You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Integrated Characterization and Modeling of Subsurface Properties Critical to Geothermal Energy Storage in Sedimentary Reservoirs

    SBC: NEW ENGLAND RESEARCH, INC.            Topic: C5513a

    C55-13a-270397To date, no integrated characterization and predictive modeling workflow has been proposed to optimize Geothermal Battery Energy Storage (GBES) systems in sedimentary formations. Of particular concern is the near wellbore formation integrity of GBES systems that are subject to Thermal-Hydraulic-Mechanical-Chemical (THMC) loading conditions: during injection, storage, and production c ...

    SBIR Phase I 2023 Department of Energy
  2. Multiphysics Motor Design Software Package Using MFEM

    SBC: IERUS TECHNOLOGIES INC            Topic: C5501b

    C55-01b-270447-AbstractAs device designs become more complex and incorporate new, advanced technologies and materials, accurate simulations of multi-physics phenomenology become critical to ensuring that such design and analysis efforts are successful. The diversity of problems of interest to the Department of Energy (DOE) and wider audiences includes examples such as electric motor/generator desi ...

    SBIR Phase I 2023 Department of Energy
  3. A Cost-Effective 3D Wildlife Tracking System

    SBC: WILDLIFE IMAGING SYSTEMS LLC            Topic: C5617a

    There are many issues that a wind developer must consider when siting a wind project, but one that has become increasingly pressing in the U.S. is the effect of turbines on local wildlife. New onshore wind development is occurring across the entire the U.S. and has brought wind plants into greater conflict with wildlife, especially bats. The burgeoning U.S. offshore wind industry is also contendin ...

    SBIR Phase I 2023 Department of Energy
  4. ThreatHelm: Enhanced Cyber Resiliency

    SBC: SENTAR, INC.            Topic: C5640h

    With the expectation of global nuclear energy to continue growth for the next several decades, the threat of cyber attacks will follow due to the increasing importance of the energy sector, emerging technologies and the continuously evolving capabilities of potential adversaries. Current accepted approaches for managing cyber risks focus on preventing access to critical systems by using tools such ...

    SBIR Phase I 2023 Department of Energy
  5. Orbital Assembly- Beamed Energy Receiver

    SBC: ABOVE: ORBITAL INC.            Topic: AFX234DCSO1

    Orbital Assembly is currently developing a beamed energy receiver for the use in commercial space stations. No technology to receive beamed power currently exists, and this technology will be applicable to US Government spacecraft with little modification

    SBIR Phase II 2023 Department of DefenseAir Force
  6. Miniaturized Fly-Along Sensor Package (MiniFASP)

    SBC: NOU SYSTEMS INC            Topic: AF231D013

    As a national defense priority and part of the strategic deterrence triad, Intercontinental Ballistic Missiles (ICBMs) have a key role in the nation’s defense.  The US Air Force routinely tests ICBMs to insure all aspects of their function. The Air Force

    SBIR Phase II 2023 Department of DefenseAir Force
  7. Nuclear Certification Reference Architecture

    SBC: VETS, LLC            Topic: AF231D012

    Attaining nuclear certification of Department of Defense (DoD) systems comes as the result of one of the most complex and comprehensive processes in the U.S. Government. Stakeholders required for nuclear certification extend beyond the DoD and cut across

    SBIR Phase II 2023 Department of DefenseAir Force
  8. Development of Novel Dual-Mode ASCENT RCS and 40 lbf Thruster Propulsion

    SBC: HYPERION AEROSPACE LLC            Topic: AFX236DPCSO1

    The USAF and USSF are seeking to increase their propulsive capability for larger spacecraft intended for service in near-Earth orbit and in cislunar orbit. The development of large ASCENT thruster size combined with an RCS system as proposed herein will e

    SBIR Phase II 2023 Department of DefenseAir Force
  9. Autonomous Painting of C-5, C-17, F-15, C-130, and MQ-9 Aircraft for Corrosion Control

    SBC: HUDSON STANDARD, LLC            Topic: AFX236DPCSO1

    The Warner Robins Air Logistics Complex (WR-ALC) conducts Programmed Depot Maintenance (PDM) and repairs on F-15, C-130, C-5, C-17 and MQ-9 aircraft. The group is responsible for the repair, modification, reclamation, and rework of over 200 aircraft world

    SBIR Phase II 2023 Department of DefenseAir Force
  10. A REAL-TIME APPLICATION SPECIFIC PROTECTION, DETECTION, & RESPONSE PLATFORM  FOR MISSION-CRITICAL SOFTWARE

    SBC: SEMANTICGUARD INC.            Topic: X224OCSO1

    Application layer attacks against mission-critical software have increased 800% between 2019 and 2020 becoming the single biggest cause of data breaches. As the USAF modernizes the F-22 and implements the JADC2 framework, cyber security must be meticulously embodied throughout the development and deployment of mission-critical applications to prevent and respond to state actors attempting to extra ...

    SBIR Phase I 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government