You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Rapid Fiber Installation on Base using FiberTRAX

    SBC: TRAXYL INC.            Topic: J201CSO1

    For decades, the Air Force flightlines have been plagued by a lack of data connectivity, and as technology advances, this digital divide has grown wider. Aircraft maintenance, communications, and training have all gone through digital transformations that

    SBIR Phase II 2023 Department of DefenseAir Force
  2. Primer.AI: Content Generation for Military Cyber Operations at Machine Scale and Machine Speed

    SBC: PRIMER FEDERAL INC            Topic: X224OCSO1

    Artificial intelligence (AI) and Natural Language Processing (NLP) have the potential to improve DAF workflows by accelerating and automating processes and tracking metrics to inform future decision making. Primer seeks to fill an intelligence gap identif

    SBIR Phase II 2023 Department of DefenseAir Force
  3. Winning Hide and Go Seek- Phase 2

    SBC: SYSTEMS ENGINEERING INC            Topic: AF2210013

    Inland search and rescue (SAR) are the responsibility of the Air Force. The Air Force Rescue Coordination Center (AFRCC) at Tyndall Air Force Base in Florida coordinates all inland SAR operations in the continental United States. However, the prosecution

    SBIR Phase II 2023 Department of DefenseAir Force
  4. RF-silent Voltage Regulators for Extreme Environments using AlInGaP Optocouplers

    SBC: Polaris Semiconductor LLC            Topic: X22DOTCSO1

    DC voltage regulators are crucial DC power management components in practically all modern defense electronics. Next generation satellite payloads require voltage regulators with state-of-the-art SWaP, electromagnetic interference (EMI) attributes, as wel

    STTR Phase II 2023 Department of DefenseAir Force
  5. FL-MSA-Kinetic Wireless Mesh for High Speed Flightline Connectivity

    SBC: KILSAR, INC.            Topic: AF2310019

    KILSAR is a software development company currently focused on making AR and MR a reality for the Air Force on a multitude of levels. In doing so and in partnership with other companies, we have created a system of systems that addresses the logistical iss

    SBIR Phase I 2023 Department of DefenseAir Force
  6. High Performance Nanocomposite Kraft Papers to Improve Insulation and Lifetime of Large Power Transformers

    SBC: C-CRETE TECHNOLOGIES LLC            Topic: C

    Transformers are critical for the power grid distributions via stepping up down the voltage. The key cause of failure in majority of transformers is the insulation problem related to the kraft paper. The objective of this project is to integrate a collection of advanced surface chemistry, kraft paper fabrication, and rapid property screening, followed by standard testings and pilot demonstration t ...

    SBIR Phase I 2023 Department of EnergyARPA-E
  7. High Performance Nanocomposite Kraft Papers to Improve Insulation and Lifetime of Large Power Transformers

    SBC: C-CRETE TECHNOLOGIES LLC            Topic: C

    Transformers are critical for the power grid distributions via stepping up down the voltage. The key cause of failure in majority of transformers is the insulation problem related to the kraft paper. The objective of this project is to integrate a collection of advanced surface chemistry, kraft paper fabrication, and rapid property screening, followed by standard testings and pilot demonstration t ...

    SBIR Phase II 2023 Department of EnergyARPA-E
  8. Airmen Adaptive Zero-Trust Authentication Platform for Web and Mobile Apps

    SBC: ROWND INC            Topic: AFX236DPCSO1

    To meet the operational imperatives set forth by Air Force Secretary Frank Kendall, cybersecurity leaders in the US Air Force (USAF) have conducted a thorough analysis of their networks and systems to determine their ability to withstand cyber threats. Wi

    SBIR Phase II 2023 Department of DefenseAir Force
  9. Test and Evaluation of Networked Environment and Corrosivity Monitoring

    SBC: LUNA LABS USA LLC            Topic: AF21ATCSO2

    The C-130 Hercules Transport Aircraft is subjected to a wide range of environmental severities, and schedule-based corrosion maintenance processes are insufficient to optimize corrosion management for individual aircraft.  Improved corrosion management ca

    STTR Phase II 2023 Department of DefenseAir Force
  10. HVPE-Based Gallium Oxide Epiwafer Development

    SBC: KYMA TECHNOLOGIES, INC.            Topic: AF224D029

    Gallium oxide is poised to play an important role in next generation power and microwave electronics. Significant efforts by the Air Force to bolster the domestic substrate supply have been largely successful, however the vast majority of the commercially

    SBIR Phase II 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government