You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Satellite Operator Decision Aid And Training System (SODATS)

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    In response to Small Business Innovative Research solicitation AF01-053, 21CSI is pleased to propose the development of a proof-of-concept software decision aid for satellite command composition. Our decision aid, the Satellite Operator Decision Aid andTraining System (SODATS), will be built from the bottom up to support both operator training and operational usage. It will employ intelligent agen ...

    SBIR Phase I 2001 Department of DefenseAir Force
  2. Intelligent Agent-Based Software Architecture for Combat Performance Under Overwhelming Information Inflow and Uncertainty

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    21st Century Systems, Inc. proposes to research and realize agent-based decision support system under uncertainty for submarineoperations. We will use a highly innovative hybridBayesian/differential game modeling approach to tackle thisproblem. The resulting theory and technology will facilitatesubmarine options by addressing such practical problems astradeoff evaluation for course of action and ...

    SBIR Phase II 2001 Department of DefenseNavy
  3. Tasking, Processing, Exploitation, and Dissemination (TPED)-Knowledge Acquisition and Assessment System (KAAS)

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    In response to Small Business Innovative Research solicitation OSD01-CR10, 21CSI is pleased to propose the development of a proof-of-concept software knowledge assessment tool for TPED teams. Our assessment tool, the TPED Knowledge Acquisition andAssessment System (TPED-KAAS), will be built from the bottom up to support TPED team assessment and training. The heart of this system will be a unique ...

    SBIR Phase I 2001 Department of DefenseAir Force
  4. Agents and Avatars in the Aerospace Operations Center in Support of Combat Operations

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    For efficient space operations, and for effective space force enhancement to terrestrial forces, Aerospace Operations Center (AOC) personnel must be continuously aware of the status of on-orbit assets, payload coverage, reacting to system degradations andfailures, and responding to intolerant environments for satellites. To complete the situational awareness picture, there is also the need to depi ...

    SBIR Phase I 2001 Department of DefenseAir Force
  5. Agents and Avatars in the Aerospace Operations Center in Support of Combat Operations

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    For efficient space operations, and for effective space force enhancement to terrestrial forces, Aerospace Operations Center (AOC) personnel must be continuously aware of the status of on-orbit assets, payload coverage, reacting to system degradations andfailures, and responding to intolerant environments for satellites. To complete the situational awareness picture, there is also the need to depi ...

    SBIR Phase II 2001 Department of DefenseAir Force
  6. Fast Room Temperature Cure Adhesive for Fiber Optic Connector

    SBC: Advanced Material Systems            Topic: N/A

    Standard U.S. Navy fiber optic assemblies require that the fiber be bonded to the connector using an adhesive that is labor intensive and heat controlled (MIL-A-24792). Advanced Material Systems (AMS) proposes a study that could solve this problem through the development of an adhesive system that would cure at room temperature in less that 3 minutes and yet meet all of the in-service req ...

    SBIR Phase I 1996 Department of DefenseNavy
  7. An Integrated ECP for Low Cost EMP Protection of Navy Sites/Stations

    SBC: Electra Magnetic Applications            Topic: N/A

    The development of an innovative low cost RHP hardening approach is proposed for Navy sitee/atations. The Hardening solution ie defined in the form of an ECP, and focuses on reducing costs by having an integrated approach to the design, fabrication, installation, testing, and maintenance of the shield systems. The approach uses prefab parts as much am possible. The coat effectiveness of several co ...

    SBIR Phase I 1992 Department of DefenseNavy
  8. Covert Operations Detection in the Littoral

    SBC: NEPTUNE SCIENCES, INC.            Topic: N/A

    Waves and resulting surf play key roles in coastal processes andin affecting many activities including military operations.During successful Phase I research addressing the Office of NavalResearch (ONR) SBIR Topic N98-134,

    SBIR Phase II 2001 Department of DefenseNavy
  9. PCMCIA Card to Collect/Store Vibration/Performance Data for Operating Machinery

    SBC: OMNI TECHNOLOGIES, INC.            Topic: N/A

    This proposal is to complete the detailed design and construct aprototype of theWeighted Oceanographic Registration Mine (WORM). The Mine isdesigned to beautonomously deployed for periods of up to 90 days. During thattime, it willinstrument and record data on acoustic energy, seismic events,burial of the mine,water flow in the vicinity of the mine, water pressure, attitude,orientation,and various ...

    SBIR Phase I 2001 Department of DefenseNavy
  10. PCMCIA Card to Collect/Store Vibration/Performance Data for Operating Machinery

    SBC: OMNI TECHNOLOGIES, INC.            Topic: N/A

    This proposal is to complete the detailed design and construct aprototype of theWeighted Oceanographic Registration Mine (WORM). The Mine isdesigned to beautonomously deployed for periods of up to 90 days. During thattime, it willinstrument and record data on acoustic energy, seismic events,burial of the mine,water flow in the vicinity of the mine, water pressure, attitude,orientation,and various ...

    SBIR Phase II 2001 Department of DefenseNavy
US Flag An Official Website of the United States Government