You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: Algorithm Design & Measurement            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of DefenseNavy
  2. Fast Room Temperature Cure Adhesive for Fiber Optic Connector

    SBC: Advanced Material Systems            Topic: N/A

    Standard U.S. Navy fiber optic assemblies require that the fiber be bonded to the connector using an adhesive that is labor intensive and heat controlled (MIL-A-24792). Advanced Material Systems (AMS) proposes a study that could solve this problem through the development of an adhesive system that would cure at room temperature in less that 3 minutes and yet meet all of the in-service req ...

    SBIR Phase I 1996 Department of DefenseNavy
  3. FOURIER DOMAIN TECHNIQUE TO COMPUTE TOMOGRAPHY SCANNER WITH DIGITAL RADIOGRAPHY CAPABILITY

    SBC: BIO-IMAGING RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseNavy
  4. Full-Spectrum Classification Algorithms for Broadband Passive Sonar

    SBC: Carolinian Systems Research            Topic: N/A

    Algorithms will be developed for the detection and classification of broadband signals by passive sonar. Principal interest is in shallow-water applications. The algorithms will be based on an approach that does not require knowledge of data statistics, yet provides an approximation to the likelihood ratio. Both signal-adaptive and non-adaptive versions will be developed. Computational evalua ...

    SBIR Phase I 1996 Department of DefenseNavy
  5. Nondestructive Quantitative Inspection Instrument For Concrete Deterioration

    SBC: Construction Technology            Topic: N/A

    The Navy's reinforced concrete structures represent an invaluable asset to the nation's defense preparedness. However, some facilities are approaching a critical state of disrepair and represent a substantial facility management burden due to uncontrolled severe deterioration of reinforced concrete in marine environments. Naval Facilities Engineering Service Center's professionals estimate that ...

    SBIR Phase I 1996 Department of DefenseNavy
  6. Development of 6H-SIC CMOS Transistors for Insertion into a 3500C Operational Amplifier

    SBC: CREE RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseNavy
  7. Submarine Electrical Hull Penetrators/Connectors

    SBC: D. G. O'brien, Inc.            Topic: N/A

    Recent trends in submarine design indicate the need for-locating more electrical components, such as propulsion motors and actuators, outside the pressure hull. As a result, there is a need for electrical hull penetrators/connectors which can transfer high currents or high voltages through the submarine's pressure hull. We propose to review the capabilities and limitations of existing penetrator/ ...

    SBIR Phase I 1996 Department of DefenseNavy
  8. Unmanned Aerial Vehicle Electronic Decoy Payload

    SBC: Dedicated Electronics, Inc.            Topic: N/A

    Enemy forces can be crippled quickly at the beginning of a war by separating the enemies command and control structure from its combat forces and other elements of its defensive network. A false target generator has the potential to saturate or tie up an enemies air defense net and increase survivability of our own airborne assets. An unmanned aerial vehicle (UAV) is an optimum candidate for a dec ...

    SBIR Phase II 1996 Department of DefenseNavy
  9. Radar Signature Modeling for Missile and Target Encounter

    SBC: DEMACO, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseNavy
  10. Shock Resistant Single-Mode Fiber Optic Connector

    SBC: DIGITAL OPTICS CORP.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseNavy
US Flag An Official Website of the United States Government