You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Electron-beam Switches for a High Peak Power Active SLED-II Pulse Compressor

    SBC: Omega-P, Inc.            Topic: 34c

    This SBIR project will be devoted to the development and demonstration of high-power X- band switches to operate with the two resonant delay lines of the SLED-II pulse compression system. Each switch is triggered with an intense electron beam drawn from a diamond-coated molybdenum cold cathode. Preliminary tests of prototype X-band switches using the Omega- P/NRL X-band magnicon have already sho ...

    SBIR Phase I 2013 Department of Energy
  2. A New Nb3Sn Process with a Novel Artificial Pinning Center for High Energy Physics and High Magnetic Field Applications

    SBC: Supramagnetics, Inc.            Topic: 35a

    The development of an APC Nb3Sn superconductor with tin-pin artificial pinning centers by the proposed approach in the Phase I program, is anticipated to have a significant impact on cost and performance in applications for undulator magnets. The overall technical approach for the Phase I project will be to develop and demonstrate an Nb3Sn superconductor with tin-Al2O3 pins for HEP magnets. The ...

    SBIR Phase I 2013 Department of Energy
  3. PRISMS- Profile Resolving In-Situ Soil Moisture Sensor

    SBC: TRANSCEND ENGINEERING AND TECHNOLOGY, LLC            Topic: 20a

    Many contaminated DOE sites are located in arid regions where depth to groundwater is significant and/or contaminants were discharged into a vadose zone through which transport to the groundwater table is dominated by unsteady, unsaturated groundwater flow. The absence of an effective means to monitor vadose zone moisture content in profile has been a persistent impediment to developing and calibr ...

    SBIR Phase I 2013 Department of Energy
  4. Variable Inlet Bypass for Efficient Wide Flow Range Turbocharger Compressor

    SBC: Concepts NREC, LLC            Topic: 06c

    Increased use of Exhaust Gas Recirculation (EGR) combined with engine downsizing has pushed automotive turbocharger compressor operation towards and often beyond its efficient and stable operating boundaries. Much of the drive cycle is spent operating the compressor at low flow rates and low pressure ratios, near the compressor surge line, in an area which is usually of low efficiency. Our prelimi ...

    SBIR Phase I 2013 Department of Energy
  5. Single Step Manufacturing of Low Catalyst Loading Electrolyzer MEAs

    SBC: Proton Energy Systems, Inc.            Topic: 01a

    Proton exchange membrane (PEM) electrolysis is industrially important as a green source of high purity hydrogen, for chemical applications as well as energy storage. However, the energy required to manufacture these units is still high, due to the multi-step processes employed. Today, the majority of cost and energy use in PEM electrolyzer manufacturing is contributed by the cell stack manufacturi ...

    STTR Phase I 2013 Department of Energy
  6. Novel Oxidizer for Ammonium Perchlorate Replacement

    SBC: NALAS ENGINEERING SERVICES INC            Topic: AF103211

    ABSTRACT: The DoD requires increased performance and increased density solid propellants for use on boost, strategic and tactical missile systems, however, simultaneously attaining higher energy and density while maintaining satisfactory physical properties is an extremely challenging goal. Current ingredients are incapable of imparting the desired performance and insensitivity. Because of sporad ...

    SBIR Phase II 2013 Department of DefenseAir Force
  7. Low-Noble-Metal-COntent Catalysts/Electrodes for Hydrogen Production by Water Electrolysis

    SBC: Proton Energy Systems, Inc.            Topic: 09g

    The economical use of hydrogen as a transportation and stationary power fuel remains a long-term DOE objective. Energy storage applications in Europe such as wind capture and improved biogas conversion efficiency are also driving significant interest in hydrogen production from renewable sources. New and efficient catalytic processes for hydrogen generation are therefore needed to achieve produc ...

    STTR Phase II 2013 Department of Energy
  8. Economical Production of Hydrogen Through Development of Novel, High Efficiency Electrocatalysts for Alkaline Membrane Electrolysis

    SBC: Proton Energy Systems, Inc.            Topic: 17c

    Proton OnSite, in collaboration with the Illinois Institute of Technology, proposes development of a low cost, membrane-based hydrogen generator, based on catalyst and membrane materials advancements. Economical and environmentally benign production and storage of hydrogen for energy markets remains a challenge. The proposed project leverages anion exchange membranes, enabling elimination of the ...

    SBIR Phase II 2013 Department of Energy
  9. Electron Gun and Beam Collector for a 650-kW, 1.3-GHz Low-Voltage Multi-Beam Klystron for the Project-X Pulsed Linac

    SBC: Omega-P, Inc.            Topic: 27c

    The 8 GeV pulsed linear accelerator that is being planned at Fermi National Accelerator Laboratory (FNAL) as part of its Project X requires a high-power radio frequency amplifier with parameters that are not available from commercial sources. Omega-P, Inc., in a technical collaboration with FNAL, is to develop, build, and deliver for tests at FNAL, a 500-kW, 1.3 GHz multi-beam klystron to fulfill ...

    SBIR Phase II 2013 Department of Energy
  10. RF Cavity Chain and Magnetic Circuit for a 650 kW, 1.3-GHz Low-Voltage Multi-Beam Klystron for the Project-X Pulsed Linac

    SBC: Omega-P, Inc.            Topic: 27c

    The 8 GeV pulsed linear accelerator that is being planned at Fermi National Accelerator Laboratory (FNAL) as part of its Project X requires a high-power radio frequency amplifier with parameters that are not available from commercial sources. Omega-P, Inc., in a technical collaboration with FNAL, is to develop, build, and deliver for tests at FNAL, a 500-kW, 1.3 GHz multi-beam klystron to fulfill ...

    SBIR Phase II 2013 Department of Energy
US Flag An Official Website of the United States Government