You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DETERMINATION OF OPTIMAL BLEND RATIOS OF CNG AND GASOLINE FOR IMPROVED FUEL ECONOMY AND TORQUE IN ON-HIGHWAY VEHICLES

    SBC: Badillo Engineering, LLC            Topic: 08c

    State of the art modern gasoline drivetrains have seen improvements in fuel economy thru common methods that include increased static compression ratios, Direct injection, reduced pumping work thru variable cam timing, improved Knock Sensing approaches, engine downsizing, variable displacement, increased transmission gear ratios, & amp; lower numerical axle ratios. Unfortunately, fuel economy impr ...

    SBIR Phase I 2013 Department of Energy
  2. Silicon Carbide Quasi-Bipolar Junction Transistor (QBJT)-Based boost converter platform for up-tower wind applications

    SBC: GENESIC SEMICONDUCTOR INC.            Topic: 10b

    SiC power electronics are ideally suited for reducing the size and weight of power electronics systems that are used in wind power converters. Present power electronics systems require large transformers which operate a modest frequencies that prevents their use on top of the turbine tower. The electrical parasitics introduced by the interconnections between wind turbine and power conversion elect ...

    SBIR Phase I 2013 Department of Energy
  3. Multi-flux fiber optic probe of nuclear fuel performance

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: 19a

    Current commercial reactor fuel performance monitoring uses external power range monitors, and evaluates coolant water for contamination that would indicate failure of a fuel element. Estimates of the localized fission rates and temperature distributions within the reactor core are approximated using nuclear simulation codes. Real-time characterization of local in-core radiation field parameters w ...

    SBIR Phase I 2013 Department of Energy
  4. Rapid Manufacturing Method for High-Temperature Turbine Components

    SBC: Mikro Systems, Inc.            Topic: 15b

    Mikro Systems, Inc (Mikro) has a breakthrough manufacturing technology that can dramatically reduce the time and cost of designing, prototyping, and testing advanced high-temperature turbine components. The gas turbine industry needs rapid and cost effective prototyping methods to produce advanced high- temperature parts from application specific materials that can be used in hot test rigs and tes ...

    SBIR Phase I 2013 Department of Energy
  5. Cryogenically Flexible, Low Permeability Thoraeus Rubber H2 Dispenser Hose

    SBC: NANOSONIC INC.            Topic: 06a

    NanoSonic has recently developed high strength-to-weight ratio Thoraeus Rubber composites that maintain radiation resistance and EMI shielding upon severe and repeated mechanicals strains. This state-of-the-art, flexible shielding material was designed as a bladder for space-based enclosures that required ultra-low air permeability, radiation tolerance, resistance to hydrogen (H2) embrittlement ...

    SBIR Phase I 2013 Department of Energy
  6. Capability of Rolling Efficiency for 100M High-Speed Rails

    SBC: OG Technologies, Inc.            Topic: 02b

    Development of high-speed rail services in the US is one of the priorities of the current administration. High-speed rails have the potential to change the nations energy consumption landscape in transportation at a time when both the highway and railroad capacities are being saturated with increased demand. In preparation to expand the transportation infrastructure for the coming decades, railro ...

    SBIR Phase I 2013 Department of Energy
  7. Current Energy Harnessing using Synergistic Kinematics of Schools of Fish-Shaped Bodies

    SBC: VORTEX HYDRO ENERGY LLC            Topic: 09a

    Renewable energy generation is one of todays most challenging global dilemmas. The energy crisis requires tapping into every source of energy and developing every technology that can generate energy at a competitive cost within the next 50 years. Development of the FiSH-MHK transformative technology on top of the verified and pilot-tested VIVACE technology will bolster domestic energy security and ...

    SBIR Phase I 2013 Department of Energy
  8. FleX-3D Wafer Processing for Chip Stacking and Interconnect

    SBC: American Semiconductor, Inc.            Topic: 40e

    Reliable, readily-manufacturable technologies are needed to create the next generation of high-density, high-functionality 3D integrated circuits (ICs) for integrating silicon pixel detectors with CMOS read-out ICs. Current methods for 3D IC development are severely limited by the thickness of the CMOS wafers and the restrictions that result due to the diameter of the through-silicon vias (TSVs) t ...

    SBIR Phase I 2013 Department of Energy
  9. 10MHz, 10k-Pixel Fast Fiber-Coupled Imaging Devices for Plasma Diagnostics

    SBC: HYPERV TECHNOLOGIES CORP.            Topic: 28a

    High speed imaging of plasmas is limited to relatively short record lengths and is very expensive. Portions of the tradeoff space where slightly reduced spatial resolution allows gains in record length and reduced costs are poorly explored. HyperV Technologies Corp. proposes to construct a 100 pixel fiber coupled streak camera as a proof of concept towards an eventual goal of constructing a 100 ...

    SBIR Phase I 2013 Department of Energy
  10. Radiation resistant magnetic field sensor

    SBC: MICROXACT INC.            Topic: 42f

    All high power target facilities and accelerators, especially the Facility for Rare Isotope Beams (FRIB), require magnetic field sensors to measure magnetic fields in various magnets employed at these facilities as well as in cyclotrons. The currently used and/or commercially available sensors show only limited radiation resistance and in general require replacement every 3-4 months, resulting in, ...

    SBIR Phase I 2013 Department of Energy
US Flag An Official Website of the United States Government