You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Rapid Assessment of Air Void System in Fresh Concrete

    SBC: CREARE LLC            Topic: 171FH2

    Proposal title: Rapid Assessment of Air Void System in Fresh Concrete Water expansion during freeze-thaw cycles can cause deterioration in concrete, leading to scaling, cracking, and crumbling over a period of years. Resistance to this damage is achieved with a system of voids formed by adding surfactants to the fresh concrete to stabilize air bubbles naturally entrained during mixing. The volume ...

    SBIR Phase II 2018 Department of Transportation
  2. Broken Rail Detection from Flashing Rear End Device

    SBC: CREARE LLC            Topic: 171FR2

    Proposal title: Broken Rail Detection from Flashing Rear End Device Broken rails are a common cause of mainline derailments and a particular concern given the increasing use of our rail system for passenger traffic and petroleum products. The progressive nature of the defects provides an opportunity for early detection of cracks before they become significant enough to cause a derailment. Unfortu ...

    SBIR Phase II 2018 Department of Transportation
  3. High Fidelity Modeling of Building Collapse with Realistic Visualization of Resulting Damage and Debris

    SBC: Thornton Tomasetti, Inc.            Topic: DTRA082005

    The proposed Phase II effort investigates innovative finite element formulations, alternative structural modeling procedures and modern parallel computational strategies to improve the computational performance of high fidelity simulation software for modeling the progressive collapse behavior of blast damaged buildings. Its goal is to reduce the time required to compute and visualize high fideli ...

    SBIR Phase II 2010 Department of DefenseDefense Threat Reduction Agency
  4. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The proposed buried innerduct/duct network (BIN) comprises an integrated system to facilitate future upgrades of buried communications (telephony, CATV) and power lines. The objective of the project is to provide improved, cost-effective hardware and practices relative to present buried construction procedures, which do not otherwise allow for future upgrades or replacement of initially installed ...

    SBIR Phase II 2007 Department of Transportation
  5. Hybrid Reactive Materials for Thermobaric Weapons

    SBC: REACTIVE METALS, INC.            Topic: DTRA06010

    It is proposed to produce and evaluate hybrid powders containing highly reactive filler coated by or embedded into a matrix of readily boiling, combustible binder. The binder material, such as paraffin wax and Viton-like rubber, are expected to ignite and burn within the expanding fireball while the reactive filler remains at the relatively low temperature at which the binder boils, and thus rema ...

    SBIR Phase II 2007 Department of DefenseDefense Threat Reduction Agency
  6. New Methods for Progressive Collapse Testing and Simulation

    SBC: Thornton Tomasetti, Inc.            Topic: DTRA06003

    The potential for progressive collapse of buildings damaged by terrorist blasts represents a significant risk to building occupants. There is a need for software tools that assess the potential for progressive collapse of above ground structures. These tools should run quickly and accurately predict the collapsed region of a damaged structure. These tools would be of great value to security pla ...

    SBIR Phase II 2007 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government