer virtual game environments. In Eco and Colony, middle school students collaboratively apply scientific practices within the virtual worlds to address challenges, such as the availability of resources and energy and maintaining clean water. With this Phase I funding, the team is developing a prototype ...

    SBIR Phase I 2017 Department of EducationInstitute of Education Sciences
  6. Resilient Emergent Properties for Autonomous Agent InteRactions: REPAIR

    SBC: SMART INFORMATION FLOW TECHNOLOGIES LLC            Topic: SB162005

    SIFT, along with Drs. Julie Adams and Ramesh Sagili of Oregon State University (OSU), propose to develop Resilient Emergent Properties for Autonomous Agent InteRactions (REPAIR). Building upon recent innovative work in swarm control and optimization, and applying new observations of specific defensive and adaptive characteristics of honeybee colonies, REPAIR will provide biologically inspired meta ...

    SBIR Phase I 2017 Department of DefenseDefense Advanced Research Projects Agency
  7. Genetics and breeding of mealworms and their microbiomes for improved production

    SBC: Beta Hatch Inc.            Topic: SB163002

    The challenge of producing enough food for our growing planet requires incredible innovation. Insects are a sustainable alternative to existing agricultural inputs. However, to penetrate the $400B global feed industry, insects need to be produced both at...

    SBIR Phase I 2017 Department of DefenseDefense Advanced Research Projects Agency
  8. Next Generation Genome Editing Tools

    SBC: B-MoGen Biotechnologies Inc            Topic: SB163003

    This proposal leverages our expertise in genetic engineering in general, our success in multiplex gene editing, and nanoparticle-based gene delivery to achieve targeted base editing of hepatitis B virus (HBV) genomes in infected cells. Not only will this...

    SBIR Phase I 2017 Department of DefenseDefense Advanced Research Projects Agency
  9. Real-Time Metrology and Feedback Control for Additive Manufacturing

    SBC: Bridger Photonics, Inc.            Topic: SB163004

    SBIR Topic SB163-004 describes DARPAs need to develop a real-time system for active feedback control and process characterization of multi-material additive manufacturing. To fill this need, Bridger Photonics, Inc. (Bridger) will prove out an ...

    SBIR Phase I 2017 Department of DefenseDefense Advanced Research Projects Agency
  10. Enhanced Low-Power Transponder (ELT) for Spacecraft ID, Tracking, and Health Monitoring

    SBC: M42 Technologies, LLC            Topic: SB171015

    We propose to develop a system that will aid in the unique identification, accurate tracking, and state of health monitoring of satellites and other space objects. This system will consist of an Enhanced Low-Power Transponder (ELT) - a self-contained sm...

    SBIR Phase I 2017 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government