You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Wide-Field-of-View Collection Optics for Infrared Surveillance from Geosynchronous Orbit

    SBC: COMPUTER OPTICS INC.            Topic: AF071280

    Computer Optics Inc proposes to leverage its existing technology portfolio towards producing a lens for a 10 year mission into geosynchronous orbit.

    SBIR Phase I 2007 Department of DefenseAir Force
  2. Physics-Based Identification and Management of Aeroelastic Limit-Cycle Oscillations (LCO)

    SBC: EQUILIBRIA            Topic: AF07T006

    The objective of the proposed effort is to develop a systematic approach for building reduced-order models (nonlinear coupled finite-degree-of-freedom equations) capable of reliably modeling and predicting limit cycle oscillations (LCOs) and using these models in LCO management procedures. The models will be developed by combining (a) physical observations from ground vibration, wind tunnel, and ...

    STTR Phase I 2007 Department of DefenseAir Force
  3. FastCAL PD-Meter: A Self-Calibrating, Millimeter Wave, Advanced Architected, Power Density Meter

    SBC: KNOX ELECTRONIC TECHNOLOGIES, INC.            Topic: AF071043

    Knox Electronic Technologies will develop a power density measurement platform that meets the requirements expressed in SBIR Subtopic AD07-043 with a measurement uncertainty of ± 0.4 dB at 100 GHz and that can be used in electromagnetic fields that are greater than 1 W/cm2. Existing power density meters can only measure as high as 40 GHz with reported accuracies of ± 1.0 dB, and they are extrem ...

    SBIR Phase I 2007 Department of DefenseAir Force
  4. Untethered Helmet-Mounted Display for Night Vision Goggle Training Systems

    SBC: OASYS TECHNOLOGY, LLC.            Topic: AF071019

    This SBIR program requires the development of a novel, wireless head-mounted video system which can functionally replace the current night vision goggle simulation headset. OASYS Technology, LLC. will apply expertise in optical and display system design coupled with Pinpoint Solutions, Inc. expertise in wireless video electronics to create a fully compliant 1280x1024 pixel binocular HMD with 40 d ...

    SBIR Phase I 2007 Department of DefenseAir Force
  5. CSAR-X Digital Visionic System

    SBC: OASYS TECHNOLOGY, LLC.            Topic: AF071028

    This proposal outlines a technical approach for a goggle system that utilizes a SWIR and LWIR imagers to present operators with fused imagery of the two spectral bands in a man portable, head mountable goggle system. Furthermore, as part of this research key avionics information will also be presented to the operators in the eyepiece of the goggle system.

    SBIR Phase I 2007 Department of DefenseAir Force
  6. Advanced In-Flight Rebreather

    SBC: CREARE LLC            Topic: AF071034

    Flight crews require supplemental oxygen for emergency high cabin altitude operations. Some flight crews require a walk-around oxygen supply to move freely throughout the cabin until the altitude is reduced to a safe level. Current low-pressure bottles cannot supply oxygen for an adequate duration in an acceptable cylinder size, and multiple cylinders would be required to meet the mission requir ...

    SBIR Phase I 2007 Department of DefenseAir Force
  7. Microburner for Deployed Energy Systems

    SBC: CREARE LLC            Topic: AF071131

    Compact, efficient, and sustainable electric power generators are needed to provide mobile electric power for deployable military bases. Fuel cells with fuel processors that run on logistic fuel are attractive candidates due to inherent efficiency, practicality, sustainability, and safety. In these low-power devices (0.5 kW to 15 kW), fuel atomization and evaporation prove to be limiting factors ...

    SBIR Phase I 2007 Department of DefenseAir Force
  8. An Advanced Compressor for High-Capacity Turbo-Brayton Cryocoolers

    SBC: CREARE LLC            Topic: MDA05016

    STSS and future DOD infrared sensor missions will require reliable, efficient and lightweight cryocoolers. A prior program at Creare resulted in the design of a two-stage turbo-Brayton cryocooler for load temperatures of 85 K and 35 K. The cryocooler is comparable in mass and efficiency with competing cryocooler technologies, and has the inherent benefits of negligible vibration emittance, abili ...

    SBIR Phase I 2007 Department of DefenseAir Force
  9. Demonstration of Inter-Turbine Burners for Part-Power Improvements

    SBC: CREARE LLC            Topic: OSD07ES9

    Conventional gas turbine engines are often optimized for a specific narrow range of the flight envelope and perform much less efficiently at off-design conditions. Introduction of an inter-turbine burner (ITB) into a gas turbine design can add a level of adjustability to the engine performance that in turn provides improved operating efficiency over a wider range of the operating envelope. In th ...

    SBIR Phase I 2007 Department of DefenseAir Force
  10. Improved Heat Release Models for Augmentors

    SBC: CREARE LLC            Topic: AF071174

    Combustion stability is critical to the operational performance and safety of military jet engines. Dynamic instability results from positive feedback coupling that can occur between heat release (combustion) and pressure oscillations (acoustics) in the augmentor. Dynamic instabilities are poorly understood and present designers with a particularly challenging problem when they arise. It is not ...

    SBIR Phase I 2007 Department of DefenseAir Force
US Flag An Official Website of the United States Government