You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Rapid Assessment of Air Void System in Fresh Concrete

    SBC: CREARE LLC            Topic: 171FH2

    Proposal title: Rapid Assessment of Air Void System in Fresh Concrete Water expansion during freeze-thaw cycles can cause deterioration in concrete, leading to scaling, cracking, and crumbling over a period of years. Resistance to this damage is achieved with a system of voids formed by adding surfactants to the fresh concrete to stabilize air bubbles naturally entrained during mixing. The volume ...

    SBIR Phase II 2018 Department of Transportation
  2. Advanced Radar Concepts For Small (Tier I/II) RPAs

    SBC: IMSAR LLC            Topic: AF112144

    Intelligence, Surveillance, and Reconnaissance (ISR) platforms play an increasingly important role in modern warfare.The goal of providing timely and actionable information to the warfighter can be greatly facilitated by the ability to simultaneously collect multiple types of sensor data.Imaging one target without losing track of another target can mean the difference between mission success and m ...

    SBIR Phase II 2018 Department of DefenseSpecial Operations Command
  3. Broken Rail Detection from Flashing Rear End Device

    SBC: CREARE LLC            Topic: 171FR2

    Proposal title: Broken Rail Detection from Flashing Rear End Device Broken rails are a common cause of mainline derailments and a particular concern given the increasing use of our rail system for passenger traffic and petroleum products. The progressive nature of the defects provides an opportunity for early detection of cracks before they become significant enough to cause a derailment. Unfortu ...

    SBIR Phase II 2018 Department of Transportation
  4. Advanced Durability Systems for Unmanned Aerial Vehicle Propulsion

    SBC: IBC Materials & Technologies, LLC            Topic: SOCOM163002

    Group 2-3 UAS engines have low mean time between overhauls (MTBOs), often with as little as 200-400 hours before maintenance must be conducted.This leads to significant maintenance cost and logistics tail for deployed operations.Two-stroke piston and rotary engines for Group 2-3 platforms have common maintenance drivers such as carbon fouling, and wear of cylinders, housings and bearings.Phase I r ...

    SBIR Phase II 2018 Department of DefenseSpecial Operations Command
  5. Cloud Data Synchronization with Limited Bandwidth Communications

    SBC: BLACK RIVER SYSTEMS COMPANY, INC.            Topic: SOCOM163005

    As the DoD continues to develop applications backed by cloud-based data and enterprise infrastructures, remote-sites will require on-site data caches to permit operation during periods of disconnect from the enterprise.To address this challenge for SOCOMs Chimera system, Black River will develop a stand-alone Chimera system that is independent of Amazon cloud software; develop bi-directional data ...

    SBIR Phase II 2018 Department of DefenseSpecial Operations Command
  6. Rotary-Wing UAV as On-Demand Sensor Platform for Aircraft Operators

    SBC: Lite Machines Corporation            Topic: SOCOM05011

    USSOCOM has a need to provide high-resolution video imagery to the sensor operators of current and future gunships, other unmanned aircraft systems, and similar platforms, while supporting missions above an area of interest. The key factors driving this need are the ability to see beyond visual range of the main platform, assist sensors on the main platform to see through weather and to aid in mo ...

    SBIR Phase II 2008 Department of DefenseSpecial Operations Command
  7. Interactive Language Trainer

    SBC: PROGRESSIVE EXPERT CONSULTING, INC.            Topic: SOCOM06010

    PEC proposes to work on advanced curriculum development in order to integrate into an advanced gaming environment. To this end, PEC will adapt existing USSOCOM curriculum and provide guidance to developers in order to implement the curriculum. In addition, PEC will create avatars which can teach and demonstrate cultural gestures. These avatars will be advanced such that a user can take control of ...

    SBIR Phase II 2008 Department of DefenseSpecial Operations Command
  8. PDA-Based Portable Data Collection System for Commercial Vehicle Inspection

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: 02FM1

    More than 1,300,000 Level 1 commercial vehicle inspections - a safety-critical, time-consuming, often difficult and painstaking process, especially as regards the brake inspection component -- are performed every year in the United States, under all sorts of weather and lighting conditions. The current technology used adds to the complexity and error potential inherent in this important task. In ...

    SBIR Phase II 2008 Department of Transportation
US Flag An Official Website of the United States Government