You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Rapid Assessment of Air Void System in Fresh Concrete

    SBC: CREARE LLC            Topic: 171FH2

    Proposal title: Rapid Assessment of Air Void System in Fresh Concrete Water expansion during freeze-thaw cycles can cause deterioration in concrete, leading to scaling, cracking, and crumbling over a period of years. Resistance to this damage is achieved with a system of voids formed by adding surfactants to the fresh concrete to stabilize air bubbles naturally entrained during mixing. The volume ...

    SBIR Phase II 2018 Department of Transportation
  2. Broken Rail Detection from Flashing Rear End Device

    SBC: CREARE LLC            Topic: 171FR2

    Proposal title: Broken Rail Detection from Flashing Rear End Device Broken rails are a common cause of mainline derailments and a particular concern given the increasing use of our rail system for passenger traffic and petroleum products. The progressive nature of the defects provides an opportunity for early detection of cracks before they become significant enough to cause a derailment. Unfortu ...

    SBIR Phase II 2018 Department of Transportation
  3. A Multimodal Acoustic Tool for Inline Pipe Inspection

    SBC: CREARE LLC            Topic: 180PH1

    A Multimodal Acoustic Tool for Inline Pipe Inspection 3/19/2018 The US energy transport pipeline system is a longstanding distribution network with most of its still standing pipes being installed between the 1950s–1970s. Due to degradation mechanisms, such as embrittlement, capable of causing a two-fold reduction in fracture toughness, pipe rupture is a major risk. Current nondestructive ins ...

    SBIR Phase I 2018 Department of Transportation
  4. Combined Cleaning and Guided Wave Inspection System for Hazardous Liquid Pipelines

    SBC: ULC TECHNOLOGIES LLC            Topic: 180PH2

    Combined Cleaning and Guided Wave Inspection System for Hazardous Liquid Pipelines 3/20/2018 For this SBIR we will develop a machine vision system which uses onboard standard-resolution cameras in vehicles to identify and read barcode signs on the roadside. The proposed approach could provide a low-cost solution that make connected and automated vehicle (CAV) technology viable for rural areas ...

    SBIR Phase I 2018 Department of Transportation
  5. Memory Instrumentation and Performance Simulation (MIPS)

    SBC: ATC-NY INC            Topic: DTRA172003

    Next-generation high-performance computing (HPC) hardware, such as the Intel Xeon Phi Knights Landing Many-Integrated-Core processor, provide new deep memory architectures that offer the promise of increased performance. The challenge in taking full advantage of this architecture is selecting which data structures will be placed in the high-bandwidth memory. Optimizing data structure placement in ...

    SBIR Phase I 2018 Department of DefenseDefense Threat Reduction Agency
  6. Low-Cost Sensing Array for Infrasound

    SBC: CREARE LLC            Topic: DTRA172001

    Infrasound and seismic measurements are used by DTRA and the DoD for nuclear test monitoring, terrorist blast forensics, battle damage assessment, and environmental monitoring. However, these long wavelength physical signals are typically recorded through single-point sensors or sparse low density arrays. As a result, the critical signals of interest are often corrupted or masked by noise or inter ...

    SBIR Phase I 2018 Department of DefenseDefense Threat Reduction Agency
  7. Additive Manufacturing of All Solid-State Batteries with Novel Electrode Architectures

    SBC: STORAGENERGY TECHNOLOGIES INC            Topic: DTRA172005

    Supercapacitors have attracted considerable recent attentions due to their high-power density, and long cycle life. Unfortunately, the energy density of supercapacitors is too low to meet these applications requiring an energy supply for longer periods (hours or days). Storagenergy Technologies Inc. proposes to develop a superior all solid-state battery (ASSB) fabricated by additive manufacturing ...

    SBIR Phase I 2018 Department of DefenseDefense Threat Reduction Agency
  8. A Robust, Machine Independent, Software Toolkit for Topology Aware Process Mapping on Distributed Memory HPC Architectures

    SBC: CONTINUUM DYNAMICS INC            Topic: DTRA172002

    A significant performance gap exists between the theoretical number of Floating Point Operations (FLOPS) that a HPC machine is capable of sustaining and the number of FLOPS realized by real-world HPC applications. One of the principle reasons for this gap is the parasitic work that computational processes must do to communicate with one another. It has been shown that this communication work can b ...

    SBIR Phase I 2018 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government