List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  2. A LASER-BASED HIGH SENSITIVITY EXPLOSIVES DETECTOR

    SBC: Eastern Analytical Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  3. ALTERNATIVE APPROACHES TO INTEGRATED DAMAGE CONTROL SYSTEMS FOR USCG VESSELS

    SBC: HUGHES ASSOC., INC.            Topic: N/A

    INTEGRATED DAMAGE CONTROL SYSTEMS (IDCS) HAVE THE POTENTIAL TO IMPROVE MONITORING, DECISION-MAKING, AND RESPONSE TO SHIPBOARD EMERGENCIES. ULTIMATELY, IMPLIMENTATION OF THESE SYSTEMS MAY REDUCE MANPOWER. THE TECHNICAL OBJECTIVE OF PHASE I WILL BE TO PROVIDE THE USCG WITH SEVERAL DESIGN CONCEPTS FOR INSTALLING IDCS ON USCG SHIPS. THIS WILL INCLUDE ALTERNATIVES FOR HARDWARE AND SOFTWARE AS A FUNCTIO ...

    SBIR Phase I 1992 Department of Transportation
  4. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    A NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...

    SBIR Phase II 1992 Department of Transportation
  5. INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS

    SBC: Omega Point Laboratorytorie            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  6. RETROFITTABLE TRAIN ALERTER DEVICE REQUIRING COGNITIVE RESPONSE

    SBC: Pulse Electronics Inc            Topic: N/A

    SIGNIFICANT IMPROVEMENTS HAVE BEEN MADE TO TRAIN ALERTER DEVICES SINCE THE INCEPTION OF THE "DEAD-MAN PEDAL." THERE CONTINUES TO BE ROOM FOR ADDITIONAL ENHANCEMENTS, PARTICULARLY IN LIGHT OF TECHNOLOGICAL ADVANCES IN THE FIELD OF ERGONOMICS AND HUMAN FACTORS. ONE AREA OF POSSIBLE IMPROVEMENT LIES IN THE RESPONSE THAT THE DEVICE REQUIRES FROM THE LOCOMOTIVE ENGINEER. DEVICES CURRENTLY IN USE HAVE B ...

    SBIR Phase I 1992 Department of Transportation
  7. NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION

    SBC: Stress Eng Services, Inc            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government