You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Caring for the Caregiver: A Theory-Driven Mobile Intervention to Promote Caregiver Well-Being

    SBC: Pro-Change Behavior Systems, Inc.            Topic: NIA

    Overmillion Americans are currently providing unpaid care to a family memberrelativeor friend with Alzheimer s disease or related dementiaWhile caregiving can be a positive experience that brings meaning and an increased sense of purposeit can also take a tollNearlyof Alzheimer s and dementia caregivers rate their emotional distress as high or very highand as many assuffer from depressionCaregiver ...

    SBIR Phase I 2018 Department of Health and Human ServicesNational Institutes of Health
  2. OnTRACK: Mobile Application for Pediatric Post-TBI Patient Management

    SBC: CREARE LLC            Topic: NCIPC

    PROJECT SUMMARYCreare and its clinical and research partners propose to develop a software platformOnTRACKOnline Treatment Recovery Assistance for Concussion in Kidsfor children and adolescents recovering from concussion or mild traumatic brain injurymTBIThe platform includes a mobile applicationappfor the patients and their care teamparentsteacherscoachesetca database serverand a decision support ...

    SBIR Phase I 2018 Department of Health and Human ServicesCenters for Disease Control and Prevention
  3. Rotorcraft Fuel Bladder Weight and Total Ownership Cost Reduction

    SBC: Response Technologies, LLC            Topic: DLA182001

    Response Technologies will attempt to qualify to MIL-DTL-27422Fs phase I performance testing criteria for thefuel cell test cubes[Class BSemi rigid or self-supporting fuel construction, Type ISelf-sealing, and Protection Level CFull self-sealing against 50 caliber and partial self-sealing against 14.5 mm] .Response Technologiesuses an additive manufacturing process that initially creates a textile ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  4. Increase Product Availability And Improve Life Cycle Support For MILSATCOM System Components

    SBC: MENTIS SCIENCES INC            Topic: DLA182005

    Mentis Sciences Inc. (Mentis) proposes to develop a refurbishment program that is capable of disassembling, inspecting, and re-building complex systems and components, with the initial system of focus being the Minuteman Missile Antenna/Antenna Pedestal Assembly.To become a refurbishment supplier, Mentis will develop and adapt inhouse processes for performing refurbishment services by leveraging c ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  5. Green Monopropellant Thruster TRL Maturation Scaling Effort

    SBC: CREARE LLC            Topic: MDA12T008

    Diode-Pumped Alkali Lasers (DPALs) have great potential for high-energy lasers. Proper design of these systems is challenging because many interrelated processes impact their performance, and critical kinetic rate coefficients are not well known. In response, our team is developing a comprehensive physics-based analysis/design tool, and experimentally determining key kinetic rate coefficients. The ...

    STTR Phase II 2018 Department of DefenseMissile Defense Agency
  6. SOURCE APPROVAL REQUEST (SAR) FOR MULTIPLE ITEMS and First Article

    SBC: NDI ENGINEERING COMPANY            Topic: DLA171002

    This proposal seeks NDI Engineering Company (CAGE code: 4X596) to become approved as apotential source of supply to DLA for the MK 2 Nose Gear Launch Shaft Assembly, NAVAIRpart number 511224-1; Shaft, Shouldered, NSN 3040-00-224-9019. In Phase I, NDIEngineering Company submitted one a Source Approval Request (SAR) for the manufacturingof the Shaft Assembly defined as NAVAIR part number 511224-1. I ...

    SBIR Phase II 2018 Department of DefenseDefense Logistics Agency
  7. Multicore Fiber Optic Connector for Wideband Digital and Analog Photonic Links

    SBC: CHIRAL PHOTONICS INC            Topic: N182102

    Fiber optic data links are attractive for their wide bandwidth, low weight, electromagnetic interference immunity and ability to transmit high fidelity analog and digital radio-frequency-over-fiber (RFoF) signals. Multicore fiber (MCF) links will provide even higher capacity and density and enhance dynamic range analog links using parallel fibers of precisely equal length. The need for a high-qual ...

    SBIR Phase I 2018 Department of DefenseNavy
  8. Carbon Nanotube Windshield Heater

    SBC: CREARE LLC            Topic: N182103

    Creare is proposing to develop a heater utilizing carbon nanotubes (CNTs) that will have high temperature uniformity and high optical transmission with low glare. By creating a variable effective sheet resistance across the windshield, we will be able to produce a robust design that can be flexed and easily scaled up to a production environment. In Phase I, we will fabricate and test a coupon size ...

    SBIR Phase I 2018 Department of DefenseNavy
  9. Discovery

    SBC: Semandex Networks Inc.            Topic: SB171005

    During the phase I effort, Semandex Networks and its team designed and implemented a proof-of-concept cloud-based application for knowledge navigation and document discovery that combines powerful text analytics with an intuitive UI. The prototype capability is poised to transform current data archival systems into meaningful connected information. The proof-of-concept prototype developed during t ...

    SBIR Phase II 2018 Department of DefenseDefense Advanced Research Projects Agency
  10. Reverse Engineering Technical Data Packages for Development of Alternate Sources of Supply for DLA NSNs

    SBC: Brighton Cromwell, LLC            Topic: DLA171002

    In Phase 1, we obtained samples through the RPPOB process, performed due diligence, reverse engineered, created engineering drawings, performed positive material identifications, assigned proper quality control documentation, and all pertinent technical activities to complete a technical data package in accordance with the DLA requirements and submit a SAR for evaluation and acceptance. In this pr ...

    SBIR Phase II 2018 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government