You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Reverse Engineering of MILSTAR Battery Pack

    SBC: MAINSTREAM ENGINEERING CORP            Topic: DLA182003

    Increased competition and improved lead times are desired by the Defense Logistics Agency (DLA) for the MILSTAR system battery assembly. Mainstream Engineerings unique integration of engineering, manufacturing, quality control, and integrated logistics support (ILS) provides the government with the best value for the proposed NSN.The MILSTAR nickel-metal hydride battery pack lacks sufficient comme ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  2. Increase Product Availability And Improve Life Cycle Support For MILSATCOM System Components

    SBC: MENTIS SCIENCES INC            Topic: DLA182005

    Mentis Sciences Inc. (Mentis) proposes to develop a refurbishment program that is capable of disassembling, inspecting, and re-building complex systems and components, with the initial system of focus being the Minuteman Missile Antenna/Antenna Pedestal Assembly.To become a refurbishment supplier, Mentis will develop and adapt inhouse processes for performing refurbishment services by leveraging c ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  3. Source Approval for B-52 Wing to Fairing Seal

    SBC: MAINSTREAM ENGINEERING CORP            Topic: DLA181007

    Increased competition and improved lead times are desired by the Defense Logistics Agency (DLA) for a number of NESO items with annual demand values over $10,000 and fewer than two approved sources. Mainstream Engineerings unique integration of engineering, manufacturing, quality control, and integrated logistics support (ILS) provides the government with the best value for the proposed NSN.The B- ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  4. Additive Manufacturing Process Monitoring and Control Technologies

    SBC: Made In Space, Inc.            Topic: DLA181002

    Made In Space, Inc. (MIS) and Siemens PLM Software propose an integrated Automated Processing. Monitoring, Control and Remediation System (Aul) to provide a process monitoring and control capability. Made In Space, Inc. leads the effort based on integrating Made In Space, Inc., proven inspection sensors systems with a Digital Thread for Additive Manufacturing (DTAM) system, co-developed by Siemens ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  5. Increase Competition through Small Business Source Approval Request (SAR) for DLA Nuclear Enterprise Support Office (NESO) NSNs: 5330-01-239-8862, 5330-01-239-8863, 5330-01-239-8864, and 5330-01-239-8

    SBC: PARTS LIFE INC            Topic: DLA181009

    Parts Life Incorporated (PLI) will utilize it's proven SAR Process and Reverse Engineering Risk Avoidance Process (RERAP) to demonstrate its ability replicate the Non Metallic Seal Special Shapes, 5330-01-239-8862, 5330-01-239-8863, 5330-01-239-8864, and 5330-01-239-8863. The DLA will have an alternate source for a part reaching obsolescence and in need of competitive supply. Parts Life Incorporat ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  6. Increase Competition through Small Business Source Approval Request (SAR) for DLA Nuclear Enterprise Support Office (NESO) NSN: 1095-00-488-0829

    SBC: Brighton Cromwell, LLC            Topic: DLA181006

    This proposal introduces an approach from Brighton Cromwell to improve product availability and increase competition through the development of Small Business eligible manufacturing utilizing the DLAs Land and Maritime (L&M) Limited Source National Stock Number (NSN) List. The list contains NSNs with an Annual Demand Value (ADV) >$10K currently sourced with only 1-2 manufacturers. We are offering ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  7. Memory Instrumentation and Performance Simulation (MIPS)

    SBC: ATC-NY INC            Topic: DTRA172003

    Next-generation high-performance computing (HPC) hardware, such as the Intel Xeon Phi Knights Landing Many-Integrated-Core processor, provide new deep memory architectures that offer the promise of increased performance. The challenge in taking full advantage of this architecture is selecting which data structures will be placed in the high-bandwidth memory. Optimizing data structure placement in ...

    SBIR Phase I 2018 Department of DefenseDefense Threat Reduction Agency
  8. Low-Cost Sensing Array for Infrasound

    SBC: CREARE LLC            Topic: DTRA172001

    Infrasound and seismic measurements are used by DTRA and the DoD for nuclear test monitoring, terrorist blast forensics, battle damage assessment, and environmental monitoring. However, these long wavelength physical signals are typically recorded through single-point sensors or sparse low density arrays. As a result, the critical signals of interest are often corrupted or masked by noise or inter ...

    SBIR Phase I 2018 Department of DefenseDefense Threat Reduction Agency
  9. A Robust, Machine Independent, Software Toolkit for Topology Aware Process Mapping on Distributed Memory HPC Architectures

    SBC: CONTINUUM DYNAMICS INC            Topic: DTRA172002

    A significant performance gap exists between the theoretical number of Floating Point Operations (FLOPS) that a HPC machine is capable of sustaining and the number of FLOPS realized by real-world HPC applications. One of the principle reasons for this gap is the parasitic work that computational processes must do to communicate with one another. It has been shown that this communication work can b ...

    SBIR Phase I 2018 Department of DefenseDefense Threat Reduction Agency
  10. Rapid Sourcing for Critical ALRE Items

    SBC: MAINSTREAM ENGINEERING CORP            Topic: DLA172001

    Increased competition and improved lead times are desired by the Defense Logistics Agency (DLA) for Aircraft Launch and Recovery Equipment (ALRE) Critical Safety/Critical Application Items (CSI/CAI). Ten ALRE National Stock Number (NSN) items were identified with annual demand values over $10,000 with two or fewer approved sources.Mainstream Engineering has carefully reviewed the ten NSNs provided ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government