You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Increase Product Availability And Improve Life Cycle Support For MILSATCOM System Components

    SBC: MENTIS SCIENCES INC            Topic: DLA182005

    Mentis Sciences Inc. (Mentis) proposes to develop a refurbishment program that is capable of disassembling, inspecting, and re-building complex systems and components, with the initial system of focus being the Minuteman Missile Antenna/Antenna Pedestal Assembly.To become a refurbishment supplier, Mentis will develop and adapt inhouse processes for performing refurbishment services by leveraging c ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  2. Tamper Resistant/Anti-Counterfeit Package Labeling

    SBC: H NU Photonics LLC            Topic: DLA163003

    The Defense Logistics Agency (DLA) top priority is warfighter support, and the DLA is firmly committed to a robust counterfeit mitigation strategy that protects our warfighters and the vital missions they perform. HNu Photonics, LLC (HNu) Color Holographic Quick Response (CHQR, pronounced “Checker”) technology combines RGB 3-layer QR codes with holographic imaging technology, and is as robust ...

    SBIR Phase II 2018 Department of DefenseDefense Logistics Agency
  3. Green Monopropellant Thruster TRL Maturation Scaling Effort

    SBC: CREARE LLC            Topic: MDA12T008

    Diode-Pumped Alkali Lasers (DPALs) have great potential for high-energy lasers. Proper design of these systems is challenging because many interrelated processes impact their performance, and critical kinetic rate coefficients are not well known. In response, our team is developing a comprehensive physics-based analysis/design tool, and experimentally determining key kinetic rate coefficients. The ...

    STTR Phase II 2018 Department of DefenseMissile Defense Agency
  4. Carbon Nanotube Windshield Heater

    SBC: CREARE LLC            Topic: N182103

    Creare is proposing to develop a heater utilizing carbon nanotubes (CNTs) that will have high temperature uniformity and high optical transmission with low glare. By creating a variable effective sheet resistance across the windshield, we will be able to produce a robust design that can be flexed and easily scaled up to a production environment. In Phase I, we will fabricate and test a coupon size ...

    SBIR Phase I 2018 Department of DefenseNavy
  5. Analysis and Application of Treatments to Mitigate Exfoliation Corrosion (Delamination) of 5XXX Series Aluminum

    SBC: OCEANIT LABORATORIES INC            Topic: N18AT016

    Oceanit proposes to research and develop chemical or non-chemical methods and processes to impart surface morphology modifications to aluminum-magnesium (Al-Mg) alloys to mitigate and increase the exfoliation corrosion resistance.

    STTR Phase I 2018 Department of DefenseNavy
  6. CS:CLIPBoard- Integrated Barcode and Inventory Management System

    SBC: Premier Solutions HI, LLC            Topic: N171077

    The automated identification and processing of goods and documents using machine-readable barcode identifiers is one of the key enabling technologies underlying most modern logistics system. However, the Navy’s efforts to utilize barcode technology with the Fleet Food Service Management (FSM) system has been often challenged by unique requirements for food service aboard operational vessels, the ...

    SBIR Phase II 2018 Department of DefenseNavy
  7. Inflatable Multi-Platform Recovery System

    SBC: PacMar Technologies LLC            Topic: N172124

    The objective of the completed Phase I effort was to develop a highly compact and lightweight, rapidly deployable, inflatable sled to facilitate the high-speed surface tow of a disabled undersea vehicle. Currently, no man-portable solution exists. The driving mission requirements for the inflatable sled are a weight objective of 150 lb and a stowage objective of 24 in24 in36 in. Realizing that the ...

    SBIR Phase II 2018 Department of DefenseNavy
  8. ACV Autonomous Sled Technologies

    SBC: PacMar Technologies LLC            Topic: N172133

    A craft capable of transporting an ACV from a well deck ship to shore at speeds in excess of 30 knots is being proposed. This craft, referred to as a “Sled,” is based on the use of inflatable drop-stitch panels coupled to a simple aluminum frame. This approach offers the means to collapse the sled in constituent parts that can be stored in a small volume. The propulsion system is also modulari ...

    SBIR Phase II 2018 Department of DefenseNavy
  9. Biomechanical Rat Testing Device to Validate Primary Blast Loading Conditions for Mild Traumatic Brain Injury

    SBC: CREARE LLC            Topic: A17AT022

    Blast induced Traumatic Brain Injury (TBI) is a major threat to the health of military personnel serving in modern theaters. As such, the biomechanical injury pathways of TBI are, and have been, the focus of many animal studies. However, differences in the experimental setups across laboratories make it difficult to draw definitive conclusions from the resulting data. A tool that can accurately es ...

    STTR Phase II 2018 Department of DefenseDefense Health Agency
  10. Reverse Engineering and Source Approval for Aerospace Components

    SBC: MENTIS SCIENCES INC            Topic: DLA171002

    Mentis Sciences Inc. proposes to develop Technical Data Packages and generate Source Approval Requests for critically needed components for the Air Launched Cruise Missile engine platform, the F107, which is no longer supported by the OEM. The supply of some spare parts may be exhausted as early as Oct 2018, on a system that is scheduled to remain in service through at least 2030.Mentis will work ...

    SBIR Phase II 2018 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government